November 16, 2005 Mr. John T. Conway Site Vice President Nuclear Management Company, LLC 2807 West County Road 75 Monticello, MN 55362-9637
SUBJECT:
AUDIT REPORT FOR SCOPING AND SCREENING METHODOLOGY FOR THE MONTICELLO NUCLEAR GENERATING PLANT LICENSE RENEWAL APPLICATION
Dear Mr. Conway:
By letter dated March 16, 2005, Nuclear Management Company, LLC, (NMC or the applicant) submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 (10 CFR Part 54) to renew the operating license for the Monticello Nuclear Generating Plant (MNGP), for review by the U.S. Nuclear Regulatory Commission (NRC). The NRC staff conducted an audit of the scoping and screening methodology used in developing the license renewal application (LRA). The focus of the staffs audit was to evaluate the administrative controls governing implementation of the LRA scoping and screening methodology and review of the technical basis for selected scoping and screening results for various plant systems, structures, and components. The audit team also reviewed quality attributes for aging management programs and training for personnel that developed the LRA.
The report documenting the results of the audit is now publicly available. This report can be viewed through the Agencywide Documents Access and Management System (ADAMS) using accession number ML051990091. The ADAMS Public Electronic Reading Room is accessible from the NRCs Web site at http://www.nrc.gov/reading-rm/adams.html. Persons who do not have access to ADAMS, or who encounter problems in accessing the documents located in ADAMS, should contact the NRCs PDR Reference staff at 1-800-397-4209, or 301-415-4737, or by e-mail at pdr@nrc.gov. Enclosed is a copy of the report for your information. If you have any questions, please contact me at 301-415-3777 or via e-mail at DXM2@nrc.gov.
Sincerely,
/RA/
Daniel J. Merzke, Project Manager License Renewal Branch A Division of License Renewal Office of Nuclear Reactor Regulation Docket No.: 50-263
Enclosure:
As stated cc w/o/encl: See next page
November 16, 2005 Mr. John T. Conway Site Vice President Nuclear Management Company, LLC 2807 West County Road 75 Monticello, MN 55362-9637
SUBJECT:
AUDIT REPORT FOR SCOPING AND SCREENING METHODOLOGY FOR THE MONTICELLO NUCLEAR GENERATING PLANT LICENSE RENEWAL APPLICATION
Dear Mr. Conway:
By letter dated March 16, 2005, Nuclear Management Company, LLC, (NMC or the applicant) submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 (10 CFR Part 54) to renew the operating license for the Monticello Nuclear Generating Plant (MNGP), for review by the U.S. Nuclear Regulatory Commission (NRC). The NRC staff conducted an audit of the scoping and screening methodology used in developing the license renewal application (LRA). The focus of the staffs audit was to evaluate the administrative controls governing implementation of the LRA scoping and screening methodology and review of the technical basis for selected scoping and screening results for various plant systems, structures, and components. The audit team also reviewed quality attributes for aging management programs and training for personnel that developed the LRA.
The report documenting the results of the audit is now publicly available. This report can be viewed through the Agencywide Documents Access and Management System (ADAMS) using accession number ML051990091. The ADAMS Public Electronic Reading Room is accessible from the NRCs Web site at http://www.nrc.gov/reading-rm/adams.html. Persons who do not have access to ADAMS, or who encounter problems in accessing the documents located in ADAMS, should contact the NRCs PDR Reference staff at 1-800-397-4209, or 301-415-4737,or by e-mail at pdr@nrc.gov. Enclosed is a copy of the report for your information. If you have any questions, please contact me at 301-415-3777 or via e-mail at DXM2@nrc.gov.
Sincerely,
/RA/
Daniel J. Merzke, Project Manager License Renewal Branch A Division of License Renewal Office of Nuclear Reactor Regulation Docket No.: 50-263
Enclosure:
As stated cc w/o encl: See next page DISTRIBUTION: See next page ADAMS Accession nos.: Pkg: ML053220267; Letter: ML053220358; Trip Report: ML051990091 Document Name: E:\\Filenet\\ML053220358.wpd OFFICE PM:RLEP LA:RLEP SC:RLEP NAME DMerzke MJenkins LLund DATE 11 / 15 /05 11 / 14 /05 11 / 16 /05 OFFICIAL RECORD COPY
Monticello Nuclear Generating Plant cc:
Jonathan Rogoff, Esquire Vice President, Counsel & Secretary Nuclear Management Company, LLC 700 First Street Hudson, WI 54016 U.S. Nuclear Regulatory Commission Resident Inspectors Office 2807 W. County Road 75 Monticello, MN 55362 Manager, Regulatory Affairs Monticello Nuclear Generating Plant Nuclear Management Company, LLC 2807 West County Road 75 Monticello, MN 55362-9637 Robert Nelson, President Minnesota Environmental Control Citizens Association (MECCA) 1051 South McKnight Road St. Paul, MN 55119 Commissioner Minnesota Pollution Control Agency 520 Lafayette Road St. Paul, MN 55155-4194 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Commissioner Minnesota Department of Health 717 Delaware Street, S.E.
Minneapolis, MN 55440 Douglas M. Gruber, Auditor/Treasurer Wright County Government Center 10 NW Second Street Buffalo, MN 55313 Commissioner Minnesota Department of Commerce 85 7th Place East, Suite 500 St. Paul, MN 55101-2198 Manager - Environmental Protection Division Minnesota Attorney Generals Office 445 Minnesota St., Suite 900 St. Paul, MN 55101-2127 John Paul Cowan Executive Vice President & Chief Nuclear Officer Nuclear Management Company, LLC 700 First Street Hudson, WI 54016 Nuclear Asset Manager Xcel Energy, Inc.
414 Nicollet Mall, R.S. 8 Minneapolis, MN 55401 Mr. James Ross Nuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708 Patrick Burke License Renewal Project Manager Monticello Nuclear Generating Plant Nuclear Management Company, LLC 2807 West County Road 75 Monticello, MN 55362-9637 Mr. Douglas F. Johnson Director, Plant Life Cycle Issues Nuclear Management Company, LLC 700 First Street Hudson, WI 54016
Monticello Nuclear Generating Plant cc:
David R. Lewis Pillsbury Winthrop Shaw Pittman, LLP 2300 N Street, NW Washington, DC 20037-1122 Mr. George Crocker North American Water Office P.O. Box 174 Lake Elmo, MN 55042
DISTRIBUTION: Letter to J. Conway, re: Audit report for scoping and screening, Monticello Dated: November 16, 2005 Adams Accession No.: ML053220358 Pkg: ML053220267 HARD COPY RLEP RF E-MAIL:
RidsNrrDrip RidsNrrDe G. Bagchi K. Manoly W. Bateman J. Calvo R. Jenkins J. Fair RidsNrrDssa RidsNrrDipm D. Thatcher R. Pettis G. Galletti K. Winsberg (RidsOgcMailCenter)
R. Weisman M. Mayfield A. Murphy S. Smith (srs3)
S. Duraiswamy Y. L. (Renee) Li RLEP Staff L. Raghavan L. Padovan A. Stone, RIII B. Burgess, RIII P. Lougheed, RIII R. Orlikowski, RIII A. Hodgdon M. Woods OPA