Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402-2801 February 21, 2006 10 CFR 50.54(f)
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Gentlemen:
In the Matter of Tennessee Valley Authority
)
Docket Nos. 50-327 50-328 50-390 SEQUOYAH NUCLEAR PLANT (SQN) AND WATTS BAR NUCLEAR PLANT (WBN) -
RESPONSE TO NUCLEAR REGULATORY COMMISSION GENERIC LETTER (GL) 2006-01: STEAM GENERATOR (SG) TUBE INTEGRITY AND ASSOCIATED TECHNICAL SPECIFICATIONS (TS)
As requested in Option 1 of GL 2006-01, this letter confirms that requests have been submitted to modify the SG portion of the SQN and WBN TS consistent with Technical Specification Task Force (TSTF) Standard Technical Specification Traveler, TSTF-449, "Steam Generator Tube Integrity," Revision 4.
The SQN Unit 1 request to modify the SG portion of the technical specification to be consistent with TSTF-449, Revision 4, was submitted by letter dated August 31, 2005. The SQN Unit 2 request was submitted by letter dated February 15, 2006. The WBN Unit 1 request was submitted by letter dated December 15, 2005.
There are no regulatory commitments contained in this letter. If you have any questions about this response, please contact Russell Thompson at (423) 751-7737.
P ted on rwcycWd paper
U.S. Nuclear Regulatory Commission Page 2 February 21, 2006 I declare under penalty of perjury that the foregoing is true and correct. Executed on this 21st day of February 2006.
Sincerely, Glenn W. Morris Manager, Corporate Nuclear Licensing and Industry Affairs cc: Mr. Douglas V. Pickett, Senior Project Manager U.S. Nuclear Regulatory Commission MS 08G9A One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2738 Regional Administrator Region II U.S. Nuclear Regulatory Commission Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303-8931 NRC Senior Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379-3624 NRC Senior Resident Inspector Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381-2000