ML053270150
| ML053270150 | |
| Person / Time | |
|---|---|
| Site: | Columbia (NPF-021) |
| Issue date: | 03/21/2002 |
| From: | Energy Northwest |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| M545-3, Rev 20 | |
| Download: ML053270150 (1) | |
Text
DWG NO.
SCALE APPROVED DESIGN CHECKED DRAWN REV.
K J
H G
F E
D C
B A
K J
H G
E F
D C
B 1
2 3
4 5
6 7
8 9
10 11 1
2 3
4 5
6 7
8 9
10 11 A
5KW A
H A
H A
H A
H AO F.C.
A A
A L
M 5HP RMS STOP ON ISOLATION SIGNAL F,A,Z A
H A
H 1000 CFM A
N.C.
1/4"MD(99)-1 REA-FU-2A N.C.
M545-2 A
A 1/2" (B/4)
M515-1 N.C.
1000 CFM A
H A
H SIGNAL F,A,Z ISOLATION STOP ON RMS M
5HP A
L A
A A
H A
H A
H A
H 5KW E.D.R.
2" DRAIN SP SP SP SP M537 (K/14)
(K/11)
M539 (K/9)
M539 (K/6)
M539 (K/10)
M537 (K/13)
M539 (K/15)
M539 4"
4" 4"
4" VENT RISERS FROM FLOOR AND EQUIPMENT DRAINS 14" SVT FLOOR DRAIN SUMP FDR-SUMP-R1 DRAIN SUMP FLOOR FLOOR DRAIN SUMP DRAIN SUMP FLOOR DRAIN SUMP EQUIPMENT 12" SVT M545-2 (F/6)
REACTOR BUILDING F.O.
A A
A 16" SVT 0/1000 CFM 85 CFM (TYP) 6" 4"EDR(45)-1 6"FDR(43)-1 6"FDR(44)-1 6"FDR(45)-1 4"EDR(46)-1 6"FDR(42)-1 3"MWR(30)-1S 6"
(TYP) 80 CFM EL. 606'-10 1/2" 16" SVT 2"
(TYP) 3" N.O.
A H
A H
SUMP VENT EXHAUST FILTER SYSTEM (PIPE MATERIAL ONLY DESIGNATED AS "SVT")
RO FDR 2
RO FDR 3
RO FDR 4
RO dPIC 3
REA 3
dPT REA REA-V-18 1/4"MD(99)-1 FP-V-REA/14 REA-AD-2A REA 2A1 TIS 2A dPT REA dPIC 2A REA REA 2A2 TS REA 2A3 TS REA 2A5 dPIS REA 3
TI REA 2A4 dPIS REA 2A3 dPIS REA 2A2 dPIS REA 2A1 dPIS FP-V-REA/2B REA-AD-2B REA 52 SP REA 54 SP REA 2B1 TIS dPIC 2B REA 2B dPT REA REA 2B2 TS REA 2B3 TS REA 2B5 dPIS REA 51 SP REA 2B4 dPIS REA 2B3 dPIS REA 2B2 dPIS REA 2B1 dPIS REA-CF-2A REA-HF-2A REA-FL-2A REA-EHC-2A REA-MS-2A REA-V-D1 REA-V-D2 REA-V-D3 REA-V-D4 REA-V-D5 REA-V-D6 REA-CF-2B REA-HF-2B REA-FL-2B REA-EHC-2B REA-MS-2B REA-V-D10 REA-V-D11 REA-V-D12 REA-V-D7 REA-V-D8 REA-V-D9 REA-V-53 REA-V-51 FSAR FIG.
RAH E-PP-8AA 120V A.C.
INVERTER EXHAUST AIR PLENUM 80,000 CFM M
200HP O
C 80,000 CFM F.C.
F.C.
