Text

INDEX ADMINISTRATIVE CONTROLS SECTION PAGE 6.1 RESPONSIBILITY ....................................... 6-1 6.2 ORGANIZATION ......................................... 6-1 6.2.1 ONSITE AND OFFSITE ORGANIZATIONS ................ 6-1 6.2.2 UNIT STAFF ...................................... 6-1 Figure 6.2.1-1 (Deleted)............................ 6-3 Figure 6.2.2-1 (Deleted)............................ 6-4 Table 6.2.2-1 Minimum Shift Crew Composition Single Unit Facility .................. 6-5 6.2.3 SHIFT TECHNICAL ADVISOR ......................... 6-6 6.3 UNIT STAFF QUALIFICATIONS ............... 6-6 6.4 TRAINING ........................ 6-6 6.5 REVIEW AND AUDIT (THIS SECTION DELETED) . ....... 6-6 6.6 REPORTABLE EVENT ACTION ................ 6-14 6.7 SAFETY LIMIT VIOLATION ................ 6-14 6.8 PROCEDURES AND PROGRAMS ................ 6-15 6.9 REPORTING REQUIREMENTS ................ 6-17 6.9.1 ROUTINE REPORTS .................................... 6-17 STARTUP REPORT ..................................... 6-17 ANNUAL REPORTS ..................................... 6-17 ANNUAL RADIOLOGICAL ENVIRONMENTAL OPERATING REPORT. 6-18 ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT ......... 6-19 CORE OPERATING LIMITS REPORT ....................... 6-20 6.9.2 SPECIAL REPORTS .................................... 6-21 HOPE CREEK xxciv Amendment No. 161

ADMINISTRATIVE CONTROLS 6.9 REPORTING REQUIREMENTS ROUTINE REPORTS 6.9.1 In addition to the applicable reporting requirements of Title 10, Code of Federal Regulations, the following reports shall be submitted to the USNRC Administrator, Region 1, unless otherwise noted.

STARTUP REPORT 6.9.1.1 A summary report of plant startup and power escalation testing shall be submitted following (1) receipt of an Operating License, (2) amendment to the license involving a planned increase in power level, (3) installation of fuel that has a different design or has been manufactured by a different fuel supplier, and (4) modifications that may have significantly altered the nuclear, thermal, or hydraulic performance of the unit.

6.9.1.2 The startup report shall address each of the tests identified in the Final Safety Analysis Report and shall include a description of the measured values of the operating conditions or characteristics obtained during the test program and a comparison of these values with design predictions and specifications. Any corrective actions that were required to obtain satisfactory operation shall also be described. Any additional specific details required in license conditions based on other commitments shall be included in this report.

6.9.1.3 Startup reports shall be submitted within (1) 90 days following completion of the startup test program, (2) 90 days following resumption or commencement of commercial power operation, or (3) 9 months following initial criticality, whichever is earliest. If the startup report does not cover all three events (i.e., initial criticality, completion of startup test program, and resumption or commencement of commercial operation) supplementary reports shall be submitted at least every 3 months until all three events have been completed.

ANNUAL REPORTS*

6.9.1.4 Annual reports covering the activities of the unit as described below for the previous calendar year shall be submitted prior to March 1 of each year.

6.9.1.5 Reports required on an annual basis shall include:

a. Deleted
  • A single submittal may be made for a multiple unit station. The submittal should combine those sections that are common to all units at the station.

HOPE CREEK 6-17 Amendment No. 161

ADMINISTRATIVE CONTROLS

b. Documentation of all challenges to main steamline safety/relief valves.

ANNUAL RADIOLOGICAL ENVIRONMENTAL OPERATING REPORT 6.9.1.6 The Annual Radiological Environmental Operating report covering the operation of the unit during the previous calendar year shall be submitted before May 1 of each year. The report shall include summaries, interpretations, and analysis of trends of the results of the Radiological Environmental Monitoring Program for the reporting period. The material provided shall be consistent with the objectives outlined in (1) the ODCM and (2) Sections IV.B.2, IV.B.3, and IV.C of Appendix I to 10 CFR Part 50.

HOPE CREEK 6-18 Amendment No. 161

ADMINISTRATIVE CONTROLS 6.9.1.8 Deleted l CORE OPERATING LIMITS REPORT 6.9.1.9 Core operating limits shall be established and documented in the PSEG Nuclear LLC generated CORE OPERATING LIMITS REPORT before each reload cycle or any remaining part of a reload cycle for the following Technical Specifications:

3/4.2.1 AVERAGE PLANAR LINEAR HEAT GENERATION RATE 3/4.2.3 MINIMUM CRITICAL POWER RATIO 3/4.2.4 LINEAR HEAT GENERATION RATE 3/4.3.11 OSCILLATION POWER RANGE MONITOR (OPRM)

The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by NRC as applicable in the following documents:

1. NEDE-24011-P-A, "General Electric Standard Application for Reactor Fuel (GESTAR-II)m
2. CENPD-397-P-A, "Improved Flow Measurement Accuracy Using Crossflow Ultrasonic Flow Measurement Technology"
3. NEDO-32465-A, Reactor Stability Detect and Suppress Solutions Licensing Basis Methodology for Reload Applications, August 1996 The CORE OPERATING LIMITS REPORT will contain the complete identification for each of the TS referenced topical reports used to prepare the CORE OPERATING LIMITS REPORT (i.e., report number title, revision, date, and any supplements).

The core operating limits shall be determined so that all applicable limits (e.g., fuel thermal-mechanical limits, core thermal-hydraulic limits, ECCS limits, nuclear limits such as shutdown margin, and transient and accident analysis limits) of the safety analysis are met.

The CORE OPERATING LIMITS REPORT, including any mid-cycle revisions or supplements thereto, shall be provided upon issuance, for each reload cycle, to the NRC Document Control Desk with copies to the Regional Administrator and Resident Inspector.

HOPE CREEK 6-20 Amendment No. 161