Category:Meeting Summary
MONTHYEARML24016A0052024-01-23023 January 2024 Summary of Meeting with Holtec Decommissioning International, LLC, Regarding Power Operations Technical Specifications ML23303A2132023-11-0101 November 2023 Summary of Meeting with Holtec Decommissioning International, LLC Regarding Plan to Submit a License Transfer Request as Part of a Regulatory Path for Potentially Requesting Reauthorization of Power Operations at Palisades Nuclear Plant ML23263A0012023-09-27027 September 2023 Summary of August 29, 2023, Meeting with Holtec Decommissioning International, LLC Regarding Plan to Submit an Exemption Request as Part of a Regulatory Path for Potentially Requesting Reauthorization of Power Operations at Palisades Nuclea ML23171B1222023-06-22022 June 2023 Summary of Meeting with Holtec Decommissioning International, LLC Regarding Regulatory Path for Potentially Requesting Reauthorization of Power Operations at Palisades Nuclear Plant ML23107A1212023-04-20020 April 2023 Summary of Meeting with Holtec Decommissioning International, Llc Regarding Regulatory Path for Potentially Requesting Reauthorization of Power Operations at Palisades Nuclear Plant ML22292A2612022-10-31031 October 2022 PSDAR Meeting Summary ML22132A0892022-05-12012 May 2022 Summary of the April 26, 2022, Public Outreach to Discuss the NRC 2021 End-of-Cycle Plant Performance Assessment of Palisades Nuclear Plant ML21200A2262021-07-19019 July 2021 Summary of the July 1, 2021, Public Outreach to Discuss the NRC 2020 End-of-Cycle Plant Performance Assessment of Palisades Nuclear Plant ML21145A0482021-06-0202 June 2021 Summary of May 12, 2021, Teleconference with Entergy Nuclear Operations, Inc. to Discuss Potential License Amendment Request Related to Permanently Defueled Technical Specifications for Palisades Nuclear Plant ML21012A0382021-01-14014 January 2021 December 8, 2020, Summary of Public Teleconference with Entergy Nuclear Operations Inc. Regarding Pre-submittal of a License Transfer Application to Holtec International for Palisades Nuclear Plant ML20309A2372020-11-0606 November 2020 Summary of Public Teleconference with Entergy Nuclear Operations, Inc. to Discuss Future Request for One-Time Exemption from Certain Requirements of 10 CFR 50, Appendix E, Section Iv.F. at Palisades Nuclear Plant (EPID L-2020-LRM-0091 ML20304A1442020-11-0202 November 2020 Summary of September 21, 2020, Public Teleconference with Entergy Nuclear Operations Inc. Regarding a Proposed Alternative for Repair of Reactor Vessel Head Penetrations for Palisades Nuclear Plant ML20280A6972020-10-13013 October 2020 20200910 NRC Mid Outage Q and a for Phone Call for Palisades 1R27-Entergy Responses ML20280A6962020-10-13013 October 2020 20200912 NRC Mid Outage Q and a for Phone Call for Palisades 1R27 (Revised) ML20280A6952020-10-13013 October 2020 Letter - Palisades Nuclear Plant- Summary of September 11, 2020, Conference Call with Entergy Nuclear Operations Inc. Regarding the Fall 2020 Steam Generator Tube Inspections at Palisades Nuclear Plant EPID L-2020-LRO-0051 ML20231A2202020-08-17017 August 2020 Summary of Public Webinar to Discuss the NRC 2019 End-Of-Cycle Plant Performance Assessment of the Palisades Nuclear Plant ML19296D0632019-11-0101 November 2019 August 2019 Palisades NEIMA 108 Public Meeting Summary ML19136A2552019-05-16016 May 2019 Summary of the Public Outreach/Open House to Discuss the NRC 2018 End-of-Cycle Plant Performance Assessment of the Palisades Nuclear Plant ML18351A2382018-12-18018 December 2018 Summary of Public Teleconference Call with Entergy Nuclear Operations. Inc., Regarding Emergent Alternative Request for Repair of Central Rod Drive Nozzles at Palisades Nuclear Plant ML18340A0072018-12-0606 December 2018 Summary of Call with Entergy Nuclear Operations, Inc. - Verbal Authorization of Request for Alternative for the Repair of Reactor Vessel Closure Head Penetrations ML18268A2802018-09-26026 September 2018 Summary of Public Teleconference Call with Entergy Nuclear