Robert A. Saccone Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem IBoulevard Berwick, PA 18603 Tel. 570.542.3959 Fax 570.542.1504 RASaccone@pplweb.com I
a I
'b ft -
";s 44'**
+',,
PI TM v
TM November 8, 2005 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P I-17 Washington, D.C. 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 and 50-388/NPF-22 PLA-005985 The October 2005 Monthly Operating Reports for Susquehanna SES Units I and 2 are attached.
Very truly yours, Robert acn JJH/cmm cc: NRC Region I NRC Sr. Resident Inspector, Mr. Brice Bickett NRC Project Manager, Mr. R V. Guzman m e Z4-
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 11/10/2005 J. J. Hennings (570) 542-3747 1.
2.
3.
4.
OPERATING STATUS Unit Name:
Susquehanna Steam Electric Station (U I)
Reporting Period:
October 2005 Design Electrical Rating (Net MWe):
1177 Maximum Dependable Capacity (Net MWe):
1135 5.
6.
7.
8.
9.
Hours in Reporting Period Number of Hours Reactor Was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWH)
This Month 745 679.7 672.1 0
749.966 Yr.-to-Date 7,296.0 7,230.7 7,223.1 0
8,165.309 Cumulative 196,369.0 165,218.7 162,823.1 0
168,805,751 NOTES:
Page I of I
UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-387 One 11/10/2005 J. J. Hennings (570) 542-3747 REPORT MONTH October 2005 No.
Date Type Duration Reason Method of Cause & Corrective Action I
(Hours) 2 Shutting To Prevent Recurrence Down Reactor 3 10/29/05 S
72:55 B
(continuing)
On 10/29/05 a planned Reactor shutdown started a Maintenance Outage established for measurement of fuel channels and replacement of those not meeting pre-established criteria.
The Maintenance Outage schedule specifies activities that replace the channels of some in-core fuel bundles as well as replacing some bundles with those from previous fuel cycles. This activity will correct the issue of excess control cell friction experienced during control rod testing earlier this year.
The Maintenance Outage is planned to be complete in mid November.
Summary.
Unit 1 Reactor achieved 100% power on 10/03/05 following a planned power reduction for control rod friction testing that began on 9/30/05. Three(3) planned power reductions greater than 20% were performed in October for Control Rod adjustments and testing. (10/04 to 80% power, 10/08 to 79% power and 10/14 to 75%
power).
A planned maintenance outage was also initiated on 10/29/05 to correct issues with increased Control Cell friction that caused some extended Control Rod travel times. The Maintenance Outage is scheduled to end in mid November.
1.
F. Forced S. Scheduled 2.
Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction 3.
Method:
I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)
Page I of I
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:
50-387 Completed by: J. J. Hennings Date:
11/10/05 Telephone:
(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.
OPERATING DATA REPORT DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 11/10/05 J. J. Hennings (570) 542-3747 OPERATING STATUS
- 5.
Unit Name:
Susquehanna Steam Electric Station (U2)
- 6.
Reporting Period:
October 2005
- 7.
Design Electrical Rating (Net MWe):
1182
- 8.
Maximum Dependable Capacity (Net MWe):
1140
- 5.
Hours in Reporting Period
- 6.
Number of Hours Reactor Was Critical
- 7.
Hours Generator On-Line
- 8.
Unit Reserve Shutdown Hours
- 9.
Net Electrical Energy Generated (MWH)
NOTES:
This Month 745 745 745 0
858,493 Yr.-to-Date 7,296 6,527.9 6,436.8 0
7,185.396 Cumulative 181,609 159,207.7 157,129.5 0
166,000,536 Page I of I
UNIT SHUTDOWNS DOCKET NO.
UNIT DATE COMPLETED BY TELEPHONE 50-388 Two 11/10/05 J. J. Hennings (570) 542-3747 REPORT MONTH October 2005 No.
Date Type Duration Reason Method of Cause & Corrective Action (Hours) 2 Shutting to Prevent Recurrence Down Reactor 1
~3 No reactor shutdowns this month.
Summary: No power changes greater than 20% this month.
1.
2.
3.
F. Forced S. Scheduled Reason:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction Method:
I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation from previous month 5 - Other E - Operator Training & Licensee Exam F - Administrative G - Operational Error (Explain)
Page I of I
SUSQUEHANNA STEAM ELECTRIC STATION Docket Number:
50-388 Date:
I1/101105 Completed by: J. J. Hennings Telephone:
(570) 542-3747 Challenges to Main Steam Safety Relief Valves None.