ML060170315

From kanterella
Jump to navigation Jump to search
Submittal of Physical Security Plan (Revision 2)
ML060170315
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/12/2006
From: Bezilla M
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3209
Download: ML060170315 (1)


Text

FENOC FirstEnergy Nuclear Operating Company I

5501 North State Route 2 Oak Harbor, Ohio 43449 Mark B. Bezilla Vice President -Nuclear SAFEGUARDS INFORMATION WHEN SEPARATED FROM ATTACHMENT 2, HANDLE THIS DOCUMENT AS DECONTROLLED 419-321-7676 Fax: 419-321-7582 Docket Number 50-346 License Number NPF-3 Serial Number 3209 10CFR50.54(p)

January 12, 2006 United States Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555-0001

Subject:

Physical Security Plan (Revision 2)

Ladies and Gentlemen:

In accordance with provisions of 10CFR50.54(p), the Davis-Besse Nuclear Power Station (DBNPS) hereby submits the Physical Security Plan, Revision 2 (Attachment 2). A report of the changes made is attached with the revised plan. contains Safeguards Information and pursuant to 10CFR73.21 is to be withheld from public disclosure.

Should you have any questions or require additional information, please contact Mr. Clark A. Price, Manager, Regulatory Compliance, at (419) 321-8585.

Very truly yours, AB/s Attachments cc:

Regional Administrator, NRC Region III DB-1 NRC/NRR Project Manager (w/o Attachment 2)

DB-1 NRC Senior Resident Inspector (w/o Attachment 2)

Utility Radiological Safety Board (w/o Attachment 2)

SAFEGUARDS INFORMATION WHEN SEPARATED FROM ATTACHMENT 2, HANDLE THIS DOCUMENT AS DECONTROLLED

-7'(53