Re NRC Office of Investigations Report No. 3-2005-013 (AMS File No. RIII-2004-A-0132)
ML053570338
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/21/2005
From: Pederson C
Division of Reactor Safety III
To: Bezilla M
FirstEnergy Nuclear Operating Co
References
3-2005-013, RIII-2004-A-0132
Download: ML053570338 (2)


Text

December 21, 2005 Mr. Mark B. Bezilla Vice President-Nuclear, Davis-Besse FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760

SUBJECT:

NRC OFFICE OF INVESTIGATIONS REPORT NO. 3-2005-013

Dear Mr. Bezilla:

This letter refers to an investigation conducted by the U.S. Nuclear Regulatory Commission (NRC), Office of Investigations (OI) to determine if a Davis-Besse security officer was discriminated against for raising safety concerns. This allegation was brought to our attention on November 18, 2004. Based on the evidence developed during the investigation, OI did not substantiate the allegation. The OI report synopsis is enclosed.

If you have any questions or comments regarding this matter, please contact James Heller or Paul Pelke of the NRC Region III staff at telephone number (630) 829-9500.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, if any, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). The NRCs document system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

You should note that final NRC documents, including the final OI report, may be made available to the public under the Freedom of Information Act (FOIA) subject to redaction of information pursuant to the FOIA. Requests under the FOIA should be made in accordance with 10 CFR 9.23, Request for Records. The instructions for making a request for information under the FOIA are accessible at http://www.nrc.gov/reading-rm/foia/foia-request.html.

Sincerely,

/RA/

Cynthia D. Pederson, Director Division of Reactor Safety Docket No. 50-346 License No. NPF-3

Enclosure:

OI Report Synopsis cc w/enclosure: AMS File No. RIII-2004-A-0132 G:\\EICS\\AMS-LTRS\\04AMS\\040132.davis besse\\040132.cls letter to lic.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII N RIII N RIII N

RIII N

RIII N

RIII N

NAME Pelke Riemer Ulie for Paul* OBrien** Berson Pederson DATE 11/23/05 11/27/05 11/25/05 12/01/05 12/02/05 12/07/05 OFFICIAL RECORD COPY

  • For permission to release OI synopsis.
    • It has been 3 weeks since issuance of the OI Report 3-week e-mail.

ENCLOSURE RIII-04-A-0132 Case No. 3-2005-013 SYNOPSIS This investigation was initiated on April 11, 2005, by the U.S. Nuclear Regulatory Commission, Office of Investigations, Region III, to determine if a Security Guard at the Davis-Besse Nuclear Power Plant was discriminated against for raising safety concerns.

Based upon the evidence developed, this investigation did not substantiate the allegation that a Security Guard was discriminated against for raising safety concerns.