Annual Assessment Letter - Surry Power Station (NRC Inspection Reports 05000280/2006001 & 05000281/2006001
ML060610419
Person / Time
Site: Surry  
Issue date: 03/02/2006
From: Landis K
NRC/RGN-II/DRP/RPB5
To: Christian D
Virginia Electric & Power Co (VEPCO)
Shared Package
ML060610416 List:
References
IR-06-001
Download: ML060610419 (4)


See also: IR 05000280/2006001

Text

March 2, 2006

Virginia Electric and Power Company

ATTN.: Mr. David A. Christian

Sr. Vice President and

Chief Nuclear Officer

Innsbrook Technical Center - 2SW

5000 Dominion Boulevard

Glen Allen, VA 23060-6711

SUBJECT:

ANNUAL ASSESSMENT LETTER - SURRY POWER STATION (NRC

INSPECTION REPORTS 05000280/2006001 AND 05000281/2006001)

Dear Mr. Christian:

On February 9, 2006, the NRC staff completed their performance review of the Surry Power

Station. Our technical staff reviewed performance indicators (PIs) for the most recent quarter

and inspection results for the period from January 1 through December 31, 2005. The purpose

of this letter is to inform you of our assessment of your safety performance during this period

and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include physical protection

information. A separate letter, designated and marked as Official Use Only - Security-Related

Information, will include the physical protection review and resultant inspection plan.

Overall, Surry Station Units 1 and 2 operated in a manner that preserved public health and

safety and fully met all cornerstone objectives. Plant performance for the most recent quarter,

as well as for the first three quarters of the assessment cycle, was within the Licensee

Response column of the NRCs Action Matrix. We base this conclusion on the fact that all

inspection findings were classified as having very low safety significance (Green) and all PIs

indicated performance at a level requiring no additional NRC oversight (Green). Therefore, we

plan to conduct reactor oversight process (ROP) baseline inspections at your facility. We also

plan on conducting non-ROP inspections of your Independent Spent Fuel Storage Facility and a

special inspection of the Unit 2 containment sump.

The enclosed inspection plan details the inspections, less those related to physical protection

scheduled through September 30, 2007. The inspection plan is provided to allow for the

resolution of any scheduling conflicts and personnel availability issues well in advance of

inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and

continuous nature. The inspections in the last nine months of the inspection plan are tentative

and may be revised at the mid-cycle review. Although our intent is to maintain the enclosed

inspection plan fixed for the first nine months, a need may arise to conduct one or more

unanticipated inspections prior to issuing an updated inspection plan with the 2006 assessment

cycle mid-cycle letter.

VEPCO

2

If an inspection of this type becomes necessary, we will notify you of the planned inspection

dates as soon as possible to resolve as much as we can, any scheduling and personnel

availability conflicts you may have.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be made available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to

discuss the change as soon as possible. Please contact me at (404) 562-4510 with any

questions you may have regarding this letter or the inspection plan.

Kerry D. Landis, Chief

/RA/

Reactor Projects Branch 5

Division of Reactor Projects

Docket Nos.: 50-280, 50-281

License Nos.: DPR-32, DPR-37

Enclosure: Surry Inspection/Activity Plan

cc w/encl: (See page 3)

VEPCO

3

cc w/encl:

Chris L. Funderburk, Director

Nuclear Licensing and

Operations Support

Virginia Electric & Power Company

Electronic Mail Distribution

Donald E. Jernigan

Site Vice President

Surry Power Station

Virginia Electric & Power Company

Electronic Mail Distribution

Virginia State Corporation Commission

Division of Energy Regulation

P. O. Box 1197

Richmond, VA 23209

Lillian M. Cuoco, Esq.

Senior Counsel

Dominion Resources Services, Inc.

Electronic Mail Distribution

Attorney General

Supreme Court Building

900 East Main Street

Richmond, VA 23219

Institute of Nuclear Power Operations

700 Galleria Parkway

Atlanta, GA 30339-5957

Distribution w/encl: (See page 4)

_________________________

OFFICE

DRP:RII

SIGNATURE

LXG1

NAME

LGarner:aws

DATE

03/01/2006

E-MAIL COPY?

YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO