Non-Proprietary Version: Memo Forwarding Results of Staff Pilot Plant Audit of Fort Calhoun Station Analyses Required for the Response to Generic Letter 2004-02 and GSI-191 Resolution
ML060230457
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 01/26/2006
From: Architzel R
NRC/NRR/ADES/DSS
To: Martin T
NRC/NRR/ADES/DSS
Lehning J, NRR/DSS/SSIB, 415-3285
Shared Package
ML060230447 List:
References
GL-04-002, GSI-191
Download: ML060230457 (3)


Text

January 26, 2006 MEMORANDUM TO: Thomas Martin, Director Division of Safety Systems THRU: David L. Solorio, Chief /RA/

Safety Issues Resolution Branch Division of Safety Systems FROM: Ralph Architzel, Senior Reactor Systems Engineer /RA/

Safety Issues Resolution Branch Division of Safety Systems

SUBJECT:

REPORT ON RESULTS OF STAFF PILOT PLANT AUDIT- FORT CALHOUN STATION ANALYSES REQUIRED FOR THE RESPONSE TO GENERIC LETTER 2004-02 AND GSI-191 RESOLUTION (NON-PROPRIETARY VERSION)

Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, requested that all PWR licensees (1) evaluate the adequacy of the emergency sump recirculation function with respect to potentially adverse effects associated with post-accident debris, and (2) implement any plant modifications the evaluation determined to be necessary. To provide assurance that licensees sump performance evaluations and any subsequent modifications are performed with adequate quality, in addition to reviewing licensees generic letter responses, the staff plans to perform sample audits.

Fort Calhoun Station (FCS), conducted a partial evaluation of recirculation sump performance ahead of the schedule requested by GL 2004-02 and volunteered to be a pilot plant for an NRC staff audit.

The staff has completed an audit of the FCS evaluation. A non-proprietary version of the report containing the audits results is enclosed with this memorandum. In addition to providing the FCS licensee feedback on its sump performance evaluation, another primary purpose of the staffs audit report is to serve as a vehicle to inform and potentially improve other licensees responses to GL 2004-02. The staffs audit report summarizes the plant modifications planned by the licensee to improve recirculation sump performance.

CONTACT: Ralph Architzel, NRR/DSS/SSIB 301-415-2804

T. Martin 2 The staffs audit report provides detailed feedback to the licensee in each section of the sump performance evaluation (e.g., debris generation, debris transport, head loss), identifying areas that were adequately addressed as well as areas where further analysis or justification may be warranted. The audit report includes a review of the proposed design of the licensees planned sump modification, and also reviews the licensees evaluation of upstream and downstream blockage and the other post-accident debris effects identified in GL 2004-02. The audit report concludes by rating each section of the licensees sump performance evaluation into one of three categories: (1) robust, (2) partially complete with an approach that seems reasonable, and (3) limited information.

Enclosures:

1. Pilot Plant Audit Report - Fort Calhoun Station Analyses Required for the Response to Generic Letter 2004-02 and GSI-191 Resolution
2. Report Appendix II: GE Testing for Fort Calhoun Station

T. Martin 2 The staffs audit report provides detailed feedback to the licensee in each section of the sump performance evaluation (e.g., debris generation, debris transport, head loss), identifying areas that were adequately addressed as well as areas where further analysis or justification may be warranted. The audit report includes a review of the proposed design of the licensees planned sump modification, and also reviews the licensees evaluation of upstream and downstream blockage and the other post-accident debris effects identified in GL 2004-02. The audit report concludes by rating each section of the licensees sump performance evaluation into one of three categories: (1) robust, (2) partially complete with an approach that seems reasonable, and (3) limited information.

Enclosures:

1. Pilot Plant Audit Report - Fort Calhoun Station Analyses Required for the Response to Generic Letter 2004-02 and GSI-191 Resolution
2. Report Appendix II: GE Testing for Fort Calhoun Station DISTRIBUTION: ADAMS SSIB R/F RArchitzel JLehning DSolorio JHannon TMartin THafera MKowal MYoder SUnikewicz HWaggage SLu RReyes RReyes RLobel AWang LWhitney AHiser JLehning ADAMS PACKAGE #: ML060230447 MEMO: ML060230457 ENCLOSURE1: ML060230461 ENCLOSURE2: ML060240026 NRR-106 OFFICE SSIB:DSS:NRR BC:SSIB:DSS BC:CPTB:DCI LPLA:NRR NAME RArchitzel DSolorio SLee AWang DATE 11 / 7 /05 01 / 26 /06 11 / 8 /05 01 / 25 /06 OFFICE BC:CSGB:DCI NAME AHisor DATE 11 / 21 /05 OFFICIAL RECORD COPY