80,000 CFM C
O 200HP M
A L
A A
L INSIDE EAST WALL OUTSIDE OUTSIDE NORTH WALL INSIDE LP HP LP HP LP HP LP HP OUTSIDE SOUTH WALL INSIDE OUTSIDE WEST WALL INSIDE INSIDE WEST WALL OUTSIDE INSIDE SOUTH WALL OUTSIDE HP LP HP LP HP LP HP LP INSIDE NORTH WALL OUTSIDE OUTSIDE EAST WALL INSIDE NOTE: LOW HIGH VOLTAGE SELECT P/
STOP ON ISOLATION SIGNAL F,A,Z A
H A
L A
A P/
SELECT HIGH VOLTAGE NOTE: LOW A
L A
H STOP ON ISOLATION SIGNAL F,A,Z CONNECTION FOR SMOKE REMOVAL DUCT AND FAN REA-FN-16 (M545-1 C/5)
CONNECTION FOR RAD. PROBE REA-RE-10 SEE NOTE 6a SEE NOTE 6c N.O.
F.C.
N.O.
F.C.
A T
T A
1" PI(1)-1-(IR-71)-12 SEE NOTE 2 1" PI(1)-1-(IR-71)-13 SEE NOTE 2 1" PI(1) (IR-68)-9 1" PI(1) (IR-68)-15 O
C O
C 80,000 CFM CLOSE ON ISOLATION SIGNAL F,A,Z A
H 6 SECOND HOLD UP. (DUCT RUN)
M545-2 REA 9B RE REA 9A RE REA-FN-1A REA-SPV-1A REA-AD-1A AO LWS 1A REA LAG 1A REA 1A1 dPT REA 1A2 dPT REA 1A3 dPT REA 1A4 dPT REA dPIC 1A REA dPR 1A REA dPS 2A REA REA 1A dPS REA 1B dPS E/P 1A REA REA-SPV-3B REA 9C RE RIS 609A REA RIS 609B REA RIS 609C REA RIS 609D REA REA-RR-603 REA 9D RE 1B1 dPT REA 1B2 dPT REA 1B3 dPT REA 1B4 dPT REA REA-FN-1B dPR 1B REA REA-AD-1B AO E/P 1B REA REA 97 RSM M544 (F/3)
TO ELEVATED RELEASE POINT RRA-SR-30 RE 3
RRA RIS 3
RRA RR 3
PRM dPS 2B REA dPIC 1B REA LAG 1B REA LWS 1B REA 5000 CFM A L M
5HP 1 1/2" DRAIN R105 RAILROAD LOCK EL. 441'-0" 4000 CFM CFM 4250 MAIN STEAM TUNNEL EL. 501'-0" R310 RRA-FC-8 RRA-FN-8 RRA-CC-8 RMS RMS RRA-FC-9 RRA-FN-9 RRA-CC-9 RRA 3
TIS RRA 4
TIS RMS RRA 4
FS RRA-EHC-7 RRA-AH-7 RRA-CC-7 RRA-FL-7 SIGNAL F,A,Z CLOSE ON ISOLATION 80,000 CFM C
O C
O 1" PI(1)-1-(IR-67)-13 SEE NOTE 2 SEE NOTE 2 1" PI(1)-1-(IR-69)-16 A
T T
A N.O.
F.C.
N.O.
F.C.
REA-V-2 BUILDING ISOLATION VALVES (G/5)
M545-2 C
O F.O.
O C
A 80,000 CFM DEACTIVATED-LOCKED IN 100%
OPEN POSITION 80,000 CFM A L M
200HP STOP ON ISOLATION SIGNAL F,A,Z A
A L M
200HP STOP ON ISOLATION SIGNAL F,A,Z A
L A
H 80,000 CFM 80,000 CFM 80,000 CFM F.C.
F.O.
AO A
SEE NOTE 6a ZS M
SEE NOTE 4 (4)1/15HP A
END OF ROLL 2.
SPV IS SIZED FOR A MINIMUM CV = 13 AND THE AIR LINE TO THE VALVE IS 1".
3.
EXHAUST FANS REA-FN-1A/1B ARE CAPABLE OF EXHAUSTING 105,950 CFM FOR MAINTAINING 0.25" W.G. NEGATIVE PRESSURE IN THE BUILDING.
4.
INSTALL THIS FILTER ACCORDING TO ABNORMAL CONDITION SEE NOTE 3 SEE NOTE 3 1.
