NRC Generic Letter 2003-01, Control Room Habitability (TAC Nos. MB97813 and MB9814)
ML053490104
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 09/19/2006
From: Boska J
NRC/NRR/ADRO/DORL/LPLI-1
To: Kansler M
Entergy Nuclear Operations
Boska J, NRR, 301-415-2901
References
TAC MB9813, TAC MB9814
Download: ML053490104 (6)


Text

September 19, 2006 Mr. Michael R. Kansler President Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

SUBJECT:

NRC RECEIPT OF INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 RESPONSE TO NRC GENERIC LETTER 2003-01, "CONTROL ROOM HABITABILITY" (TAC NOS. MB9813 AND MB9814)

Dear Mr. Kansler:

Entergy has provided the following responses to Nuclear Regulatory Commission (NRC)

Generic Letter (GL) 2003-01:

60-day response for Unit 3 - Entergy letter NL-03-129, dated August 6, 2003, Agencywide Documents Access and Management System (ADAMS) Accession No. ML032260036).

180-day response for Unit 2 - Entergy Letter NL-03-181, dated November 25, 2003, ADAMS Accession No. ML033350400.

Revised schedule for Unit 3 - Entergy letter NL-04-118, dated September 20, 2004, ADAMS Accession No. ML042710270.

Supplemental 60-day response for Unit 3 - Entergy Letter NL-05-085, dated June 28, 2005, ADAMS Accession No. ML051890070.

This letter provides a status of Entergy's response and describes any actions that may be necessary to consider your response to GL 2003-01 complete.

The GL requested that Entergy confirm that the control rooms meet their design bases (e.g.,

General Design Criterion (GDC) 1, 3, 4, 5, and 19, draft GDC, or principal design criteria), with special attention to: (1) determination of the most limiting unfiltered and/or filtered inleakage into the control room and comparison to values used in your design bases for meeting control room operator dose limits from accidents (GL 1a); (2) determination that the most limiting unfiltered inleakage is incorporated into you hazardous chemical assessments; and, (3) determination that reactor control capability is maintained in the control room or at the alternate shutdown location in the event of smoke (GL 1b). The GL further requested information on any compensatory measures in use to demonstrate control room habitability, and plans to retire them (GL 2).

Entergy reported the results of ASTM E741 tracer gas tests for Indian Point Nuclear Generating Unit Nos. 2 and 3 (IP2 and IP3) control rooms, which are pressurized for accident mitigation.

You determined that the maximum tested value for inleakage into the Control Room Envelope (CRE) for IP2 was 589 (+/- 69) standard cubic feet per minute (scfm), which does not exceed the value of 700 scfm assumed in the design basis radiological analyses for IP2 control room habitability. You determined that the maximum tested value for inleakage into the CRE for IP3

M. Kansler was 88 (+/- 33) scfm, which does not exceed the value of 400 scfm assumed in the design basis radiological analyses for IP3 control room habitability.

Entergy indicated that the tracer gas test performed for hazardous chemicals resulted in a maximum inleakage of 1251 (+/- 43) scfm for the IP2 CRE and 301(+/- 17) actual cubic feet per minute for the IP3 CRE, which is less than the value of 1300 scfm assumed in your design basis analyses for hazardous chemical releases. Entergy also indicated that reactor control capability is maintained from either the control rooms or various local control stations in the event of smoke.

The GL further requested that you assess your Technical Specifications (TSs) to determine if they verify the integrity of the CRE, including ongoing verification of the inleakage assumed in the design basis analysis for control room habitability, in light of the demonstrated inadequacy of a differential pressure measurement to alone provide such verification (GL Item 1.c). As permitted by the GL, you provided a schedule for revising the surveillance requirement in the TSs to reference an acceptable surveillance methodology. In your November 25, 2003, response you stated you would submit a license amendment request (LAR) for proposed changes to your TSs based on the Technical Specification Task Force (TSTF) document TSTF-448 including a new surveillance requirement for periodic verification of unfiltered inleakage. You committed to submit proposed changes to the TSs within 9 months of NRC approval of TSTF-448.

