1', Rick Ennis - Re: VY EPU Review - Path Going Forward Page I I Rick Ennis - Re: VY EPU Review - Path Going Forward Page 1 From:

Rick Ennis To:

Gene Irnbro, Date:

9/16/05 2:39PM

Subject:

Re: VAY EPU Review - Path Going Forward

Gene, Kemal and I talked this afternoon about the plan with respect to the SE. He said that EMEB would try to get the SE, with open Items, to me by 9130. We will try to resolve the open items by our typical means (conference calls, RAIs, meetings, audits) as deemed necessary. After the licensee submits Information to resolve the open items, we will revise the draft SE. If you can get the SE changes to me by about 1 0/1 9, I can incorporate them Into the SE before the draft goes to ACRS (draft due to ACRS 10/21). If it is after that point, we will have to coordinate with ACRS to see if they are willing to take the SE with open items. It's possible they would be willing to do that if we get all the Issues resolved prior to the second subcommittee meeeting (the 1st Is scheduled for 11/15-11/16 and the second for 11130-12/1). I left a message for Ralph Caruso to discuss this Issue. Note, the above dates are assuming all the other issues are resolved In the next few weeks.

Call me If you would like to discuss. Thanks, Rick 415-1420

>>> Gene Imbro 09/16/05 1:59 PM>>>>

Rick:

We were working to a Sept 30 date based on a satisfactoy respos to ourRA

~7te package we received on 9/14 (atr the originall prom ae I' 1um nous, we wi~e some time to have our staff and contractors complete this review. We have already informed them that we need this on an expedited basis. Whars the target date by which you need our revised draft SE with Open Items?

Gene

>>> Rick Ennis 09/16/05 1:03 PM >>>>>

This morning a discussion was held between DLPM, DE, and DSSA staff concerning the current status of the Vermont Yankee EPU review. The following Is a brief summary of the path going forward to resolve the primary issues affecting the EPU review schedule:

1) GE Methods Issue - Entergy plans to provide two additional supplements (forecast for September 16 and 23, 2005) to address the remaining open RAI questions. Another meeting on the GE methods Issue is tentatively scheduled for September 21, 2005, to ensure the information supporting the final supplement
2) Steam Dryer Analysis - The staff, and several contractors, are currently reviewing Supplement 33 dated September 14, 2005, which contains a large amount of information that the licensee submitted in response to issues raised during the recent audits. The staff mill complete its draft SE input based on the information we currently have, and will leave open items In the SE for areas that may require further information from the licensee. The draft SE will be revised after the open items are resolved.
3) Transient Testing - The licensee's current response in Supplement 32 dated September 10, 2005. to

Rick Ennis - Re: VY EPU Review - Path Going !orward Pane 2 

Ric Enns _-ReVYEUevw-Pathorg rwd Paged2 an RAI related to the need for post-EPU testing of modifications made to the condensate and feedwater system, does not adequately justify excluding testing a loss of a reactor feedwater pump or a condensate pump. This Information was conveyed to the licensee In a conference call on Se B. 2005.

Another conferencen call is scheduled for Sentember 20. 200 on October 7, 2005, to further discuss RG 1 Please let me know if you have any comments or questions.

thanks, Rick 415-1420 CC:

Brian Sheron; Catherine Haney, Cheng-lh Wu; Christopher Boyd; Christopher Grimes; Cornelius Holden; Darrell Roberts; Jim Dyer, Kamal Manoly; Michael Mayfield; Rebecca Karas; Richard Borchardt Tad Marsh; Thomas Scarbrough

I c:\\tempIGWOI000.TMP Page 1 0 I C AtempGW}OOOO1.TMP Page 1 

MailEnvelopeProperties (432B1168.558:11:372)

Subject:

Creation Date:

From:

Created By:

Recipients Re: VY EPU Review - Path Going Forward 9/16/05 2:39PM Rick Ennis RXE~nrc.gov Action nrc.gov OWGWPO0l.HQGWDOOl RWB1 CC (Richard Borchardt) nrc.gov OWGWPOO2.HQGWDOOI EXI (Gene Imbro) nrc.gov owf2_"o.OWFNDO CIWI CC (Cheng-Ih Wu)

KAM CC (Kamal Manoly)

TGS CC (Thomas Scarbrough) nrc.gov owf4_po.OWFNDO BWS CC (Brian Sheron)

CFH CC (Cornelius Holden)

CIG CC (Christopher Grimes)

DJR CC (Darrell Roberts)

JED2 CC (Jim Dyer)

LBM CC (Tad Marsh)

RLK CC (Rebecca Karas) nrc.gov owfjo.OWFNDO CXH CC (Catherine Haney) nrc.gov twfS_po.TWFN_DO CXB5 CC (Christopher Boyd)

MEM2 CC (Michael Mayfield)

Delivered Delivered Delivered Delivered Delivered Delivered Opened Date & Time 09/16/05 2:39 PM 09/16/05 2:39 PM 09/16/05 2:39 PM 09/16/05 2:39 PM 09/16105 2:39 PM 09/16/05 2:39 PM 09/16/05 2:39 PM Post Office OWGWPOOI.HQGWDOOI OWGWP002.HQGWDOOl Delivered 09/16/05 2:39 PM 09/16/05 2:39 PM Route nrc.gov nrc.gov

I c:\\temrAGWM00001.TMP Pagie 21 I c:tem rAG WIGOGOl.TMP Pane 21 K

77L[

L2..

owf2jo.OWFNDO owf4jSo.OWFNDO owf5jpo.OWFNDO twfSjpo.TWFNDO 09/16/05 2:39 PM 09/16/05 2:39 PM 09/16/05 2:39 PM 09116105 2:39 PM Date & Time 09/16/05 02:39PM nrc.gov nrc.gov nrc.gov nrc.gov Files MESSAGE Options Auto Delete:

Expiration Date:

Notify Recipients:

Priority:

Reply Requested:

Return Notification:

Concealed

Subject:

Security:

To Be Delivered:

Status Tracking:

Size 6056 No None Yes Standard No None No Standard Immediate Delivered & Opened