Operations, Inc. Regarding Upcoming License Amendment Request to Relocate Surveillance Frequencies to Licensee Control ML18107A4972018-04-27027 April 2018 April 10, 2017, Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding Upcoming License Amendment Request to Add Setpoint Verification Requirement to Technical Specification Surveillance Requirements ML18113A6592018-04-23023 April 2018 Summary of Open House to Discuss the 2017 End-of-Cycle Plant Performance Assessment of Palisades Nuclear Plant ML18099A0712018-04-16016 April 2018 March 20, 2018, Summary of Meeting with the Nuclear Energy Institute and Other Industry Representatives Regarding the Surveillance Frequency Control Program ML18008A2302018-01-10010 January 2018 Summary of Public Teleconference Meeting with Entergy Nuclear Operations, Inc., Regarding Request to Extend Enforcement Discretion for Tornado-Generated Missile Non-Conformances at Palisades Nuclear Plant ML17338B0502017-12-0505 December 2017 Summary of November 28, 2017, Public Meeting with Entergy Nuclear Operations, Inc. Regarding a Potential Request Associated with an Alternative to the Reexamination Frequency for a Relevant Condition ML17335A0262017-12-0505 December 2017 Summary of November 27, 2017 Public Meeting with Entergy Nuclear Operations, Inc. Regarding Request to Extend Enforcement Discretion for Tornado Missle Non-Confomances ML17227A2742017-08-14014 August 2017 Summary of the July 26, 2017, Public Meeting Regarding Palisades Nuclear Plant ML17173A7672017-07-28028 July 2017 Summary of 6/20/2017 Meeting with Entergy to Discuss Plan for Decommissioning Licensing Actions of Palisades, Pilgrim, Indian Point, Units 2 and 3, and Vermont Yankee ML17164A3112017-06-27027 June 2017 Summary of 06/12/2017, Pre-Submittal Meeting with Entergy Nuclear Operations, Inc. to Discuss Palisades Nuclear Plant Post Shutdown Emergency Plan and Administrative Technical Specification License Amendment Request ML17160A1812017-06-14014 June 2017 Summary of Conference Call with Palisades Nuclear Plant Regarding the Spring 2017 Steam Generator Inspections ML17080A1492017-03-23023 March 2017 Summary of March 20, 2017, Public Meeting with Entergy Nuclear Operations, Inc. Regarding the Cyber Security Plan Implementation Schedule ML16344A0862016-12-20020 December 2016 Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding National Fire Protection Association Standard 805 ML16277A6772016-10-11011 October 2016 Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding the Proposed Closure Plant for Generic Safety Issue 191, Assessment of Debris Accumulation on Pressurized Water Reactor (PWR) Sump Performance ML16182A5142016-06-30030 June 2016 Summary of the June 23, 2016, Public Meeting Regarding Palisades Nuclear Plant ML16127A1722016-05-0505 May 2016 6/23/16 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Palisades Nuclear Plant Performance for the 2015 Calendar Year ML16035A4252016-03-0101 March 2016 Summary of January 25, 2016, Pre-Application Teleconference Meeting with Entergy Nuclear Operations to Discuss a Forthcoming License Amendment Request Regarding Steam Generator Cold Leg Alternate Repair Criteria at Palisades Nuclear Plant ( ML15294A2972015-10-27027 October 2015 Steam Generator Tube Inspection Discussion During Palisades 2015 (RF24) Outage (Preliminary Information) ML15294A2922015-10-27027 October 2015 Summary of Conference Call with Palisades Nuclear Plant Regarding the Fall 2015 Steam Generator Inspections ML15272A0652015-09-30030 September 2015 Summary of Telephone Conference on September 28, 2015, Verbal Authorization of Relief Request for Palisades Nuclear Plant ML15261A0392015-09-21021 September 2015 September 17, 2015, Summary of Telephone Conference Verbal Authorization of Relief Request for Palisades Nuclear Plant ML15119A0442015-05-0606 May 2015 Summary of April 14, 2015, Meeting with Entergy Nuclear Operations, Inc. on Plans for Volumetric Examinations of Primary Coolant System Alloy 600 Welds ML15118A0352015-04-27027 