LA CROSSE BOILING WATER REACTOR (LACBWR)
DAIRYLAND POWER C OO P E R A T I V E November 30, 2005 In reply, please refer to LAC-13886 DOCKET NO. 50-409 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555
Dear Sir/Madam:
SUBJECT:
Dairyland Power Cooperative (DPC)
La Crosse Boiling Water Reactor (LACBWR)
Possession-Only License No. DPR-45 Letter of Intent. Package Application Submittal Attached is DPC letter dated November 23, 2005, notifying NRC of Dairyland's plan to submit an application for approval of its pressure vessel packaging. A copy of this letter was previously sent via email directly to Jill S. Caverly of the Spent Fuel Project Office, Office of Nuclear Material Safety and Safeguards.
This original Letter of Intent is now being transmitted to allow for normal processing by NRC Document Control Desk.
Sincerely, DAIRYLAND POWER COOPERATIVE R E. Christians, Plant Manager La Crosse Boiling Water Reactor (LACBWR)
REC:dh Attachment cc:
Jill S. Caverly, NRC Kristina Banovac, NRC rn S S ol A Touchstone Energye CooperativeolA S4601 State Highway 35. Genoa, WI 54632-8846
- 608-689-2331
- 608-689-4200 fax. www.dairynet.com
L LA CROSSE BOILING WATER REACTOR (LACBWR)
DAIRYLAND POWER C O O P E R A T I V E November 23, 2005 Jill S. Caverly, P.E.
Project Manager US NRC Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards Mail Stop: 0-13 D-13 Washington, DC 20555-0001
Subject:
Letter of Intent, Package Application Submittal
Dear Ms. Caverly:
Dairyland Power Cooperative (DPC) is planning to submit an application to your department for the approval of its La Crosse Boiling Water Reactor (LACBWR)
Pressure Vessel packaging, as a one-time shipment from Genoa, Wisconsin to Barnwell Disposal Site in South Carolina.
DPC has contracted Duratek, Inc. to prepare the LACBWR packaging application Safety Analysis Report (SAR), and have it delivered to the NRC offices (your attention) no later than December 19, 2005. DPC requests that the NRC completes its review of this SAR and issue Its Safety Evaluation Report by April 17,2006.
If you have any question, please do not hesitate to call me at 608-689-4216 Sincerely, DAIRPYLAND POWER COOPERATIVE Roger E. Christians, Plant Manager La Crosse Boiling Water Reactor (LACBWR)
A Touchstone Energy CooperativeolA S4601 State Highway 35. Genoa, WI 54632-8846. 608-689-2331. 608-689-4200 fax. www.dairynet.com