FOR GENERAL NOTES AND LEGEND SEE DRAWING M545-1.
NOTES PI RMS TYPICAL OF 5 SPRAY HEADERS; O
C ROA-V-21 HS STATION S-7 (DWG.
M514 F/6)
A M
10HP RMS A
L A
L A
L A
L M
A A
(J/11)
P541-1 F.C.
UNIT ROA-HV-1 PLENUM DRAINS (TYPICAL OF 4)
E.D.
E.D.
TO 4" FDR-1 DWG. M539 (H/7)
E/P 1
ROA 1
FT ROA ROA 1
FE ROA-SPV-3 ROA-AD-3A ROA-AD-3B ROA-V-703 ROA-V-704 ROA-SPV-100 ROA-SPV-2 ROA-SPV-21 ROA-AW-1 ROA 3
TIC ROA-FL-1A ROA-FL-1B ROA-FL-2 ROA 1
dPI ROA 2
dPI ROA-FN-1A ROA-FN-1B ROA 2
TE MV/I 2
ROA TI 2
ROA ROA 11A dPS ROA 11B dPS ROA 2
TS ROA 3
TS OPEN AT 3.5" ROA-V-53 ROA-SPV-22 ROA-V-22 ROA-V-51 ROA-V-60(TH)
ROA-V-81 ROA 1
FI ROA 4
PS ROA 1B LS ROA 1A LS ROA-V-54 ROA-V-701A ROA-P-1A ROA-V-56 ROA-V-55 ROA 5
PS TM 1A ROA RMS TIS 4
ROA 6
TE ROA 4
TE ROA 1
ROA TS 22 ROA TI 1
ROA 5
TE ROA TIS 5
ROA RMS TM 1B ROA ROA-V-701B ROA-V-57 ROA-P-1B ROA-V-58 ROA-V-59 ROA-V-23 ROA-HC-1 ROA-AD-2 TIS 6
ROA ROA FU1A TM ROA FU1B TM ROA 3
ROA AO 1A REA AO 1B REA REA-FU-2B HEATING, VENTILATION FLOW DIAGRAM AND AIR CONDITIONING REACTOR BUILDING R.B. CLEAVENGER 9-7-89 M545-3 SIGNATURE DATE TITLE NTS ROA-V-70 1" PI(1) (IR-69)-17 ROA-V-2 ROA-V-1 1" PI(1) (IR-67)-10 ROA-SPV-200 ROA-SPV-1 ROA-V-52 ROA-V-80 ROA-V-79 ROA-V-69 ROA-AD-5 ROA-SPV-23 RRA-FN-7 E.D.
1 1/2" DRAIN 1 1/2" DRAIN REA-FN-2B REA-V-52 (B/14)
M544 FP-V-REA/21 REA-SPV-2B REA-V-54 (B/14)
M544 FP-V-REA/11 REA-SPV-2A (K/5)
(F/2)
REA-AD-7 TO SGT-FN-1A2 DWG. M544 (G/7)
TO SGT-FN-1B2 DWG. M544 (E/8)
REA-SPV-1B DWG. M544 (B/7)
TO SGT-FN-1B1 DWG. M544 (K/8)
TO SGT-FN-1A1 REA-SPV-3A REA-V-1 ROA-V-67 (M545-1) 4"FP(60)-1 2"FP(60)-1 M515-1 (B/4)
A L 1000 CFM REA 53 SP 0/1000 CFM A
(M545-1)
(M545-1)
A FP-V-REA/13 FP-V-REA/2A FP-V-REA/701A 3/4" 1/2" 1/4" 1/4" 1/2" 1/4" 1"FP(60)-1 1"FP(60)-1 3/4" 1/4" FP-V-REA/701B FP-V-REA/23 1/4" 2"FP(60)-1 1"FP(60)-1 1"FP(60)-1 FP-V-REA/24 20 ROA-AD-1A ROA-AD-1B REA-FN-2A FP-ST-REA/2A FP-ST-REA/2B REA-SPV-2 REA-SPV-1 RMS V/1 ROA RMS V/2 ROA ROA-ACC-1 ROA-ACC-2 AO V2 ROA AO V1 ROA RMS FN1B ROA RMS FN1A ROA RMS FN1B REA RMS FN1A REA REA-ACC-2 REA-ACC-1 RMS V/2 REA RMS V/1 REA AO V1 REA AO V2 REA REA REA FN/2A FN/2B FN/8 RRA RRA FN/9 FN/7 RRA REA-RV-1 REA-RV-2 FIS 3
RRA ROA-RV-2 ROA-RV-1 ROA 1A PI ROA 1B PI ROA-V-702A ROA-V-702B P/1A P/1B ROA ROA TM/1A ROA TM/1B ROA FDR-SUMP-R2 FDR-SUMP-R3 FDR-SUMP-R4 EDR-SUMP-R5 REA 97 SP (THIS DWG.)
