Category:Letter
MONTHYEARML24032A1112024-02-0101 February 2024 Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval ML24032A4662024-01-16016 January 2024 Response to Comments on Draft Vpdes Permit No. VA0052451 ML24017A0802024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301 ML24003A8372024-01-0909 January 2024 Letter to Elizabeth Toombs, Thpo, Cherokee Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8412024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8502024-01-0909 January 2024 Letter to Wenonah Haire, Thpo, Catawba Indian Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A7272024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8382024-01-0909 January 2024 Letter to G. Anne Richardson, Chief, Rappahannock Tribe, Inc., Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8482024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8392024-01-0909 January 2024 Letter to Gerald Stewart, Chief, Chickahominy Indian Tribe, Eastern Division Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8472024-01-0909 January 2024 Letter to Tom Jonathan, Chief, Tuscarora Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8492024-01-0909 January 2024 Letter to W. Frank Adams, Chief, Upper Mattaponi Tribe Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8462024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8352024-01-0909 January 2024 Letter to Acee Watt, Thpo, United Keetoowah Band of Cherokee Indians in Oklahoma Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8422024-01-0909 January 2024 Letter to Paul Barton, Thpo, Eastern Shawnee Tribe of Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8432024-01-0909 January 2024 Letter to Robert Gray, Chief, Pamunkey Indian Tribe, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8362024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8442024-01-0909 January 2024 Letter to Russell Townsend, Thpo, Eastern Band of Cherokee Indians ML24003A8402024-01-0909 January 2024 Letter to Katelyn Lucas, Thpo, Delaware Nation, Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8452024-01-0909 January 2024 Letter to Stephen Adkins, Chief, Chickahominy Indian Tribe, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML23332A1852024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A0872024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23360A6352024-01-0404 January 2024 Letter to Dominion Availability for North Anna Units 1 and 2 Draft Site Specific Environmental Impact Statement ML23332A1472023-12-21021 December 2023 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23346A0972023-12-11011 December 2023 License Amendment Request to Revise the Emergency Plan Relocation of the Technical Support Center - Response to NRC Request for Additional Information ML23346A1022023-12-11011 December 2023 2024 North Anna Power Station Brq Inspection Notification Letter ML24012A0942023-12-0707 December 2023 GL Report from Dominion Virginia Power Regarding Transfer of Devices ML24012A0892023-12-0707 December 2023 GL Registration from Dominion Virginia Power ML23334A2432023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23362A0602023-11-29029 November 2023 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000339/20234022023-11-27027 November 2023 Security Baseline Inspection Report 05000338 and 05000339/2023402 IR 05000338/20230032023-11-13013 November 2023 Integrated Inspection Report 05000338/2023003 and 05000339/2023003 ML23311A2042023-10-0909 October 2023 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d IR 05000338/20234032023-10-0505 October 2023 Reissue - North Anna Power Station - Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 (Cover Letter) ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23275A0992023-09-28028 September 2023 Subsequent License Renewal Application Third 10 CFR 54.21(b) Annual Amendment IR 05000338/20230112023-09-26026 September 2023 Quadrennial Focused Engineering Inspection Commercial Grade Dedication Report 05000338/2023011 and 05000339/2023011 ML23242A3482023-09-11011 September 2023 Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 - Cover ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23249A2592023-09-0606 September 2023 Core Operating Limits Report Cycle 30, Pattern Ukr, Revision 0 ML23214A2022023-09-0505 September 2023 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information 2024-02-01
