ML053180082
| ML053180082 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 04/16/2004 |
| From: | Richard Ennis Office of Nuclear Reactor Regulation |
| To: | Allan Barker, Barrett R, Beckner W, Scott Burnell, Clifford J, Charemagne Grimes, Howe A, Imbro G, John Jolicoeur, Kim T, Leeds E, Kamal Manoly, Anthony Mcmurtray, Reis T, Ruland W, Thomas Scarbrough, Diane Screnci, Neil Sheehan, Skay D, Terao D, Wang A, Wu C Office of Nuclear Reactor Regulation |
| References | |
| FOIA/PA-2004-0369 | |
| Download: ML053180082 (3) | |
Text
Scott Burnell - Fwd: FYI CRACKS FOUND IN VY DRYER pane 11 From:
Rick Ennis To:
Alan Wang; Allan Barker; Allen Howe; Anthony McMurtray; Cheng-lh Wu; Christopher Grimes; David Terao; Diane Screnci; Donna Skay; Eric Leeds; Gene Imbro; James Clifford; John Jolicoeur; Kamal Manoly; Neil Sheehan; Richard Barrett; Scott Burnell; Tae Kim; Terrence Reis; Thomas Scarbrough; William Beckner; William Ruland Date:
4116/04 11:11AM
Subject:
Fwd: FYI CRACKS FOUND IN VY DRYER CC:
Cliff Anderson; David Pelton; Tad Marsh
/J
l Scott Burnell - Fwd: FYI CRACKS FOUND IN VY DRYER Page 1 From:
To:
Date:
Subject:
Cliff Anderson' 4r Raymond Lorson 4/16/04 10:42AM Fwd: FYI CRACKS FOUND IN VY DRYER fyi CC:
David Pelton; Donald Florek; Rick Ennis
Scoqitt Burnell - FYI CRACKS FOUND IN VY DRYER
-Page 1 From:
James Wiggins I
[
To:
Jim Dyer; Samuel Collins Date:
4/16/04 10:40AM
Subject:
FYI CRACKS FOUND IN VY DRYER FYI Some preliminary info re: VY dryer cracks....
Entergy is considering a press release that covers the fact that, with GE, it identified 4 cracks in the dryer during visual inspections conducted this outage. Entergy says that the 4 cracks are in low-stress, low-steam flow, areas of the dryer, and not in the areas affected at the EPU plants.
Two of the cracks, located in weld areas, were ground-out and repaired; the other two are not accessible.
We're continuing to monitor this situation...we had an ISI inspection this week that looked at this issue as part of our planned inpection activities connected with NRR's EPU review.
More to come when info is available.
Jim CC:
Brian Sheron; Hubert Miller; Richard Borchardt; Tad Marsh