Unit 2 Results of Inspection Per NRC Bulletin 2004-01 of Alloy 82//182/600 Pressurizer Penetrations and Steam Space Piping Connections
ML053540156
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 12/20/2005
From: Stinson L
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BL-04-001, NL-05-2269
Download: ML053540156 (2)


Text

L M. Stinson (Mike)

Vice President Southern Nuclear Operating Company, Inc.

40 lnverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.5181 Fax 205.992.0341 December 20, 2005 Docket No.:

50-364 SOUTHERN k COMPANY Energy to Serve Your WorldSH NL-05-2269 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant - Unit 2 Results of Inspection per NRC Bulletin 2004-0 1 of Alloy 8211 821600 Pressurizer Penetrations and Steam Space Piping Connections By letters sent July 26, 2004 and October 21, 2004, Southern Nuclear Operating Company (SNC) responded to Nuclear Regulatory Commission (NRC)Bulletin 2004-01, "Inspection of Alloy 8211 821600 Materials used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors."

During the fall 2005 refueling outage at Joseph M. Farley Nuclear Plant (FNP) Unit 2, the pressurizer penetrations and steam space piping connections were inspected as described in the SNC letters responding to Bulletin 2004-01 item (l)(c). This letter is to report the results of that inspection, in accordance with request (2)(a) of the Bulletin.

Five Alloy 8211 821600 locations within the scope of Bulletin 2004-01 are associated with the FNP Unit 2 pressurizer. These are the butter and full penetration butt welds connecting the stainless steel safe ends at one 4" spray nozzle and at four 6" safetylrelief nozzles. Insulation was removed from these five steam space nozzles and a bare metal visual (BMV) inspection was performed (and photographs taken) of each of the dissimilar metal welds and the surrounding base metal. The examined surfaces and pressurizer shell were clean and free of all signs of leakage; hence, no followup examinations or evaluations were required.

(Affirmation and signature provided on following page.)

U. S. Nuclear Regulatory Commission NL-05-2269 Page 2 Mr. L. M. Stinson states he is a Vice President of Southern Nuclear Operating Company, is authorized to execute this oath on behalf of Southern Nuclear Operating Company and to the best of his knowledge and belief, the facts set forth in this letter are true.

This letter contains no NRC commitments. If you have any questions, please advise.

Respectfully submitted, SOUTHERN NUCLEAR OPERATING COMPANY

~~&

L. M. Stinson Sworn to and subscribed before me this 20 day of &&hr

,2005.

Notary Public MY commission expires:

-2 b-0 7 L-cc:

Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. J. R. Johnson, General Manager - Plant Farley RTYPE: CFA04.054; LC# 14369 U. S. Nuclear Regulatow Commission Dr. W. D. Travers, Regional Administrator Mr. R. E. Martin, NRR Project Manager - Farley Mr. C. A. Patterson, Senior Resident Inspector - Farley Alabama Department of Public Health Dr. D. E. Williamson, State Health Officer