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23318A1172023-11-13013 November 2023 NRR E-mail Capture - Formal Issuance of RAIs for North Anna Technical Support Center (TSC) License Amendment Request (LAR) (L-2023-LLA-0006) ML23257A2092023-09-14014 September 2023 NRR E-mail Capture - Formal Issuance of 2nd Round RAIs for Surry Units 1&2 and North Anna Units 1&2 Emergency Plans LAR ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23219A1602023-08-0707 August 2023 003 Radiation Safety Baseline Inspection Information Request ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23081A5282023-04-26026 April 2023 Request for Additional Information - North Anna Subsequent License Renewal Application Environmental Review ML23075A0232023-03-15015 March 2023 NRR E-mail Capture - RAI - License Amend Req (LAR) to Revise Tech Spec (Ts) 3.6.8 Limiting Condition for Operation to Remove Refueling Water Chemical Addition Tank and Replace the Containment Sump Buffer North Anna, 1 and 2 (L-2022-LLA-0162 ML23060A0932023-03-0101 March 2023 NRR E-mail Capture - Formal Issuance of RAIs for Surry/North Anna Emergency Plans LAR ML23059A2282023-02-28028 February 2023 NRR E-mail Capture - Draft RAIs for Containment Buffer Change to Natb (L-2022-LLA-0162) ML22251A1292022-09-0909 September 2022 Request for Additional Information Related to Response to Generic Letter 2004-04 ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22083A2102022-03-24024 March 2022 NRR E-mail Capture - Draft RAI - Relief Request N2-14-LMT-003 Fourth Ten Year Inservice Inspection Interval ML21327A3652021-11-23023 November 2021 NRR E-mail Capture - Draft RAI for TSTF-577 LAR ML21322A0962021-11-18018 November 2021 Final Request for Additional Information Set 5 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21322A0992021-11-18018 November 2021 Final Request for Additional Information Set 5 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure ML21256A0672021-09-13013 September 2021 Final Request for Confirmation of Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21256A0692021-09-13013 September 2021 Final Request for Confirmation of Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Request for Confirmation of Information ML21238A0942021-08-25025 August 2021 Draft Request for Additional Information Set Z - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21238A0982021-08-25025 August 2021 Draft Request for Additional Information Set Z - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure ML21225A5022021-08-13013 August 2021 Request for Additional Information for North Anna Power Station, Units 1 and 2, Surry Power Station, Units 1 and 2, and Millstone Power Station, Units 2 and 3, Appendix E of Fleet Report Com-Naf-2 (EPID:L02021-LLT-0000) Public Version ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21188A1632021-07-0707 July 2021 Final Request for Additional Information Set 4 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Email ML21188A1652021-07-0707 July 2021 Final Request for Additional Information Set 4 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure ML21174A1952021-06-23023 June 2021 Safety RAIs - Set Y - Draft - Enclosure ML21166A3512021-06-15015 June 2021 Safety RAIs - Set 4 - Draft ML21123A2972021-05-0303 May 2021 Final Request for Additional Information Set 3 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - E-mail ML21123A2982021-05-0303 May 2021 Final Request for Additional Information Set 3 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure ML21091A0032021-04-0101 April 2021 Final Request for Additional Information Set 2 - North Anna SLRA Safety Review (EPID No. L-2020-SLR-0000) - Enclosure 1 - RAIs ML21091A0042021-04-0101 April 2021 SLRA Safety Review - Withdrawn Requests for Information (EPID No. L-2020-SLR-0000) - Enclosure 2 ML21076A4622021-03-17017 March 2021 NRR E-mail Capture - Draft RAI for Versatile Internals and Component Program for Reactors Vipre Code Review (L-2021-LLT-0000) ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 ML21063A5602021-03-0404 March 2021 Final Request for Additional Information Set 1 - North Anna SLRA Safety Review (EPID L-2020-SLR-0000) - Enclosure ML21049A0212021-02-17017 February 2021 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000338/2021012 and 05000339/2021012) and Request for Information (RFI) ML21028A3902021-01-29029 January 2021 Request for Additional Information - North Anna Subsequent License Renewal Application Environmental Review (EPID Number: L-2020-SLE-0000) (Docket: 50-338 and 50-339) ML21028A4352021-01-28028 January 2021 Notification of Target Set Inspection and Request for Information (NRC Inspection Report No. 05000338/2021404 and 05000339/2021404) ML21012A3412021-01-22022 January 2021 Requests for Confirmation of Information for the Environmental Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application (EPID Number: L-2020-SLE-0000) (Docket: 50-338 and 50-339) ML21019A4512021-01-19019 January 2021 Notification of Inspection and Request for Information ML20316A0422020-11-10010 November 2020 NRR E-mail Capture - FW: Draft RAI for North