ML060610258

From kanterella
Jump to navigation Jump to search

RBS-MC6328-Correct Letter to Licensee for Amendment No. 150
ML060610258
Person / Time
Site: River Bend Entergy icon.png
Issue date: 03/03/2006
From: Bhalchandra Vaidya
Plant Licensing Branch III-2
To: Hinnenkamp P
Entergy Operations
vaidya B, NRR/DLPM, 415-3308
References
TAC MC6328
Download: ML060610258 (4)


Text

March 03, 2006 Mr. Paul D. Hinnenkamp Vice President - Operations Entergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775

SUBJECT:

RIVER BEND STATION, UNIT 1 - CORRECTION TO RIVER BEND STATION AMENDMENT NO. 150 (TAC NO. MC6328)

Dear Mr. Hinnenkamp:

The Nuclear Regulatory Commission (NRC) issued License Amendment No. 150 to Facility Operating License No. NPF-47 for the River Bend Station, Unit 1 (RBS), on February 9, 2006.

The amendment consisted of changes to the Technical Specifications (TSs) in response to your application dated March 8, 2005, as supplemented by letter dated January 17, 2006.

The amendment allowed a one-time TS change for RBS. The change extended the test interval for the next Appendix J, Type A test an additional four months beyond the 5-year extension already granted by the staff to the nominal 10-year interval.

Due to an administrative oversight, the following typographical errors occurred inadvertently while dispatching the amendment package:

The amendment number 150" was not inserted on the second page of the license.

The date at the bottom of the second page of the license should be February 9, 2006.

The amended TS Page 5.0-16 should show the amendment number 150" in the bottom right corner of the page.

The date at the bottom of page 6 of the safety evaluation should be February 9, 2006.

The corrected pages are enclosed. Please replace the pages in the approved amendment transmittal, dated February 9, 2006, with the corrected pages.

The staff's Safety Evaluation and conclusions contained in the approved amendment transmittal dated February 9, 2006, are not affected by these corrections.

We regret any inconvenience this may have caused.

Sincerely,

/RA/

Bhalchandra Vaidya, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-458

Enclosures:

Corrected Pages cc w/encls: See next page The staff's Safety Evaluation and conclusions contained in the approved amendment transmittal dated February 9, 2006, are not affected by these corrections.

We regret any inconvenience this may have caused.

Sincerely,

/RA/

Bhalchandra Vaidya, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-458

Enclosures:

Corrected Pages cc w/encls: See next page DISTRIBUTION:

PUBLIC LPLIV Reading RidsNrrDorl (CHaney/CHolden)

RidsNrrDorlLplg (DTerao)

RidsNrrPMBVaidya RidsNrrLADJohnson RidsOgcRp RidsAcrsAcnwMailCenter RidsRgn4MailCenter (KKennedy)

RidsNrrDirsItsb (TBoyce)

JPulsipher TCheng RidsNrrDlpmDpr (BKS1)

RPalla GHill(2)

Accession No.:

OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NAME BVaidya DJohnson DTerao DATE 3/3/06 3/3/06 3/3/06 OFFICIAL RECORD COPY

May 2005 River Bend Station cc:

Winston & Strawn 1700 K Street, N.W.

Washington, DC 20006-3817 Manager - Licensing Entergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 Senior Resident Inspector P. O. Box 1050 St. Francisville, LA 70775 President of West Feliciana Police Jury P. O. Box 1921 St. Francisville, LA 70775 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Ms. H. Anne Plettinger 3456 Villa Rose Drive Baton Rouge, LA 70806 Mr. Michael E. Henry, State Liaison Officer Department of Environmental Quality Permits Division P.O. Box 4313 Baton Rouge, Louisiana 70821-4313 Wise, Carter, Child & Caraway P. O. Box 651 Jackson, MS 39205 Executive Vice President and Chief Operating Officer Entergy Operations, Inc.

P. O. Box 31995 Jackson, MS 39286-1995 General Manager - Plant Operations Entergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 Director - Nuclear Safety Entergy Operations, Inc.

River Bend Station 5485 US Highway 61N St. Francisville, LA 70775 Vice President - Operations Support Entergy Operations, Inc.

P. O. Box 31995 Jackson, MS 39286-1995 Attorney General State of Louisiana P. O. Box 94095 Baton Rouge, LA 70804-9095 Brian Almon Public Utility Commission William B. Travis Building P. O. Box 13326 1701 North Congress Avenue Austin, Texas 78701-3326