ML053570234
| ML053570234 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley, Davis Besse, Perry |
| Issue date: | 12/22/2005 |
| From: | Ronald Bellamy NRC/RGN-I/DRP/PB7 |
| To: | |
| Bellamy R Rgn-I/DRP/Br7/610-337-5200 | |
| References | |
| MN 05-039 | |
| Download: ML053570234 (3) | |
Text
MN No.05-039 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT LICENSEE MEETING December 22, 2005 Licensee:
First Energy Nuclear Operating Company (FENOC)
Facilities:
Beaver Valley, Perry, and Davis-Besse Nuclear Generating Stations Docket Nos.
50-334, 50-412, 50-440, and 50-346 Time and Date:
January 10, 2006 9:00am - 1:00pm Location:
Beaver Valley Nuclear Power Station Training Building, Room 103 Shippingport Road Shippingport, PA 15077 (Located on Shippingport Road across from the Beaver Valley parking lot entrance)
Purpose:
Multi-regional NRC meeting with FENOC management to discuss FENOC fleet-wide performance.
NRC Attendees:
James Caldwell, RIII Regional Administrator Marc Dapas, RI Deputy Regional Administrator Mark Satorius, RIII, Director, Division of Reactor Projects Christine Lipa, RIII Chief, Projects Branch 3 Ronald Bellamy, RI Chief, Projects Branch 7 Licensee Attendees: Gary R. Leidich, FENOC President & Chief Nuclear Officer Joseph J. Hagan, Senior Vice President and Chief Operating Officer Danny L. Pace, Senior Vice President, Engineering James H. Lash, Vice President, Beaver Valley L. William Pearce, Vice President, Perry Robert Schrauder, Director, Performance Improvement, Davis-Besse Gregory H. Halnon, Director, Fleet Regulatory Affairs Public Participation:
This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
2 Meeting
Contact:
Dr. Ronald Bellamy, Chief, Projects Branch 7 610-337-5200 E-mail: rrb1@nrc.gov.
The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov, and contains information regarding visitors and security.
C Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than 2 business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by January 6, 2005, via telephone to the NRC meeting contact.
Approved by: ______/RA/___________________
Dr. Ronald Bellamy, Chief Projects Branch 7 Division of Reactor Projects Distribution:
Gary R. Leidich, FENOC President & Chief Nuclear Officer Joseph J. Hagan, Senior Vice President and Chief Operating Officer Danny L. Pace, Senior Vice President, Engineering James H. Lash, Vice President, Beaver Valley L. William Pearce, Vice President, Perry Robert Schrauder, Director, Performance Improvement, Davis Besse Gregory H. Halnon, Director, Fleet Regulatory Affairs Regional Administrator Secretary, RI Regional Administrator Secretary, RIII DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI RI Receptionist Region I Docket Room
3 Meeting
Contact:
Dr. Ronald Bellamy, Chief, Projects Branch 7 610-337-5200 E-mail: rrb1@nrc.gov.
The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov, and contains information regarding visitors and security.
C Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than 2 business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by January 6, 2005, via telephone to the NRC meeting contact.
Approved by:
________/RA/_________________
Dr. Ronald Bellamy, Chief Projects Branch 7 Division of Reactor Projects Distribution:
Gary R. Leidich, FENOC President & Chief Nuclear Officer Joseph J. Hagan, Senior Vice President and Chief Operating Officer Danny L. Pace, Senior Vice President, Engineering James H. Lash, Vice President, Beaver Valley L. William Pearce, Vice President, Perry Robert Schrauder, Director, Performance Improvement, David Besse Gregory H. Halnon, Director, Fleet Regulatory Affairs Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI RI Receptionist Region I Docket Room Distribution (Via E-Mail):
Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)
Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)
Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)
Deputy Director, Office of Nuclear Reactor Regulation, NRR/ADPR (RIDSNRROD)
Director, Division of Regulatory Improvement Programs, NRR (RIDSNRRDRIP)
Director, Division of Inspection Program Management, NRR (RIDSNRRDIPM)
Director, Division of Licensing Project Management, NRR (RIDSDLPM)
Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI)
Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)
S. Collins, Regional Administrator RI J. Caldwell, Regional Administrator RIII M. Dapas, DRA, RI T. Colburn, Project Manager, NRR B. Holian, RI DRP D. Lew, RI DRP M. Satorius, RIII DRP S. West, RIII DRP R. Blough, RI DRS M. Gamberoni, RI DRS C. Pederson, RIII DRS A. Boland, RIII DRS K. Farrar, RI Regional Counsel B. Berson, RIII Regional Counsel S. Lee, RI EDO Coordinator R. Bellamy, RI DRP R. Fuhrmeister, RI DRP C. Lipa, RIII DRP R. Lerch, RIII DRP E. Duncan, RIII DRP G. Wright, RIII DRP P. Cataldo, SRI - Beaver Valley G. Smith, RI - Beaver Valley R. Powell, SRI - Perry M. Franke, RI - Perry C. Thomas, SRI - Davis-Besse J. Rutkowski, RI - Davis Besse G. Matakas, RI ORA P. Buckley, RIII ORA D. Screnci, RI PAO N. Sheehan, RI PAO R. Bores, RI SLO PMNS ADAM Accession Number: ML053570234 DOCUMENT NAME: E:\\Filenet\\ML053570234.wpd SISP Review Complete: RRB (Reviewers Initials)
After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI:DRP RIII:DRP RI:DRP NAME ARosebrook/AAR Clipa/
- via Phone RBellamy/RRB DATE 12/22/05 12/20/05 12/19/05 OFFICIAL RECORD COPY