Anna Unit 2 Steam Generator Tube Inspection Report (ML19179A075) ML20223A3412020-08-10010 August 2020 003 Radiation Safety Baseline Inspection Information Request ML20218A4282020-08-0505 August 2020 Notification of Inspection and Request for Information ML20125A0762020-05-0101 May 2020 NRR E-mail Capture - Draft RAI Related to Revised Reactor Vessel Material Surveillance Capsule Withdrawal Schedule Dominion Energy Virginia North Anna Power Station Units 1 and 2 (L-2020-LLL-0038) ML20113A5792020-04-21021 April 2020 NRR E-mail Capture - Draft RAI North Anna Fifth 10-year Interval Relief Request (L-2020-LLR-0023) ML19354B6142019-12-20020 December 2019 NRR E-mail Capture - Draft RAI for North Anna Relief Request P-9 ML19317F1042019-11-0707 November 2019 NRR E-mail Capture - Draft RAIs for SB LOCA LAR (Non Prop) ML19191A2512019-07-10010 July 2019 NRR E-mail Capture - Request for Additional Information Open Phase Condition LAR ML19169A0962019-06-17017 June 2019 NRR E-mail Capture - Request for Additional Information Emergency Action Level Scheme Change for Millstone Power Station - Units 1, 2, and 3, North Anna Power Station - Units 1 and 2, and Surry Power Station - Units 1 and 2 ML19162A0052019-06-10010 June 2019 NRR E-mail Capture - Draft RAIs for Dominion EAL Scheme Change ML19108A1902019-04-18018 April 2019 Emergency Preparedness Program Inspection Request for Information ML19060A2432019-03-0101 March 2019 Related to License Amendment Request to Address Open Phase Conditions ML18337A1312018-11-29029 November 2018 NRR E-mail Capture - North Anna SPRA (Fukushima 50.54f) Audit Follow-Up Clarification Question on Plant Modifications 2023-09-14
[Table view] |
Text
VIRGINIA ELECTRIC A N D POWER COMPANY RICHMOND, VIRGINIA 23261 December 9 , 2005 U.S. Nuclear Regulatory Commission Serial No.05-700 Attention: Document Control Desk NL&OS/ETS RO Washington, D.C. 20555 Docket Nos. 50-338 50-339 License Nos. NPF-4 NPF-7 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
NORTH ANNA POWER STATION UNITS 1 AND 2 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION PROPOSED REACTOR VESSEL MATERIAL SURVEILLANCE CAPSULE WITHDRAWAL SCHEDULE In a letter dated March 15, 2005, Serial No.05-129, Dominion submitted a proposed reactor vessel material surveillance capsule withdrawal schedule for NRC review and approval in accordance with 10 CFR 50, Appendix H, Section lll.B.3. Subsequently, in a letter dated October 3, 2005, the NRC staff requested additional information to complete the review of the proposed capsule withdraw schedule. The attachment to this letter provides the requested information. In a November 17, 2005 telephone conference call with the NRC staff to discuss storage requirements for standby capsules, Mr. S. R. Monarque of the NRC staff indicated that the response could be delayed to further address standby capsule storage requirements. In a subsequent telephone call on December 8, 2005 with Mr. S. R. Monarque and Mr. M. A. Mitchell to discuss standby capsule storage requirements, the NRC concurred with the proposed commitment described below.
If you should have any questions regarding this submittal, please contact Mr. Thomas Shaub at (804) 273-2763.
Sincerely, L. N. Hartz i_/
Vice President - Nuclear Engineering Attachment Commitments made in this letter:
All surveillance capsules placed in storage will be maintained for possible future insertion. If one or more capsules will not be maintained in such a way as to permit future insertion, then the NRC staff will be notified of this change.
cc: U. S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW Suite 23T85 Atlanta, Georgia 30303 Mr. J. T. Reece NRC Senior Resident Inspector North Anna Power Station Mr. J. E. Reasor, Jr. (without attachment)
Old Dominion Electric Cooperative lnnsbrook Corporate Center 4201 Dominion Blvd.
Suite 300 Glen Allen, Virginia 23060 Mr. S. R. Monarque NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 8-HI 2 Rockville, Maryland 20852 Mr. R. E. Martin NRC Lead Project Manager - North Anna and Surry U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, Maryland 20852
Attachment Serial No.05-700 Response to Request for Additional Information Capsule Withdrawal Schedule Virginia Electric and Power Company (Dominion)
North Anna Power Station Units 1 and 2
REQUEST FOR ADDITIONAL INFORMATION SURVEILLANCE CAPSULE WITHDRAWAL SCHEDULE NORTH ANNA, UNITS 1 AND 2 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)
DOCKET NOS. 50-338 AND 50-339 By letter dated March 15, 2005, Virginia Electric and Power Company (VEPCO) submitted a proposed reactor vessel material withdrawal schedule for North Anna Power Station, Units 1 and 2. VEPCO is requested to respond to the following questions below.