The information you provided indicated there are no compensatory measures currently in place to demonstrate control room habitability and also supported the conclusion that you are committed to meet the GDC regarding control room habitability as documented in your Updated Final Safety Analysis Reports.

Your commitment to submit LARs based on TSTF-448 following our formal review and approval of TSTF-448 is acceptable for purposes of closing out your response to GL 2003-01. The NRC staff will monitor submission of the LARs and interact with you as necessary during the amendment process.

Please contact me at (301) 415-2901 if you have any questions on this issue.

Sincerely,

/RA/

John P. Boska, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-247 and 50-286 cc: See next page

ML053490104 OFFICE LPLI-1/PM LPLI-1/LA SCVB/BC PGCB/BC LPLI-1/BC NAME JBoska SLittle RDennig CJackson RLaufer DATE 9/08/06 9/1106 9/11/06 9/18/06 9/19/06

DATED: September 19, 2006 PUBLIC LPL1-1 R/F RidsNrrDorlLpla RidsOGCMailCenter RidsNrrDssScvb RidsNrrDprPgcb RidsAcrsAcnwMailCenter RidsNrrPMJBoska RidsNrrLASLittle ECobey, RI JRobinson cc: Plant Mailing list

Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:

Mr. Gary J. Taylor Chief Executive Officer Entergy Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213 Mr. John T. Herron Senior Vice President and Chief Operating Officer Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Fred R. Dacimo Site Vice President Entergy Nuclear Operations, Inc.

Indian Point Energy Center 295 Broadway, Suite 1 P.O. Box 249 Buchanan, NY 10511-0249 Mr. Paul Rubin General Manager, Plant Operations Entergy Nuclear Operations, Inc.

Indian Point Energy Center 295 Broadway, Suite 2 P.O. Box 249 Buchanan, NY 10511-0249 Mr. Oscar Limpias Vice President Engineering Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Brian OGrady Vice President, Operations Support Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. John F. McCann Director, Licensing Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Ms. Charlene D. Faison Manager, Licensing Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. Michael J. Columb Director of Oversight Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Mr. James Comiotes Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

Indian Point Energy Center 295 Broadway, Suite 1 P.O. Box 249 Buchanan, NY 10511-0249 Mr. Patric Conroy Manager, Licensing Entergy Nuclear Operations, Inc.

Indian Point Energy Center 295 Broadway, Suite 1 P. O. Box 249 Buchanan, NY 10511-0249 Mr. Travis C. McCullough Assistant General Counsel Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601 Ms. Stacey Lousteau Treasury Department Entergy Services, Inc.

639 Loyola Avenue Mail Stop: L-ENT-15E New Orleans, LA 70113 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406

Indian Point Nuclear Generating Unit Nos. 2 & 3 cc:

Senior Resident Inspectors Office Indian Point 2 U. S. Nuclear Regulatory Commission P.O. Box 59 Buchanan, NY 10511-0038 Senior Resident Inspectors Office Indian Point 3 U. S. Nuclear Regulatory Commission P.O. Box 337 Buchanan, NY 10511-0337 Mr. Peter R. Smith, President New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399 Mr. Paul Eddy Electric Division New York State Department of Public Service 3 Empire State Plaza, 10th Floor Albany, NY 12223 Mr. Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mayor, Village of Buchanan 236 Tate Avenue Buchanan, NY 10511 Mr. Ray Albanese Executive Chair Four County Nuclear Safety Committee Westchester County Fire Training Center 4 Dana Road Valhalla, NY 10592 Mr. William DiProfio PWR SRC Consultant 139 Depot Road East Kingston, NH 03827 Mr. Daniel C. Poole PWR SRC Consultant P.O. Box 579 Inglis, FL 34449 Mr. William T. Russell PWR SRC Consultant 400 Plantation Lane Stevensville, MD 21666-3232 Mr. Jim Riccio Greenpeace 702 H Street, NW Suite 300 Washington, DC 20001 Mr. Phillip Musegaas Riverkeeper, Inc.

828 South Broadway Tarrytown, NY 10591 Mr. Mark Jacobs IPSEC 46 Highland Drive Garrison, NY 10524