November 2005 Monthly Operating Report for St. Lucie, Units 1 and 2
ML053540243
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 12/08/2005
From: Jefferson W
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2005-248
Download: ML053540243 (3)


Text

FPL Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 December 8, 2005 L-2005-248 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:

St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the November 2005 Operating Data Reports, Summary of Operating Experience Reports, and Unit Shutdowns for St. Lucie Units 1 and 2.

Please contact us should there be any questions regarding this information.

Very truly yours, William Jdffersi Vice President St. Lucie Plant WJ/KWF Attachment Of.-

-s'

-i an FPL Group company

t a

L-2005-248 Attachment Page 1 of 2 OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIC 50-335 SIt.Lucie I December 04, 2005 K. R. Boller (772) 467-7465 November 2005

1. Design Electrical Rating
2.

Maximum Dependable Capacity (MWe-Net) 830.00 839.00

3.

Number of Hours the Reactor was Critical

4.

Number of Hours Generator On-line

5.

Reserve Shutdown Hours

6.

Net Electrical Energy Generated (MWHrs)

This Month 0.00 0.00 0.00 0.00 Yr-to-Date 6,928.00 6,928.00 0.00 5,871,168.00 Cumulative 208,056.12 206,157.85 0.00 169,296,410.0 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours) Reason 1 Down 2 Comments 001 10/16/2005 S

720.00 C

4 Scheduled SL1-20 refueling outage.

SUMMARY

St. Lucie remained offline for SL1-20 scheduled maintenance and refueling activities. In accordance with Technical Specification 6.9.1.6 there were no challenges to the power operated relief valves or safety valves during the report period.

I Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain) 2 Method:

I Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)

L-2005-248 Attachment Page 2 of 2 OPERATING DATA REPORT DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE REPORTING PERIO 50-389 St. Lucie 2 December 04, 2005 K. R. Boller (772) 467-7748 November 2005

1. Design Electrical Rating
2. Maximum Dependable Capacity (MWe-Net) 830.00 839.00
3.

Number of Hours the Reactor was Critical

4.

Number of Hours Generator On-line

5.

Reserve Shutdown Hours

6.

Net Electrical Energy Generated (MWHrs)

This Month 720.00 720.00 0.00 603,304.00 Yr-to-Date 6,929.69 6,859.22 0.00 5,657,430.00 Cumulative 171,067.91 169,042.09 0.00 139,485,840.0 UNIT SHUTDOWNS Type Method of N F: Forced Duration Shutting Cause & Corrective Action No.

Date S: Scheduled (Hours)

Reason 1

Down 2 Comments

SUMMARY

St. Lucie Unit 2 operated in Mode I for the entire reporting period. In accordance with Technical Specification 6.9.1.6 there were no challenges to the power operated relief valves or safety valves during the report period.

I 2

Reason:

A Equipment Failure (Explain)

B Maintenance or Test C

Refueling D

Regulatory Restriction E

Operator Training & License Examination F

Administration G

Operational Error (Explain)

H Other (Explain)

Method:

I Manual 2

Manual Trip/Scram 3

Automatic Trip/Scram 4

Continuation 5

Other (Explain)