April 2015 Meeting Summary with Public to Discuss the 2014 Annual Assessment Results for Palisades Nuclear Plant ML15026A5202015-01-29029 January 2015 Summary of Palisades Nuclear Plant, June 24 - 28, 2013, Audit Associated with License Amendment Request to Transition to National Fire Protection Association 805 Standards (Tac No. MF0382) ML14192B3842014-07-11011 July 2014 Summary of Public Meeting Regarding Palisades Nuclear Plant to Discuss 2013 Annual Assessment ML14093A2432014-04-30030 April 2014 Summary of Conference Call with Palisades Nuclear Plant Regarding the Fall 2014 Steam Generator Inspections ML13347B2862013-12-13013 December 2013 Summary of Public Meeting Webinar Regarding Independent Spent Fuel Storage Installation (ISFSI) Basics ML13296A5402013-10-28028 October 2013 Summary of Pre-Application Teleconference Meeting with Entergy Nuclear Operations, Inc., to Discuss a Forthcoming Palisades Equivalent Margin Analysis Submittal ML13221A5962013-08-0909 August 2013 7/16/2013 - Summary of Public Internet Event Briefing Regarding Palisades Safety Injection Refueling Water Tank (SIRWT) Leak ML13165A2422013-06-13013 June 2013 Summary of Public Meeting Webinar to Discuss Nrc'S Perspectives on Palisades Nuclear Power Plant Effluents 2024-01-23
[Table view] Category:Note to File incl Telcon Record
MONTHYEARML21055A5292021-03-30030 March 2021 Memo to File: Final Environmental Assessment and Finding of No Significant Impact for Initial and Updated Decommissioning Funding Plans for Palisades ISFSI ML1008902092010-04-0606 April 2010 Summary of Telephone Conference Call Held on February 24, 2010, Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc. Regarding Progress on National Fire Protection Association (NFPA) Standard 805 Transition Activities ML0905100382009-02-24024 February 2009 Summary of Telephone Conference Call Held on February 11, 2009, Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc. Regarding Progress on National Fire Protection Association Standard 805 Transition Activities ML0601300062006-01-10010 January 2006 Summary of a Telephone Conference Call Held on November 9, 2005, Between the U.S. Nuclear Regulatory Commission and Nuclear Management Company, LLC, Concerning Responses to Request for Additional Information ML0534703392005-12-12012 December 2005 Summary of a Telephone Conference Call Held on November 15, 2005, Between the NRC and Nuclear Management Company, LLC Concerning Responses to Request for Additional Information ML0530404252005-10-28028 October 2005 Summary of Telephone Conference Call Held on September 7, 2005, Between the U.S. Nuclear Regulatory Commission (NRC) and Nuclear Management Company, LLC, Concerning Draft Request for Additional Information Pertaining to the Palisades Nuclea ML0527304602005-09-28028 September 2005 Summary of a Telephone Conference Call Held on August 24, 2005, Between the NRC and NMC, Concerning Responses to Follow-Up Questions from the Site Aging Management Program and Aging Management Review Audit ML0521406342005-08-0202 August 2005 Summary of a Telephone Conference Held on July 20, 2005, Between the NRC and Nuclear Management Company, LLC Concerning Responses to Open Questions from the Site Aging Management Program Audit 2021-03-30
[Table view] Category:Verbal Comm
MONTHYEARML21055A5292021-03-30030 March 2021 Memo to File: Final Environmental Assessment and Finding of No Significant Impact for Initial and Updated Decommissioning Funding Plans for Palisades ISFSI ML1008902092010-04-0606 April 2010 Summary of Telephone Conference Call Held on February 24, 2010, Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc. Regarding Progress on National Fire Protection Association (NFPA) Standard 805 Transition Activities ML0905100382009-02-24024 February 2009 Summary of Telephone Conference Call Held on February 11, 2009, Between the U.S. Nuclear Regulatory Commission and Entergy Operations, Inc. Regarding Progress on National Fire Protection Association Standard 805 Transition Activities