ML053270143

From kanterella
Jump to navigation Jump to search
Drawing M543-2, Rev 8, Flow Diagram - Reactor Building Primary Containment Cooling and Purging System
ML053270143
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/28/2003
From:
Energy Northwest
To:
Office of Nuclear Reactor Regulation
References
M543-2, Rev 8
Download: ML053270143 (1)


Text

DWN CHK APVD DESCRIPTION DATE REV FSAR FIG.

7 3-28-02 REDRAWN PER 01425-006 LWC BLS SRP REACTOR X-82c PI-V-X82C PI-V-X82C1 SP 77 1"PI(1)-4S-X82c PI-V-X82C2 PI-VX-265 SEE NOTE 1a SEE NOTE 1b 3/4"PI(1)-4S-X82C TE SR-13 HT 1/1 TE SR-13 HT 1/2 T

RMS O

C TT 13/1 HT TS 13/1 HT 1/2"PI(1)-ST-(CMS-SR-13)-8 X-78a PI-V-X78A PI-V-X78A1 1"PI(1)-4S-X78a PI-V-X78A2 3/4"PI(1)-4S-X78a PI-EFC-X78A TE SR-13 HT 2/1 TE SR-13 HT 2/2 O

C SEE NOTE 1a SEE NOTE 1b TS 13/2 HT TT 13/2 HT TS 13/4 HT TT 13/4 HT SEE NOTE 1a SEE NOTE 1b 1/2"PI(1)-ST-(CMS-SR-13)-9 TS 13/3 HT TT 13/3 HT X-72e PI-V-X72E PI-V-X72E1 1"PI(1)-4S-X72e PI-V-X72E2 3/4"PI(1)-ST-X72e PI-VX-264 RMS T

O C

TE SR-13 HT 3/1 TE SR-13 HT 3/2 TE SR-13 HT 4/1 TE SR-13 HT 4/2 CMS-V-1347 CMS-V-1346 CMS-V-1348 O

C T

RMS 1/2"PI(1)-ST-(CMS-SR-13)-7 SP 76 3/4"PI(1)-4S-X72e X-72d PI-V-X72D PI-VX-263 1"PI(1)-4S-X72d 3/4"PI(1)-ST-X72d PI-V-X72D1 PI-V-X72D2 1/2"PI(1)-ST-(CMS-SR-13)-6 X-72c PI-V-X72C PI-V-X72C1 PI-V-X72C2 PI-VX-262 3/4"PI(1)-4S-X72c 1"PI(1)-4S-X72c 3/4"PI(1)-4S-X72d SP 74 SP 75 3/4"PI(1)-4S-X72c 1/2"PI(1)-ST-(CMS-SR-13)-5 TE SR-13 HT 5/1 TE SR-13 HT 5/2 O

C RMS T

TS 13/5 HT TT 13/5 HT RMS 30/SR13 HT TT 30/SR13 HT SAMPLE HANDLING EQUIPMENT HYDROGEN OXYGEN MONITOR CMS-SR-13 CONT. ON ZONE K/14 CONT.

ZONE G/15 02H2R 1

CMS CP 1301 AH AHH AH C

C H 2 O 2 T

T CMS-TK-1305 (1) *

(2)

  • 1/2"PI(1)-ST-(CMS-SR-13)-DT P

CMS-TK-1304 1/2"PI(1)-ST-(CMS-SR-13)-C2 4

CMS-TK-1303 1/2"PI(1)-ST-(CMS-SR-13)-3 3

CMS-TK-1302 1/2"PI(1)-ST-(CMS-SR-13)-2 2

CMS-TK-1301 1/2"PI(1)-ST-(CMS-SR-13)-C1 1

( SEE NOTE 2 FOR EPN'S)

ASME C.G."C" B31.1 C.G."D" SEE NOTE 1a SEE NOTE 1b SEE NOTE 1a SEE NOTE 1b SEE NOTE 1a SEE NOTE 1b SP 78 3/4"PI(1)-4S-X73c 1"PI(1)-4S-X73c X-73c 1"PI(1)-4S-X73d 3/4"PI(1)-4S-X73d SP 80 X-73d PI-V-X73C PI-VX-266 3/4"PI(1)-4S-X73c PI-V-X73C1 PI-V-X73C2 PI-VX-268 PI-V-X73D PI-V-X73D1 PI-V-X73D2 3/4"PI(1)-4S-X73d RMS O

C T

RMS T

O C

CMS-V-1448 CMS-V-1447 CMS-V-1446 SAMPLE HANDLING EQUIPMENT HYDROGEN OXYGEN MONITOR CMS-SR-14 CONT. ZONE K/6 1/2"PI(1)-ST-(CMS-SR-14)-6 1/2"PI(1)-ST-(CMS-SR-14)-5 TS 14/4 HT TT 14/4 HT TE SR-14 HT 2/1 TE SR-14 HT 2/2 TE SR-14 HT 4/2 TE SR-14 HT 4/1 TE SR-14 HT 3/2 TE SR-14 HT 3/1 1/2"PI(1)-ST-(CMS-SR-14)-7 TS 14/3 HT TT 14/3 HT 02H2R 2

