February 10, 2006 Mr. R. T. Ridenoure Vice President - Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
Post Office Box 550 Fort Calhoun, NE 68023-0550
SUBJECT:
FORT CALHOUN STATON, UNIT 1 - WITHDRAWAL OF AN AMENDMENT REQUEST (TAC NO. MC9296)
Dear Mr. Ridenoure:
By letter to the Nuclear Regulatory Commission (NRC) dated December 19, 2005, Omaha Public Power District (OPPD/the licensee) applied for an amendment to the Fort Calhoun Station, Unit No. 1 (FCS), Facility Operating License No. DPR-40. The proposed change would have revised the FCS Technical Specifications (TS) pertaining to TS Table 3-13, Steam Generator Tube Inspection, and would have deleted TS Table 3-14, Steam Generator Tube Sleeve Inspection. Specifically, this proposed change would have deleted the sleeving repair alternative for the plugging steam generator tubes.
The NRC staff determined that additional information is needed to complete the review. OPPD stated that because the review has been extended possibly beyond the upcoming refueling outage, a decision was made to withdraw the amendment request. The licensee plans to resubmit an amendment implementing Technical Specification Task Force (TSTF)-449 instead.
As such, by letter dated January 20, 2006, OPPD withdrew the amendment request.
The purpose of this letter is to advise that the above cited application is being treated as withdrawn. The Notice of Consideration of Issuance of the proposed amendment had not been published in the Federal Register.
Sincerely,
/RA/
Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-285 cc: See next page
ML060470321 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NAME AWang LFeizollahi DTerao DATE 02/10/06 02/09/06 02/10/06
January 2006 Ft. Calhoun Station, Unit 1 cc:
Winston & Strawn ATTN: James R. Curtiss, Esq.
1400 L Street, N.W.
Washington, DC 20005-3502 Chairman Washington County Board of Supervisors P.O. Box 466 Blair, NE 68008 Mr. John Hanna, Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 310 Fort Calhoun, NE 68023 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Ms. Julia Schmitt, Manager Radiation Control Program Nebraska Health & Human Services R & L Public Health Assurance 301 Centennial Mall, South P.O. Box 95007 Lincoln, NE 68509-5007 Mr. David J. Bannister, Manager Fort Calhoun Station Omaha Public Power District Fort Calhoun Station FC-1-1 Plant P.O. Box 550 Fort Calhoun, NE 68023-0550 Mr. Joe L. McManis Manager - Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
P.O. Box 550 Fort Calhoun, NE 68023-0550 Mr. Daniel K. McGhee Bureau of Radiological Health Iowa Department of Public Health Lucas State Office Building, 5th Floor 321 East 12th Street Des Moines, IA 50319