MONTHYEARML22333B0922022-12-21021 December 2022 FY22 Nmss/Duwp Operating Experience Report ML21271A5992021-08-0303 August 2021 License Amendment Request (LAR) 21-01, Chapter 8, 12, Omaha Public Power District, FCS-SAF-103, FCS Deconstruction Health and Safety Plan CAC2 ML21055A4022021-05-14014 May 2021 Memorandum: Final Environmental Assessment and Finding of No Significant Impact of Initial and Updated Decommissioning Funding Plans for the Cooper, Fort Calhoun and Virgil C. Summer Independent Spent Fuel Storage Installations ML21271A1492021-04-13013 April 2021 License Amendment Request (LAR) 21-01, Chapter 1 9 Haley & Aldrich, Inc. Memorandum to Energysolutions, File No. 0127960-006, Fort Calhoun Nuclear Power Statio~1 ML20056E4872020-02-26026 February 2020 Staff Review of Fort Calhoun Independent Spent Fuel Storage Installation Physical Security Plan, Security Training and Qualification Plan, and Safeguard Contingency Plan, Revision 0 and the Verification of Additional Security Measures (ASM) ML18173A0082018-06-20020 June 2018 Cancelling Numerous Inspection Report Numbers ML18108A1212018-04-11011 April 2018 American Nuclear Insurers - Notification of Change in the Number of Power Reactors in the Secondary Financial Protection (SFP) Program ML17275A2642017-11-21021 November 2017 Safety Evaluation Input on Fort Calhoun Station Request for Approval of Permanently Defueled Emergency Plan and Emergency Action Level Scheme, Docket No. 50-285 ML16057A1232016-02-26026 February 2016 Cy 2015 Baseline Completion ML16007A4942016-01-11011 January 2016 Review of the Updated Final Safety Analysis Report for the Period June 14, 2014 Through December 4, 2015 ML14163A0022014-06-16016 June 2014 Summary of Audit Conducted March 5-9, 2012, Request to Adopt National Fire Protection Association (NFPA) 805, Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML14129A4452014-05-12012 May 2014 5/13/2014 Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Cooper Nuclear Station and Fort Calhoun Station, Unit 1 ML14114A7012014-04-24024 April 2014 Task Interface Agreement - Concurrence on Fort Calhoun Tornado Missile Protection Licensing Basis (TIA 2013-07) ML14085A1842014-03-28028 March 2014 Final Fort Calhoun Gothic TIA Response ML14016A2602014-01-28028 January 2014 Fc Final Containment Structural TIA ML13351A4762013-12-16016 December 2013 Recommendation for NRC to Close Confirmatory Action Letter EA-13-020 Supporting the Restart of Fort Calhoun Station and Recommendation to Issue Post-Restart Confirmatory Action Letter ML13346A0822013-12-12012 December 2013 Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Cooper Nuclear Station and Fort Calhoun Station, Unit 1 ML13312A8522013-11-0808 November 2013 Meeting Notice with Public to Discuss Fort Calhoun Station ML13253A3542013-09-27027 September 2013 Letter to R. Morris Information Exchange Pertaining to Health Issues Related to Crow Butte Resources Uranium Mine and Ft. Calhoun Nuclear Generating Station ML13102A1892013-04-15015 April 2013 4/22/12 Notice of Closed Meeting with Omaha Public Power District to Discuss Flooding Issues Associated with Fort Calhoun, Unit 1 ML13101A2232013-04-11011 April 2013 Meeting Notice with Omaha Public Power District - Potential License Amendment Requests for Fort Calhoun, Unit 1 Related to Flood Protection for Raw Water System, Tornado Missile Protection, Piping/Code Use, and Alternate Seismic Criteria ML13066A8772013-03-0707 March 2013 Issuance of Revised U.S. Nuclear Regulatory Commission Manual Chapter 0350 Panel Fort Calhoun Station Restart Checklist Basis Document ML13046A3212013-02-19019 February 2013 Notice of Closed Meeting with Fort Calhoun to Discuss Safeguards Information, Proprietary, or Other Sensitive Information ML12345A2702012-11-30030 November 2012 Revised 12/12/2012 Notice of Forthcoming Meeting with Omaha Public Power District to Discuss Containment Internal Structures Issues to Support Restart of Fort Calhoun Station, Unit 1 ML12335A1652012-11-30030 November 2012 Forthcoming Meeting with Omaha Public Power District to Discuss Containment Internal Structures Issues to Support Restart of Fort Calhoun Station, Unit 1 ML12318A3192012-11-13013 November 2012 Issuance of U.S. Nuclear Regulatory Commission Manual Chapter 0350 Panel Fort