NRC Question
- 1. What are the projected peak neutron fluence (E>1.O MeV) values for the North Anna Power Station, Units 1 and 2 reactor vessels at the end of their current operating licenses (which allow for a total of 60 years of power operation)?
Dominion Response The peak reactor vessel inner surface fluence (E> 1.0 MeV) values at the end of the current 60 year operating license (EOL) are:
North Anna Unit 1 5.90 E l 9 n/cm2 North Anna Unit 2 5.91 E l 9 n/cm2 These values were provided to the NRC in a letter dated October 15, 2002 [Reference 11 in support of the license renewal effort.
NRC Question
- 2. Note h in Table A-1 of Appendix A to your letter dated March 15, 2005, for North Anna Power Station, Unit 1 states capsule X may be withdrawn at the [end of life]
(EOL) to provide material properties data at a fluence which exceeds that expected to be achieved at the end of the 20-year license renewal period. Clarify the definition of EOL as it applies to Note h. Provide the calendar day, effective full-power years (EFPY) value, and the estimated surveillance capsule X neutron fluence (E>1.0 MeV) value, which are to be understood to be consistent with withdrawal of the capsule at EOL.
Dominion Response The term End of License (EOL) as used throughout VEPCOs submittal of March 15, 2005 applies to the end of the current 60 year operating license.
Page 1 of 5
For North Anna Power Station, Unit 1, EOL is reached on April 1, 2038 [Reference 21, with a corresponding EFPY value of 50.3 years. For Unit 1 surveillance capsule X, the estimated neutron fluence (E>1.O MeV) value at EOL is 9.44 E l 9 n/cm2.
NRC Question
- 3. Note f in Table A-1 of Appendix A to your letter dated March 15, 2005, for North Anna Power Station, Unit 1, states capsule X may be withdrawn at 44.5 EFPY in lieu of surveillance capsule Z to satisfy American Society for Testing and Materials (ASTM) E-185-82 fourth capsule requirement for the license period.
- a. What will the estimated neutron fluence (E>1.0 MeV) value be for surveillance capsule X withdrawn at 44.5 EFPY?
Dominion Response For Unit 1 surveillance capsule X, the estimated neutron fluence (E>1.O MeV) value at 44.5 EFPY is 8.45 E l 9 n/cm2.
- b. If surveillance capsule X is withdrawn in lieu of surveillance capsule Z at 44.5 EFPY, what will the estimated fluence be for surveillance capsule Z at 50.3 EFPY?
Dominion Response For Unit 1 surveillance capsule Z, the estimated neutron fluence (E>1.O MeV) value at 50.3 EFPY is 7.48 E l 9 n/cm2.
NRC Question
- 4. Note f in Table A-2 of Appendix A to your letter dated March 15, 2005, for North Anna Power Station, Unit 2, was modified to allow surveillance capsule X to be withdrawn at 42.8 EFPY in lieu of surveillance capsule Z to satisfy the ASTM E-185-82 fourth surveillance capsule withdrawal requirement for the licensed period.
- a. What will the estimated neutron fluence (E>1.0 MeV) value be for surveillance capsule X withdrawn at 42.8 EFPY?
Dominion Response For Unit 2 surveillance capsule X, the estimated neutron fluence (E>1.O MeV) value at 42.8 EFPY is 8.39 E l 9 n/cm2.
Page 2 of 5
- b. Does this estimated fluence value meet the requirements of ASTM E-185-82 for the fourth surveillance capsule for the 60-year license period?
Dominion Response Yes, the estimated neutron fluence (E>1.0 MeV) value for Unit 2 surveillance capsule X at 42.8 EFPY of 8.39 E l 9 n/cm2 satisfies the requirements of ASTM E-185-82 for the fourth surveillance capsule for the 60-year license period. The peak EOL inner reactor vessel surface neutron fluence (E>1.O MeV) for Unit 2 is 5.91 E l 9 n/cm2. Per the requirements of ASTM E-185-82, Table 1, the estimated neutron fluence for Unit 2 surveillance capsule X is not less than once, or greater than twice, the peak EOL vessel fluence.
- c. If surveillance capsule X is withdrawn in lieu of surveillance capsule Z at 42.8 EFPY, what will the estimated fluence be for surveillance capsule Z at 52.3 EFPY?
Dominion Response For Unit 2 surveillance capsule Z, the estimated neutron fluence (E>1.O MeV) value at 52.3 EFPY is 8.20 E l 9 n/cm2.
