ML060050223

From kanterella
Jump to navigation Jump to search
Requalification Program Inspection - North Anna Power Station
ML060050223
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 12/21/2005
From: Moorman J
Division of Reactor Safety II
To: Christian D
Virginia Electric & Power Co (VEPCO)
References
Download: ML060050223 (7)


Text

December 21, 2005 Virginia Electric and Power Company ATTN: Mr. David A. Christian Senior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - NORTH ANNA POWER STATION

Dear Mr. Christian:

In a telephone conversation on December 19, 2005, Mr. Gerard Laska, Senior Operations Examiner, and Mr. Lee Baron, Senior Instructor Nuclear Operations, made arrangements for the NRC to inspect the licensed operator requalification program at the North Anna Power Station. The inspection is planned for the week of January 23, 2006, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. It is our understanding that your simulator is committed to ANSI Standard 3.5, 1998.

In accordance with 10 CFR 55.59, the NRC has requested that you submit (two weeks prior to the inspection/make ready upon arrival), the material as specified in enclosure one, in order to support the NRC's inspection program needs. Mr. Lee Baron has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018), which expires on June 30, 2006.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at SLF@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB approval number.

VEPCO 2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Gerry Laska at (404) 562-4626 or me at (404) 562-4647.

Sincerely,

/RA By R. Aiello For/

James H. Moorman, III, Chief Operation Branch Division of Reactor Safety Docket Nos. 50-338, 50-339 License Nos. NPF-4, NPF-7

Enclosure:

Materials Request List cc w/encl:

Chris L. Funderburk, Director Lillian M. Cuoco, Esq.

Nuclear Licensing and Senior Counsel Operations Support Dominion Resources Services, Inc.

Virginia Electric and Power Company Electronic Mail Distribution Electronic Mail Distribution Attorney General Jack M. Davis Supreme Court Building Site Vice President 900 East Main Street North Anna Power Station Richmond, VA 23219 Electronic Mail Distribution H. Ashley Royal Executive Vice President Manager Nuclear Training Old Dominion Electric Cooperative North Anna Power Station Electronic Mail Distribution P. O. Box 402 Mineral, VA 23117 County Administrator Louisa County P. O. Box 160 Louisa, VA 23093

OFFICE RII:DRS RII:DRS RII:DRP SIGNATURE /RA By S. Rose for/ /RA By R. Aiello for/ /RA By L. Garner for/

NAME GLaska:pmd JMoorman KLandis DATE 12/20/05 12/20/05 12/21/05 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO Materials Request List The items listed below are being requested per telephone conversation on December 6, 2005 to support the upcoming IP-71111.11 inspection in January 2006 at North Anna Power Station.

Items in paragraph "A" are to be sent prior to the inspection. They must be received in our office by January 10, 2006. Please have the items listed in paragraph "B" ready for our review upon arrival on January 23, 2006.

A. In-office inspection material:

1. Exam results since last requal inspection, copies of exam that had pass/failure rates significantly outside the average.
2. A copy of the Written Exams to be administered and all biennial re-takes.
3. List of personnel scheduled for requal testing the weeks of 01/23/2006.
4. Copies of simulator scenarios for this exam.
5. Program evaluation for the previous 2 years training cycle.
6. A list of all personnel that reactivated their licenses since the last requal inspection.
7. Simulator:

List of all open simulator discrepancies (DRs).

Copy of the Simulator Management and Configuration Procedures.

List of all closed simulator DRs for last 12 months.

List of Simulator Performance tests.

B. On-site inspection material:

1. Condition Reports and LERs resulting from human performance errors since the last requal inspection.
2. All training feedback forms since the last requal inspection.
3. All remedial training packages since the last requal inspection.
4. Security badge and HP printouts for all (selected) personnel that reactivated their licenses since the last requal inspection.

Enclosure

2

5. Copies of the reference list for all administrative procedures which direct the training process, including development of training and test materials, remedial training, modifications, plant and industry experience.
6. Records for maintenance of active licenses - time on shift 56/60 hrs/qtr since the last requal inspection.
7. All Medical Exam Records with a copy of the individuals licence attached.
8. Simulator JPMs and in-plant JPMs that have been administered for this requal exam.
9. Copy of an Organizational Chart for the training department including the simulator group.
10. Complete list of all Licensed individuals complete with license restrictions.
11. Security procedures for the simulator.

Enclosure