Calhoun Station Restart Checklist Basis Document ML12251A3172012-09-0707 September 2012 Manual Chapter 0350 Oversight Panel Charter - Revision ML12066A0302012-03-29029 March 2012 Closure Memorandum: Issue for Resolution 2011-001 Fort Calhoun - Failure to Maintain External Flooding Procedures. ML12229A1842012-03-0606 March 2012 Backfit Panel Regarding Fort Calhoun Flooding ML1134707162011-12-13013 December 2011 Memo to M.S.Virgilio Notification of Change to Regulatory Oversight of Fort Calhoun Station ML11293A1982011-10-19019 October 2011 Charter for Backfit Panel on Postulated Failure of Upstream Dams Affecting Fort Calhoun Station ML1118811312011-07-0707 July 2011 Docketing of Nonproprietary Information Provided by Omaha Public Power District (OPPD) Personnel Following the June 2, 2011, Regulatory Conference ML13106A1702011-07-0101 July 2011 Proposed Adequate Protection Backfit Exception ML11174A2322011-06-21021 June 2011 for the Record-06-21-2011: NRC Ensures Public Safety Through Rigorous Oversight of Nuclear Power Plant Safety Standards ML1113807322011-05-18018 May 2011 Regulatory Conference with Omaha Public Power ML1113306432011-05-16016 May 2011 Notice of Forthcoming Prelicensing Teleconference on 5/26/11 with Omaha Public Power District Related to Fort Calhoun Station, Unit 1's License Amendment Submittal Related to Transition to Risk-Informed NFPA-805 ML1109103272011-04-0505 April 2011 Verbal Authorization, Request for Relief from Code Case N-722 Visual Examination of the Reactor Vessel Hot-Leg Nozzle-to-Safe-End Dissimilar Metal Welds, 4th 10-Year Inservice Inspection Interval ML1108106952011-03-23023 March 2011 Notice of Forthcoming Pre-Licensing Meeting with Omaha Public Power District to Discuss Its Plans to Submit an Extended Power Uprate for Fort Calhoun Station and Issues Related to Equipment Environmental Qualification ML1104808672011-02-18018 February 2011 03/2/2011 Notice of Forthcoming Closed Pre-Licensing Teleconference with Omaha Public Power District to Discuss Its Plans to Submit an Extended Power Uprate for Fort Calhoun Station and Issues Related to Control Rod Withdrawal at Power ML1035605482010-12-23023 December 2010 Notice of Forthcoming Pre-Licensing Meeting with Omaha Public Power District to Discuss Fort Calhoun Station'S Extended Power Uprate, Spent Fuel Pool Criticality, and Proposed License Amendment Request Modeled After TSTF-493 ML1020701262010-08-30030 August 2010 the Nuclear Regulatory Commission Staff Spot-Check Review of Fort Calhoun Station Unit 1, June 30, 2010 - Finding of No Potential Issues in Bank Statements ML1016205062010-06-14014 June 2010 Notice of Forthcoming Teleconference Meeting with Omaha Public Power District to Discuss NRC Staff Request for Additional Information Dated 2/12/2010 on Generic Letter 2004-02 for Fort Calhoun Station, Unit 1 ML1006010322010-03-0101 March 2010 Cy 2009 Baseline Inspection Completion ML1004302742010-02-12012 February 2010 Notice of Forthcoming Teleconference with Omaha Public Power District to Discuss NRC Staff Request for Additional Information on Generic Letter 2004-02 for Fort Calhoun Station, Unit 1 ML0909607752009-04-0606 April 2009 Notice of End-of-Cycle Meeting with Omaha Public Power District - Fort Calhoun Station to Present and Discuss the Performance Results for the Fort Calhoun Station for the Period of January 1 Though December 31, 2008 ML0901603362009-01-16016 January 2009 Notice of Forthcoming Meeting with Omaha Public Power District, to Discuss the Fort Calhoun Station'S Transition to National Fire Protection Association (NFPA) 805 ML0901504382009-01-16016 January 2009 Notice of Forthcoming Meeting with Omaha Public Power District, to Discuss Oppd'S Plans to Submit an Extended Power Uprate Request for the Fort Calhoun Station, Unit 1 ML0814100052008-06-0303 June 2008 Summary of Conference Call with Omaha Public Power District (OPPD) Regarding OPPD Emergency Relief Request Submitted May 15, 2008 for Fort Calhoun Station (Tac No. MD8722) ML0809404512008-04-18018 April 2008 Summary of 12/6/2006 Meeting with Omaha Public Power District, Regarding Water Management Strategies for Resolution of GSI-191 (Tac No MD5780) ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment 2022-12-21
[Table view] |
Text
