CPSES-200600283, 30-Day Response to NRC Generic Letter 2006-01, Steam Generator Tube Integrity and Associated Technical Specifications
| ML060530381 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 02/16/2006 |
| From: | Blevins M, Madden F TXU Generation Co, LP, TXU Power |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| CPSES-200600283, GL-06-001, TXX-06027 | |
| Download: ML060530381 (2) | |
Text
- 1 Ab TXU Power TXU Power Comanche Peak Sleam Ekctric Station P. 0. Box 1002 (E1i)
Glen Rose, TX 76043 Tel: 254 897 5209 Fax: 254 897 6652 mike.blevinsbtxucom Mike Blevins Senior Vice President &
Chief Nuclear Officer Ref: GL 2006-01 CPSES-200600283 Log #TXX-06027 February 16, 2006 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 30-DAY RESPONSE TO NRC GENERIC LETTER 2006-01, "STEAM GENERATOR TUBE INTEGRITY AND ASSOCIATED TECHNICAL SPECIFICATIONS" REF: TXU Power letter, logged TXX-05182, from Mike Blevins to the U. S. Nuclear Regulatory Commission, dated December 16, 2005.
Gentlemen:
By means of the above referenced. letter, TXU Generation Company LP (TXU Power) submitted License Amendment Request (LAR) 2004-010; "Application For Technical Specification Improvement Regarding Steam Generator Tube Integrity."
This LAR proposed a revised Steun Generator Technical Specification consistent with NRC-approved Revision 4 to Technical Specification Task Force (TSTF)
Standard Technical Specification Change Traveler, TSTF-449, "Steam Generator Tube Integrity."
This communication contains no new or revised licensing basis commitments.
Should you have any questions, please contact Mr. Bob Kidwell at (254) 897-5310.
A 4I Q" A member of the STARS Strategic Teaming and Resource Sharing) Alliance Callaway
- Comanche Peak
- Diablo Canyon
- Palo Verde
- South Texas Project
- Wolf Creek
U '
TXX-06027 Page 2 of 2 I state under penalty of perjury that the foregoing is true and correct.
Executed on 16 February, 2006 Sincerely, TXU Generation Company LP By:
TXU Generation Management Company LLC Its General Partner Mike Blevins By: Hi Gjl2K7Q1 Fred W. Madden Director, Regulatory Affairs RJK c -
B. S. Mallett, Region IV M. C. Thadani, NRR Resident Inspectors, CPSES