ML053290187

From kanterella
Jump to navigation Jump to search
Entergy Corrective Action, CR-IP2-2005-03470
ML053290187
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 08/27/2005
From: Santini P, Schwartz G
Entergy Nuclear Indian Point 2
To:
Office of Nuclear Reactor Regulation
References
CR-IP2-2005-03470, FOIA/PA-2005-0369
Download: ML053290187 (1)


Text

Entergy CORRECTIVE ACTION ICR-IP2-2005-03470 CA Number: I I t . Group Name .

Assigned By: Operations Watch Staff Santini,Philip R Assigned To: Eng Project Mgmt Schwartz,Geoffrey E Subassigned To:

Originated By: SantiniPhilip R - 8/26/2005 15:09:47 Performed By: SchwartzGeoffrey E 8,27/2005 06:42:57 Subperformed By:

Approved By:

Closed By: Leone,Mark C 8/27/2005 09:08:25 Current Due Date: 08/27/2005 Initial Due Date: 08/27/2005 CA Type: OPERABILITY INPUT Plant Constraint: #NONE CA

Description:

Provide operability input for hole under the FSB east loading bay cinder block wall.

Response

This condition does not present a structural operability concern for the wall under which the soil displaced, since the wall is supported a column to column beams; consequently it is not a structural operability concern for the FSB. Also, the SFP is not affected since it is a separate structure from the FSB (reference CR-IP2-2005-3424-CA-2 OE)L Subresponse:

Closure Comments:

Inmormawn in l s record was deleted inaccordance wi Freedom cNk M8 Set xy.~b 4_

FA-AAcX6oG -