Letter to the Director of Spent Fuel Project Office from Mark B. Bezilla, FENOC, Subject: Response to Order for Implementation of Additional Security Measures Associated with Access Authorization for the Davis-Besse Nuclear Power Station
ML053320086
Person / Time
Site: Davis Besse  Cleveland Electric icon.png
Issue date: 09/03/2004
From: Bezilla M
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, NRC/NMSS/SFPO
References
FOIA/PA-2005-0047
Download: ML053320086 (3)


Text

FENOC

%5501 North State Route 2 FirstEnergy Nuclear Operating Company Oak Harbor. Ohio 43449 Mark B. Bezilla 419-321-7676 Vice President - Nuclear Fax. 419321-7582 Docket Numbers 50-346, 72-14 License Number NPF-3 Serial Number 3090 September 3,2004 Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards United States Nuclear Regulatory Commission Washington, D.C. 20555-0001 ATTN: Document Control Desk

Subject:

Response to Order for Implementation of Additional Security Measures Associated with Access Authorization for the Davis-Besse Nuclear Power Station Ladies and Gentlemen:

The FirstEnergy Nuclear Operating Company (FENOC) has reviewed and consents to the Order for Implementation of Additional Security Measures Associated with Access Authorization for the Davis-Besse Nuclear Power Station (DBNPS), issued on August 18, 2004 (EA-03-097). This Order, which modifies the license for the DBNPS Independent Spent Fuel Storage Installation (ISFSI), requires a response regarding the implementation of the requirements set forth in to the Order.

In response to the Order for Interim Safeguards and Security Compensatory Measures for the operating license for the DBNPS issued on January 7, 2003, actions were taken as described in FENOC's response dated January 27, 2003 (letter Serial Number 2832) and the supplemental response dated July 7, 2003 (letter Serial Number 2971). On January 29, 2004, FENOC notified the NRC that the actions taken to comply with the Interim Compensatory Measures related to Access Authorization were complete (letter Serial Number 3018).

At the DBNPS, the ISFSI is wholly contained within the Protected Area of the DBNPS.

Therefore, when FENOC implemented the compensatory measures for Access Authorization for operating power reactors issued January 7, 2003, these compensatory measures also included the ISFSI at the DBNPS. In accordance with Attachment 1 of the August 18, 2004 Order, the implementation of these compensatory measures represents an acceptable alternate means of complying with the Order, and no further actions are required.

Docket Number 50-346 License Number NPF-3 Serial Number 3090 Page 2 of 2 The FENOC considers all notifications and submittals with respect to the August 18, 2004 Order to be complete for the DBNPS ISFSI, based upon the full implementation of and compliance with the requirements of the Order as described above. If there are any questions concerning this matter, please contact Mr. David R. Kline, Manager - Security, at (419) 249-2322.

The statements contained in this submittal, including its associated attachments, are true and correct to the best of my knowledge and belief. I am authorized by the FirstEnergy Nuclear Operating Company to make this submittal. I declare under penalty of perury that the foregoing is true and correct.

Executed on September 3, 2004.

Sincerely, Mark B. Bezilla

/

GMW Attachments:

1) Commitment List cc: J. L. Caldwell, Regional Administrator, NRC Region III J. -B. Hopkins, DB-l NRC/NRR Senior Project Manager C. S. Thomas, DB-1 Senior Resident Inspector Utility Radiological Safety Board NRC Document Control Desk

Docket Number 50-346 License Number NPF-3 Serial Number 3090, Page 1 of 1 COMMITMENT LIST The following list identifies those actions committed to by the Davis-Besse Nuclear Power Station in this document. Any other actions discussed in the submittal represent intended or planned actions by Davis-Besse. They are described only as information and are not regulatory commitments. Please notify the Director-Performance Improvement (419) 321-7181 at Davis-Besse of any questions regarding this document or associated regulatory commitments.

COMMITMENTS DUE DATE None N/A