(THIS DWG.)
(THIS DWG.)
VALVES ROA-V-74(TH) THRU ROA-V-78(TH)
AND ROA-PI-2 THRU ROA-PI-6 RESPECTFULLY (THIS DWG.)
(THIS DWG.)
(THIS DWG.)
(THIS DWG.)
15KW E.D.R.
F.C.
AO 1000 CFM H.S. McCLUER C.O. ROMINE S.R. PAYNE 3-6-90 3-6-90 3-6-90 M
2HP M
2HP SEE DWG. M508-1 (C/15) 1 1/2"TSW SEE DWG. M508-1 (B/15) 1 1/2"TSW M508-1 (C/13)
SEE DWG.
1"TSW TO TSW-V-H7 DWG. M508-1 (B/12)
A PS HS-V-R7F 21 ROA F.C.
TOP TIER FROM EQUIPMENT ACCESS AREA 1" CAS(57)-1 BLIND FLG.
INTERMEDIATE HIGH LOW FROM TEA-RIS-13 M546-1 (K/6)
FROM TEA-RIS-13A M546-1 (K/6)
FROM TRA-RIS-1 M546-1 (K/6)
FROM TSW-RIS-5 M508-2 (E/6)
FROM WEA-RIS-14 M549-1 (E/1)
FROM WEA-RIS-14A M549-1 (F/1)
FROM WRA-RIS-1 M549-1 (B/4)
FROM WRA-RIS-2 M549-1 (D/1)
FROM PRM-COMP-3 M544 (K/3)
FAIL H
A FP REA/2A1 PI FP REA/2A2 PI FP REA/2A RO FP REA/2B1 PI FP REA/2B2 PI FP REA/2B RO FP REA/2B PS REA/2A FP PS 23048 Z ISOL SIGNAL RB EXH PLENUM RAD MON DWNSCL RB EXH PLENUM RAD HI-HI 23049 RB EXH PLENUM RAD HI A L A
HH T
T SEE NOTE 7 (M545-1)
SEE NOTE 7 (M545-1)
SEE NOTE 7 (M545-1)
SEE NOTE 7 (M545-1) 0-10,500 CFM FROM PRIMARY CONTAINMENT DWG M543-3 (K/10) 0-10,500 CFM TO DRYWELL AND SUPPRESSION CHAMBER PURGE SUPPLY DWG M543-3 (H/3)
DWG M543-3 (J/3)
FROM CSP-RMS-V/11 2HP RMS 1 1/2" DRAIN RRA-CC-21 RRA-FC-21 E.D.R.
M RRA-FN-21 FN/21 3000 CFM SEE DWG. M508-1 (D/13) 1 1/2"TSW RRA 5.
THIS EQUIPMENT DRAIN ROUTES TO FDR SUMP R-4 (SEE M537 & M539)
E.D.R.
(SEE NOTE 5)
(SEE NOTE 5)
(SEE NOTE 5)
PROCEDURE ABN-ASH, "ASH FALL".
NORTHWEST COLUMBIA GENERATING STATION DATE REV DESCRIPTION APVD CHK DWN 20 03-21-02 REV PER 01474-011 (F/1), 01496-011 (C/5), 01459-016 (F/1)
JFT BLS SRP