ML053290187
| ML053290187 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 08/27/2005 |
| From: | Santini P, Schwartz G Entergy Nuclear Indian Point 2 |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| CR-IP2-2005-03470, FOIA/PA-2005-0369 | |
| Download: ML053290187 (1) | |
Text
Entergy CORRECTIVE ACTION ICR-IP2-2005-03470 CA Number:
I I
t Group Assigned By: Operations Watch Staff Assigned To: Eng Project Mgmt Subassigned To:
Name Santini,Philip R Schwartz,Geoffrey E Originated By: SantiniPhilip R 8/26/2005 15:09:47 Performed By: SchwartzGeoffrey E 8,27/2005 06:42:57 Subperformed By:
Approved By:
Closed By: Leone,Mark C 8/27/2005 09:08:25 Current Due Date: 08/27/2005 Initial Due Date: 08/27/2005 CA Type: OPERABILITY INPUT Plant Constraint: #NONE CA
Description:
Provide operability input for hole under the FSB east loading bay cinder block wall.
Response
This condition does not present a structural operability concern for the wall under which the soil displaced, since the wall is supported a column to column beams; consequently it is not a structural operability concern for the FSB. Also, the SFP is not affected since it is a separate structure from the FSB (reference CR-IP2-2005-3424-CA-2 OE)L Subresponse:
Closure Comments:
Inmormawn in l s record was deleted in accordance wi Freedom cN k M8 Set xy.~b 4_
FA-A AcX6oG
-