CMS CP 1401 AH AHH AH C

C H 2 O 2 T

T RMS 30/SR14 HT TT 30/SR14 HT 1"PI(1)-4S-X42C X-42c PI-V-X42C PI-V-X42C1 PI-V-X42C2 1/2"PI(1)-4S-X42c PI-EFC-X42C O

C TS 14/2 HT TT 14/2 HT 1/2"PI(1)-ST-(CMS-SR-14)-9 X-84b PI-V-X84B PI-V-X84B1 SP 81 1"PI(1)-4S-X84b PI-V-X84B2 3/4"PI(1)-4S-X84b PI-VX-269 RMS T

O C

TE SR-14 HT 1/1 TE SR-14 HT 1/2 TS 14/1 HT TT 14/1 HT 1/2"PI(1)-ST-(CMS-SR-14)-8 C-V-X16/3 C-V-X16/1 (LOCK VENT VALVE)

(D00R SEAL VENT VALVE)

DPI 4

C DPI 3

C DPS 1

C DPI 2

C DPS 2

C UPPER LEFT LOWER RIGHT DPS 3

C DPS 4

C TOP BOTTOM C-V-X16/4 (D00R SEAL VENT VALVE)

C-V-X16/2 C-V-X16/6 C-V-X16/5 (LOCK VENT VALVE)

(EMERGENCY AIR SUPPLY INLET)

(EMERGENCY AIR SUPPLY OUTLET)

DPI 1

C C-X-16 PERSONNEL ACCESS LOCK

[PLAN VIEW SHOWN ROTATED 90°]

CONT.

ZONE G/5 CMS-TK-1405 (1) *

(2)

  • 1/2"PI(1)-ST-(CMS-SR-14)-DT P

CMS-TK-1404 1/2"PI(1)-ST-(CMS-SR-14)-C2 4

CMS-TK-1403 1/2"PI(1)-ST-(CMS-SR-14)-3 3

CMS-TK-1402 1/2"PI(1)-ST-(CMS-SR-14)-2 2

CMS-TK-1401 1/2"PI(1)-ST-(CMS-SR-14)-C1 1

( SEE NOTE 2 FOR EPN'S)

ASME C.G."C" B31.1 C.G."D" NOTES:

1. ALL PIPING AND VALVES AND ASSOCIATED COMPONENTS ON THIS DRAWIING SHALL BE CLASSIFIED AS FOLLOWS:

(BREAK POINTS INDICATED ON FLOW DIAGRAM)

a. PIPING AND VALVES WITHIN PRIMARY CONTAINMENT AND UP TO THE OUTERMOST ISOLATION VALVES:

SEISMIC CATEGORY I QUALITY CLASS I CODE GROUP B

b. PIPING AND VALVES BEYOND THE OUTERMOST ISOLATION VALVES (INSTRUMENT LINES):

SEISMIC CATEGORY I QUALITY CLASS I CODE GROUP C

2. CMS EPN'S FOR CALIBRATION GAS:

TANK # (1)REGULATOR# (2)RELIEF VALVES# TANK VALVE CMS-TK-1301 CMS-PRV-1301 CMS-RV-1301 CMS-V-1351 CMS-TK-1302 CMS-PRV-1302 CMS-RV-1302 CMS-V-1352 CMS-TK-1303 CMS-PRV-1303 CMS-RV-1303 CMS-V-1353 CMS-TK-1304 CMS-PRV-1304 CMS-RV-1304 CMS-V-1354 CMS-TK-1305 CMS-PRV-1305 CMS-RV-1305 CMS-V-1355 CMS-TK-1401 CMS-PRV-1401 CMS-RV-1401 CMS-V-1451 CMS-TK-1402 CMS-PRV-1402 CMS-RV-1402 CMS-V-1452 CMS-TK-1403 CMS-PRV-1403 CMS-RV-1403 CMS-V-1453 CMS-TK-1404 CMS-PRV-1404 CMS-RV-1404 CMS-V-1454 CMS-TK-1405 CMS-PRV-1405 CMS-RV-1405 CMS-V-1455

3. REPRESENTS RACK CONNECTION BULKHEAD NUMBER.

2 1

3 15 14 13 12 11 10 9

8 7

6 5

4 F

E D

C B

F E

D C

B K

J H

G K

J H

G 13 14 15 A

PDS2-E1 4

5 6

7 8

9 10 11 12 DWN CHK APVD DESCRIPTION DATE REV 3

1 2

A APPROVED COLUMBIA GENERATING STATION TITLE DATE SIGNATURE CHECKED SCALE DRAWN DWG NO.

REV.

FLOW DIAGRAM - REACTOR BUILDING PRIMARY CONTAINMENT COOLING AND PURGING SYSTEM M543-2 8

NTS L. W. CONLEY 12-15-00 BEN STAFFORD 9-19-01 SCOTT PAYNE 3-28-02 SERVER84\\00\\dwg REFERENCES TO CONTRACT NUMBERS, SUCH AS 215, 206, 220, FOUND IN THE NOTES ON THIS DRAWING REFER TO ORIGINAL CONSTRUCTION DESIGN REQUIREMENTS.

CURRENT DESIGN REQUIREMENTS ARE DOCUMENTED IN THE STATION DESIGN SPECIFICATIONS AND ACTIVE CONTRACT SPECIFICATIONS WHICH STILL APPLY.

L. TEMP.

L. TEMP.

L. TEMP.

L. TEMP.

L. TEMP.

L. TEMP.

L. TEMP.

L. TEMP.

L. TEMP.

8 8-28-03 REV PER 02071-005 (B/5-6)

CMO HL DRJ