ML060190332

From kanterella
Jump to navigation Jump to search
Notice of Meeting with Nuclear Management Company, LLC, to Discuss Results of Current Licensee Performance Self-assessments in the Areas of Engineering and Corrective Actions and to Discuss Future Actions to Improve Performance in These Are
ML060190332
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/19/2006
From: Louden P
NRC/RGN-III/DRP/RPB5
To:
Nuclear Management Co
References
CAL 3-04-001
Download: ML060190332 (3)


Text

January 19, 2006 CAL 3-04-001 NOTICE OF SIGNIFICANT LICENSEE MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee: Nuclear Management Company, LLC (NMC)

Name of Facility: Point Beach Nuclear Plant, Units 1 and 2 Docket Numbers: 50-266; 50-301 Date and Time of Meeting: Thursday, February 2, 2006, 1:00 p.m. (CST)

Location of Meeting: U.S. Nuclear Regulatory Commission Region III Office 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4351 Purpose of Meeting: The purpose of the meeting is to discuss results of current licensee performance self-assessments in the areas of engineering and corrective actions and to discuss future actions to improve performance in these areas.

Category: This is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

NRC Attendees:

J. Caldwell, Regional Administrator G. Grant, Deputy Regional Administrator M. Satorius, Director, Division of Reactor Projects C. Pederson, Director, Division of Reactor Safety E. Hackett, Deputy Director, Division of Operating Reactor Licensing, NRR P. Louden, Chief, Branch 5, Division of Reactor Projects Others as designated Licensee Attendees:

D. Cooper, NMC Senior Vice-President C. Lambert, NMC Vice-President of Engineering D. Koehl, Site Vice-President J. McCarthy, Site Director C. Butcher, Site Engineering Director Others as designated

Notice of Significant Licensee Meeting NOTE: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Mike Kunowski via e-mail or by telephone at

((630) 829-9618) by COB on Tuesday, January 31, 2006. The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRCs meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Interested members of the public can participate in this meeting via a toll-free teleconference. For details, please call the NRC meeting contact.

Approved by: /RA/

Patrick Louden, Chief Branch 5 Division of Reactor Projects Meeting

Contact:

Mike Kunowski Project Engineer (630) 829-9618 MAK3@nrc.gov See Distribution List DOCUMENT NAME:E:\Filenet\ML060190332.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME MKunowski:sls PLouden DATE 1/19/2006 1/19/2006 OFFICIAL RECORD COPY

Notice of Significant Licensee Meeting Distribution:

M. Johnson (MRJ1), Director, Office of Enforcement B. Jones (BWJ), Assistant General Counsel for Materials Litigation and Enforcement, OGC B. Sheron (BWS), Associate Director for Engineering and Safety Systems, NRR B. Boger (BAB2), Director, Associate Director for Operating Reactor Oversight and Licensing, NRR F. Bonnett (FPB), Enforcement Coordinator, NRR P. Habighorst (PJH2), Region III Coordinator, OEDO H. Nieh (HKN), Project Directorate, Division of Licensing Project Management, NRR C. Lyon (CFL), Project Manager, Project Directorate, Division of Licensing Project Management, NRR M. Satorius (MAS), Director, Division of Reactor Projects, RIII S. West (KSW), Deputy Director, Division of Reactor Projects, RIII C. Pederson (CDP1), Director, Division of Reactor Safety, RIII A. Boland (ATB), Deputy Director, Division of Reactor Safety, RIII DRP Branch Chief SRI, Point Beach DRS Branch Chiefs (JFL, DEH, RDL, KXR, AMS1, SKO, HXP1)

K. OBrien (KGO), Enforcement/Investigations Officer, RIII R. Lickus (RML2), State Liaison Officer, RIII PMNS RIII Public Affairs (VTM, RJS2)

J. Kweiser (JRK1), ORA P. Buckley (PLB1), ORA S. Sarna (SLS), DRP