ML060590170
Jump to navigation
Jump to search
| ML060590170 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 02/27/2006 |
| From: | Bozin S NRC/EDO |
| To: | Jaegers C NRC/EDO |
| References | |
| CPPR-149, G20060191 | |
| Download: ML060590170 (1) | |
Text
EDO Principal Correspondence Control FROM:
DUE: 03/28/06 EDO CONTROL: G20060191 DOC DT: C2/27/06 FINAL REPLY:
Sunny Bozin, OEDO C. Jaegers, OEDO FOR SIGNATURE OF :
- GRN **
CRC NO:
DESC:
ROUTING:
Briefing Package for Site Visit to Perry on April 4-5, 2006 DATE: 02/27/06 Reyes Virgilic' Kane Silber Dean Cyr/Burns Dixon-Herrity, OEDO ASSIGNED TO:
CONTACT:
RIII Caldwell SPECIAL INSTRUCTIONS OR REMARKS:
NO DOCUMENTATION ATTACHED.
Prepare briefing package with bios for DEDR's Site Visit to Jennifer Dixon-Herrity, OEDO by March 28, 2006.
Crwp{ AV a-hO4bo(
C-0-6s; Eb°-o(