ML0601300062006-01-10010 January 2006 Summary of a Telephone Conference Call Held on November 9, 2005, Between the U.S. Nuclear Regulatory Commission and Nuclear Management Company, LLC, Concerning Responses to Request for Additional Information ML0534703392005-12-12012 December 2005 Summary of a Telephone Conference Call Held on November 15, 2005, Between the NRC and Nuclear Management Company, LLC Concerning Responses to Request for Additional Information ML0530404252005-10-28028 October 2005 Summary of Telephone Conference Call Held on September 7, 2005, Between the U.S. Nuclear Regulatory Commission (NRC) and Nuclear Management Company, LLC, Concerning Draft Request for Additional Information Pertaining to the Palisades Nuclea ML0527304602005-09-28028 September 2005 Summary of a Telephone Conference Call Held on August 24, 2005, Between the NRC and NMC, Concerning Responses to Follow-Up Questions from the Site Aging Management Program and Aging Management Review Audit ML0521406342005-08-0202 August 2005 Summary of a Telephone Conference Held on July 20, 2005, Between the NRC and Nuclear Management Company, LLC Concerning Responses to Open Questions from the Site Aging Management Program Audit 2021-03-30
[Table view] |
Text
December 12, 2005 LICENSEE: Nuclear Management Company, LLC FACILITY: Palisades Nuclear Plant
SUBJECT:
SUMMARY
OF A TELEPHONE CONFERENCE CALL HELD ON NOVEMBER 15, 2005, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND NUCLEAR MANAGEMENT COMPANY, LLC, CONCERNING RESPONSES TO REQUEST FOR ADDITIONAL INFORMATION The U.S. Nuclear Regulatory Commission staff (NRC or the staff) and representatives of Nuclear Management Company, LLC, (NMC or the applicant) held a telephone conference call on November 15, 2005, to discuss and clarify the applicants responses to request for additional information. The conference call was useful in clarifying these responses. provides a listing of the conference call participants. Enclosure 2 contains a listing of the questions discussed with the applicant, including a brief description on the status of the items.
The applicant had an opportunity to comment on this summary.
/RA J. Ayala for/
Michael J. Morgan, Project Manager License Renewal Branch A Division of License Renewal Office of Nuclear Reactor Regulation Docket No.: 50-255
Enclosures:
As stated cc w/encls: See next page
ML053470339 DOCUMENT NAME: E:\Filenet\ML053470339.wpd OFFICE PM:RLRA LA:DLR BC:RLRA NAME MMorgan (J. Ayala for) YEdmonds L Lund DATE 12/12/2005 12/12 /2005 12/12/2005 cc:
Robert A. Fenech, Senior Vice President Pillsbury Winthrop Shaw Pittman, LLP Nuclear, Fossil, and Hydro Operations 2300 N Street, NW Consumers Energy Company Washington, DC 20037 1945 Parnall Rd.
Jackson, MI 49201 Manager, Regulatory Affairs Nuclear Management Company, LLC Arunas T. Udrys, Esquire 27780 Blue Star Memorial Highway Consumers Energy Company Covert, MI 49043 1 Energy Plaza Jackson, MI 49201 Director of Nuclear Assets Consumers Energy Company Regional Administrator, Region III Palisades Nuclear Plant U.S. Nuclear Regulatory Commission 27780 Blue Star Memorial Highway 801 Warrenville Road Covert, MI 49043 Lisle, IL 60532-4351 John Paul Cowan Supervisor Executive Vice President & Chief Nuclear Covert Township Officer P.O. Box 35 Nuclear Management Company, LLC Covert, MI 49043 700 First Street Hudson, WI 54016 Office of the Governor P.O. Box 30013 Jonathan Rogoff, Esquire Lansing, MI 48909 Vice President, Counsel & Secretary Nuclear Management Company, LLC U.S. Nuclear Regulatory Commission 700 First Street Resident Inspectors Office Hudson, WI 54016 Palisades Plant 27782 Blue Star Memorial Highway Douglas E. Cooper Covert, MI 49043 Senior Vice President - Group Operations Palisades Nuclear Plant Michigan Department of Environmental Nuclear Management Company, LLC Quality 27780 Blue Star Memorial Highway Waste and Hazardous Materials Division Covert, MI 49043 Hazardous Waste and Radiological Protection Section Paul A. Harden Nuclear Facilities Unit Site Vice President Constitution Hall, Lower-Level North Palisades Nuclear Plant 525 West Allegan Street Nuclear Management Company, LLC P.O. Box 30241 27780 Blue Star Memorial Highway Lansing, MI 48909-7741 Covert, MI 49043 David Lewis
