Dominion Nuclear Connecticut, Inc. .n *mi nhio 5000 Dominion Boulevard, Glen Allen, Virginir23060 AWF umEu Web Address: www dom.com*b SAFEGUARDS INFORMATION January 4, 2006 10 CFR 50.54(f)10 CFR 50.47 U.S. Nuclear Regulatory Commission Serial No.: 05-452A Attention:

Document Control Desk NL&OS/MAE:

R10 11555 Rockville Pike Docket Nos.: 50-336/423 Rockville, Maryland 20852 License Nos.: DPR-65 NPF-49 DOMINION NUCLEAR CONNECTICUT, INC.MILLSTONE POWER STATION UNITS 2 AND 3 REVISED REPLY TO NRC BULLETIN 2005-02 EMERGENCY PREPAREDNESS AND RESPONSE ACTIONS FOR SECURITY-BASED EVENTS AND REVISION OF REPLY TO 1CM B.5.d TO EA 02-026 On July 18, 2005 the NRC issued NRC Bulletin 2005-02, "Emergency Preparedness And Response Actions For Security-Based Events." Dominion Nuclear Connecticut, Inc., (DNC) replied to the bulletin in an August 16, 2005 letter (Serial No.05-452). The 30-day response for Millstone Power Station was provided in Attachment 2 to that letter and it discussed the approach for addressing the five (5) program areas discussed in the bulletin.DNC is supplementing one of the program areas (Section D) of the Summary of Provisions in Attachment 2 to the August 16, 2005 letter, Emergency Response Organization Augmentation

-Summary Discussion.

The supplement is provided as Attachment 1 to this letter. Attachment 1 provides both an interim and long term response configuration.

The interim response configuration necessitates a revision to DNC's reply to Interim Compensatory Measure (ICM) B.5.d to the Order for Interim Safeguards and Security Compensatory Measures (EA 02-026), dated February 25, 2002. This revised reply to Order EA 02-026 is provided as Attachment 2.Attachment 2 to this letter contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended.SAFEGUARDS INFORMATION ATTACHMENT 2 CONTAINS SAFEGUARDS INFORMATION.

UPON SEPARATION THIS PAGE IS DECONTROLLED.

Serial No. 05-452A Docket Nos. 50-336/423 Page 2 of 4 SAFEGUARDS INFORMATION If you have any questions or require additional information, please contact Ms. Margaret Earle at (804) 273-2768.Very truly yours, Eugene S. Grecheck Vice President

-Nuclear Support Services Attachment 1 -Supplemental Reply to NRC Bulletin 2005-02, Section D Attachment 2 -Revised Reply to ICM B.5.d of Order EA 02-026 (Safeguards Information)

Commitments made by this letter: The response configuration will be modified to add a remote mustering area by January 20, 2006.SAFEGUARDS INFORMATION ATTACHMENT 2 CONTAINS SAFEGUARDS INFORMATION.

UPON SEPARATION THIS PAGE IS DECONTROLLED.

SeNal No. 05-452A Docket Nos. 50-336/423 Page 3 of 4 SAFEGUARDS INFORMATION COMMONWEALTH OF VIRGINIA COUNTY OF HENRICO)The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by Eugene S. Grecheck who is Vice President-Nuclear Support Services of Dominion Nuclear Connecticut, Inc. He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that Company, and that the statements in the document are true to the best of his knowledge and belief.Acknowledged before me this .4 L day 0 2006.My Commission Expires: ifU4 at. woaQ8 a Notary Public (SEAL)SAFEGUARDS INFORMATION ATTACHMENT 2 CONTAINS SAFEGUARDS INFORMATION.

UPON SEPARATION THIS PAGE IS DECONTROLLED.

Seral No. 05-452A Docket Nos. 50-336/423 Page 4 of 4 SAFEGUARDS INFORMATION cc: Secretary, Office of the Secretary of the Commission (w/o Attachment 2)U. S. Nuclear Regulatory Commission ATTN: Rulemakings and Adjudications Staff Washington, D. C. 20555 Director, Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Assistant General Counsel for Materials Litigation and Enforcement (w/o Attachment 2)U. S. Nuclear Regulatory Commission Washington, D. C. 20555 U. S. Nuclear Regulatory Commission Region I Regional Administrator 475 Allendale Road King of Prussia, PA 19406-1415 Mr. G. A. Casto (w/o Attachment 2)U. S. Nuclear Regulatory Commission, Mail Stop 6 H 2 One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mr. V. Nerses (w/o Attachment 2)NRC Senior Project Manager Millstone Units 2 and 3 U. S. Nuclear Regulatory Commission, Mail Stop 8 C2 One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mr. S. M. Schneider (w/o Attachment 2)NRC Senior Resident Inspector Millstone Power Station SAFEGUARDS INFORMATION ATTACHMENT 2 CONTAINS SAFEGUARDS INFORMATION.

UPON SEPARATION THIS PAGE IS DECONTROLLED.