NRC Question
- 5. Note g in Table A-2 of Appendix A to your letter dated March 15, 2005, for North Anna Power Station, Unit 2 states withdrawal of surveillance capsule Z at EOL satisfies ASTM E-185-82 requirement for EOL surveillance capsule and provides material properties data at a fluence which exceeds that expected to be achieved at the end of the 20-year license renewal period. Clarify the definition of EOL as it applies to Note g. Provide the calendar day, EFPY value, and the estimated surveillance capsule Z neutron fluence (E>1.0 MeV) value, which are to be understood to be consistent with withdrawal of the capsule at EOL.
Dominion Response The term End of License (EOL) as used throughout VEPCOs submittal of March 15, 2005 applies to the end of the current 60 year operating license.
For North Anna Power Station, Unit 2, EOL is reached on August 21, 2040 [Reference 21, with a corresponding EFPY value of 52.3 years. For Unit 2 surveillance capsule Z, the estimated neutron fluence (E>1.O MeV) value at EOL is 8.20 E l 9 n/cm2.
Page 3 of 5
NRC Question
- 6. Note h in Table A-2 of Appendix A to your letter dated March 15, 2005, for North Anna Power Station, Unit 2 states surveillance capsule X may be withdrawn at EOL to provide material properties data at a fluence which exceeds that expected to be achieved at the end of the 20-year license renewal period. Clarify the definition of EOL as it applies to Note h. Provide the calendar day, EFPY value, and the estimated surveillance capsule X neutron fluence (E>1.O MeV) value which are to be understood to be consistent with withdrawal of the capsule at EOL.
Dominion Response The term End of License (EOL) as used throughout VEPCOs submittal of March 15, 2005 applies to the end of the current 60 year operating license.
For North Anna Power Station, Unit 2, EOL is reached on August 21 , 2040 [Reference 21, with a corresponding EFPY value of 52.3 years. For Unit 2 surveillance capsule X, the estimated neutron fluence (E>1.O MeV) value at EOL is 10.17 E 19 n/cm2.
NRC Question
- 7. Since there can be up to four standby surveillance capsules for North Anna Power Station, Units 1 and 2, these surveillance capsules have the potential to be removed for storage. However, the NRC staff notes that currently, there is no detailed guidance regarding the treatment of standby surveillance capsules. Therefore, the NRC staff requests the licensee to ensure that any surveillance capsules removed from the North Anna, Units 1 and 2 reactor vessels, without the intent to test them, are maintained in a condition that would permit their future use, if necessary. A note in the surveillance withdrawal schedule in the North Anna Power Station, Units 1 and 2 Updated Final Safety Analysis Report stating the following should be included to ensure that standby surveillance capsules are properly maintained:
All surveillance capsules placed in storage must be maintained for future insertion. Any changes to storage requirements must be approved by the NRC, as required by 10 CFR Part 50, Appendix H.
Dominion Response It is Dominions opinion that 10 CFR Part 50 Appendix H, as well as ASTM E-185-82, are silent on storage requirements for standby (untested) irradiated surveillance capsules not used to demonstrate compliance with ASTM E-185-82 Section 7.6. As a substitute for the sentences above, Dominion proposes the following alternative Page 4 of 5
language for inclusion into an applicable section of the North Anna Power Station, Units 1 and 2 Updated Final Safety Analysis Report:
All surveillance capsules placed in storage will be maintained for possible future insertion. If one or more capsules will not be maintained in such a way as to permit future insertion, then the NRC staff will be notified of this change.
The alternate wording in the above mentioned commitment was discussed with the NRC Staff and agreed upon in a telephone conference call on December 8,2005.
References
- 1. Letter from D. A. Christian to USNRC, Virginia Electric and Power Company (Dominion), Surry and North Anna Power Stations Units 1 and 2, Response to Request for Supplemental Information License Renewal Applications, dated October 15,2002 [ADAMS Accession Number ML02296041I].
- 2. Letter from 0. Tabatabai (USNRC) to D. A. Christian (Dominion), Issuance of Renewed Facility Operating License Nos. NPF-4 and NPF-7 for North Anna Power Station, Unit Nos. 1 and 2, and Renewed Facility Operating License Nos.
DPR-32 and DPR-37 for Surry Power Station, Unit Nos. 1 and 2, dated March 20,2003 [ADAMS Accession Number ML030710581].
Page 5 of 5