Palisades Nuclear Plant cc:
Robert A. Vincent Licensing Lead - License Renewal Project Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Darrel G. Turner License Renewal Project Manager Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Mr. James Ross Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Mr. Douglas F. Johnson Director, Plant Life Cycle Issues Nuclear Management Company, LLC 700 First Street Hudson, WI 54016 Secretary Federal Energy Regulatory Commission 888 First Street, NE, Room 1A Washington, DC 20426 Chairperson Michigan Public Service Commission PO Box 30221 Lansing, MI 48909-7721
DISTRIBUTION: Summary of telephone conference held on November 15, 2005 with NMC, LLC, Dated: December 12, 2005 ADAMS Accession No.: ML053470339 HARD COPY DLR RF M. Morgan (PM)
E-MAIL:
RidsNrrDrlr RidsNrrDe G. Bagchi RidsNrrDci K. Manoly J. Calvo R. Jenkins J. Fair RidsNrrDss D. Thatcher R. Pettis G. Galletti C. Li K. Winsberg (RidsOgcMailCenter)
R. Weisman M. Mayfield A. Murphy S. Smith (srs3)
S. Duraiswamy Y. L. (Renee) Li DLR Staff M. Padovan P. Lougheed, RIII J. Ellegood, RIII J. Giessner, RIII A. Stone, RIII L. Raghavan OPA
LIST OF PARTICIPANTS FOR TELEPHONE CONFERENCE CALL CONCERNING NMC RESPONSES TO REQUEST FOR ADDITIONAL INFORMATION NOVEMBER 15, 2005 Participants Affiliations Michael Morgan U.S. Nuclear Regulatory Commission (NRC)
Hansraj Asher NRC Zahira Cruz Perez NRC Kaihwa Hsu NRC Robert Vincent Nuclear Management Company, LLC (NMC)
Mark Cimock NMC Jerry Whittle NMC John Kneeland NMC Bill Russell NMC Bill Roberts NMC Enclosure 1
RESPONSES TO FOLLOW-UP QUESTIONS CONCERNING NMC RESPONSES TO REQUEST FOR ADDITIONAL INFORMATION (RAI)
NOVEMBER 15, 2005 The U.S. Nuclear Regulatory Commission staff (NRC or the staff) and representatives of Nuclear Management Company, LLC, (NMC or the applicant) held a telephone conference call on November 15, 2005, to discuss and clarify the applicants responses to request for additional information (RAI).
NMC Response to 08/25/2005 Commitment Regarding ASME Section XI In a letter dated October 31, 2005, NMC provided additional information regarding its Aging Management Program (AMP) B2.1.2, ASME Section XI IWB, IWC, IWD, IWF Inservice Inspection Program. NMC identified proposed reliefs as exception to GALL AMP XI.M1. The staff reviewed and determined that the bases for relief for examinations of the ASME Section XI (IWB/C/D) was inadequate. The staff requested possible alternatives to the use of reliefs as exceptions.
Discussion: The applicant indicated that the question is clear. The applicant will re-address this issue.
Open Item (OI) 3.5.2-4-1(a)
The staff reviewed the applicants response to RAI 3.5.2-4-1(a), and discovered that the shield wall concrete and the concrete around the reactor pressure vessel (RPV) supports at Palisades Nuclear Plant are not accessible for inspections. The staff request the licensee to explain or identify under what program the carbon steel plate (liner) on primary shield wall is inspected.
Discussion: The applicant indicated that the question is clear. The applicant will re-address this issue.
OI 3.5.2-4-1(b)
The staff noted in the applicants response to RAI 3.5.2-4-1(b), as result of Structural Monitoring Inspections performed inside the containment in 1996 and 1999, the top five courses of masonry wall blocks were found spalled at the northern most tip of the block wall. The condition was determined not to be damaging to the masonry wall integrity, and the condition was deemed acceptable. The staff asked the applicant if keeping this degraded condition will affect any Class 1 components during the postulated accident or seismic event.
Discussion: The applicant indicated that the question is clear. The applicant will re-address this issue.
Enclosure 2