January 26, 2006 MEMORANDUM TO: Thomas Martin, Director Division of Safety Systems THRU: David L. Solorio, Chief /RA/
Safety Issues Resolution Branch Division of Safety Systems FROM: Ralph Architzel, Senior Reactor Systems Engineer /RA/
Safety Issues Resolution Branch Division of Safety Systems
SUBJECT:
REPORT ON RESULTS OF STAFF PILOT PLANT AUDIT- FORT CALHOUN STATION ANALYSES REQUIRED FOR THE RESPONSE TO GENERIC LETTER 2004-02 AND GSI-191 RESOLUTION (NON-PROPRIETARY VERSION)
Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, requested that all PWR licensees (1) evaluate the adequacy of the emergency sump recirculation function with respect to potentially adverse effects associated with post-accident debris, and (2) implement any plant modifications the evaluation determined to be necessary. To provide assurance that licensees sump performance evaluations and any subsequent modifications are performed with adequate quality, in addition to reviewing licensees generic letter responses, the staff plans to perform sample audits.
Fort Calhoun Station (FCS), conducted a partial evaluation of recirculation sump performance ahead of the schedule requested by GL 2004-02 and volunteered to be a pilot plant for an NRC staff audit.
The staff has completed an audit of the FCS evaluation. A non-proprietary version of the report containing the audits results is enclosed with this memorandum. In addition to providing the FCS licensee feedback on its sump performance evaluation, another primary purpose of the staffs audit report is to serve as a vehicle to inform and potentially improve other licensees responses to GL 2004-02. The staffs audit report summarizes the plant modifications planned by the licensee to improve recirculation sump performance.
CONTACT: Ralph Architzel, NRR/DSS/SSIB 301-415-2804
T. Martin 2 The staffs audit report provides detailed feedback to the licensee in each section of the sump performance evaluation (e.g., debris generation, debris transport, head loss), identifying areas that were adequately addressed as well as areas where further analysis or justification may be warranted. The audit report includes a review of the proposed design of the licensees planned sump modification, and also reviews the licensees evaluation of upstream and downstream blockage and the other post-accident debris effects identified in GL 2004-02. The audit report concludes by rating each section of the licensees sump performance evaluation into one of three categories: (1) robust, (2) partially complete with an approach that seems reasonable, and (3) limited information.
Enclosures:
- 1. Pilot Plant Audit Report - Fort Calhoun Station Analyses Required for the Response to Generic Letter 2004-02 and GSI-191 Resolution
- 2. Report Appendix II: GE Testing for Fort Calhoun Station
T. Martin 2 The staffs audit report provides detailed feedback to the licensee in each section of the sump performance evaluation (e.g., debris generation, debris transport, head loss), identifying areas that were adequately addressed as well as areas where further analysis or justification may be warranted. The audit report includes a review of the proposed design of the licensees planned sump modification, and also reviews the licensees evaluation of upstream and downstream blockage and the other post-accident debris effects identified in GL 2004-02. The audit report concludes by rating each section of the licensees sump performance evaluation into one of three categories: (1) robust, (2) partially complete with an approach that seems reasonable, and (3) limited information.
Enclosures:
- 1. Pilot Plant Audit Report - Fort Calhoun Station Analyses Required for the Response to Generic Letter 2004-02 and GSI-191 Resolution
- 2. Report Appendix II: GE Testing for Fort Calhoun Station DISTRIBUTION: ADAMS SSIB R/F RArchitzel JLehning DSolorio JHannon TMartin THafera MKowal MYoder SUnikewicz HWaggage SLu RReyes RReyes RLobel AWang LWhitney AHiser JLehning ADAMS PACKAGE #: ML060230447 MEMO: ML060230457 ENCLOSURE1: ML060230461 ENCLOSURE2: ML060240026 NRR-106 OFFICE SSIB:DSS:NRR BC:SSIB:DSS BC:CPTB:DCI LPLA:NRR NAME RArchitzel DSolorio SLee AWang DATE 11 / 7 /05 01 / 26 /06 11 / 8 /05 01 / 25 /06 OFFICE BC:CSGB:DCI NAME AHisor DATE 11 / 21 /05 OFFICIAL RECORD COPY