ML053140325

From kanterella
Jump to navigation Jump to search
D.C. Cook Re Notification of an NRC Triennial Fire Protection Baseline Inspection (05000315-06-002 (Drs); 05000316-06-002 (Drs))
ML053140325
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/31/2005
From: Julio Lara
Engineering Branch 3
To: Nazar M
Indiana Michigan Power Co
References
IR-06-002
Download: ML053140325 (8)


See also: IR 05000315/2006002

Text

October 31, 2005

Mr. M. Nazar

Senior Vice President and

Chief Nuclear Officer

Indiana Michigan Power Company

Nuclear Generation Group

One Cook Place

Bridgman, MI 49106

SUBJECT:

DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2

NOTIFICATION OF AN NRC TRIENNIAL FIRE PROTECTION BASELINE

INSPECTION 05000315/2006002(DRS); 05000316/2006002(DRS)

Dear Mr. Nazar:

On January 23, 2006, the U.S. Nuclear Regulatory Commission (NRC) will begin a triennial fire

protection baseline inspection at the Donald C. Cook Nuclear Power Plant, Units 1 and 2. This

inspection will be performed in accordance with the NRC baseline Inspection

Procedure 71111.05T.

The schedule for the inspection is as follows:

Information gathering visit - January 11 - 13, 2006

On-site inspection activity - January 23 - 27, 2006, and February 6 - 10, 2006

The purpose of the information gathering visit is: (1) to obtain information and documentation

needed to support the inspection; (2) to become familiar with the Donald C. Cook Nuclear

Power Plants fire protection program, fire protection features, post-fire safe shutdown

capabilities and plant layout; and (3) to arrange administrative details such as office space,

availability of knowledgeable office personnel and to ensure unescorted site access privileges.

Experience has shown that the baseline fire protection inspections are extremely resource

intensive both for the NRC inspectors and the licensee staff. In order to minimize the

inspection impact on the site and to ensure a productive inspection for both organizations, we

have enclosed a request for documents needed for the inspection. These documents have

been divided into four groups. The first group lists information necessary to aid the inspection

team in choosing specific focus areas for the inspection. It is requested that this information be

provided to the lead inspector via mail or electronically no later than December 16, 2005. The

second group lists information necessary to ensure that the inspection team is adequately

prepared for the inspection. This information should be available on-site no later than

January 11, 2006. The third group of requested documents are those items that the team will

review, or need access to, during the inspection. Please have this information available by the

first day of the on-site portion of the inspection (January 23, 2006). The fourth group lists

M. Nazar

-2-

information necessary to aid the inspection team in tracking issues identified as a result of the

inspection. It is requested that this information be provided to the lead inspector as the

information is generated during the inspection. It is important that all of these documents are

up to date and complete in order to minimize the number of additional documents requested

during the preparation and/or the on-site portions of the inspection.

The lead inspector for this inspection is Mr. George M. Hausman. We understand that our

regulatory contact for this inspection is Mr. Rick Jervey of your organization. If there are any

questions about the inspection or the material requested, please contact the lead inspector at

(630) 829-9743 or via e-mail at gmh1@nrc.gov.

In accordance with 10 CFR Part 2.390 of the NRC's "Rules of Practice," a copy of this letter

and its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Julio F. Lara, Chief

Engineering Branch 3

Division of Reactor Safety

Docket Nos. 50-315; 50-316

License Nos. DPR-58; DPR-74

Enclosure:

Fire Protection Inspection Document Request

cc w/encl:

J. Jensen, Site Vice President

L. Weber, Plant Manager

G. White, Michigan Public Service Commission

L. Brandon, Michigan Department of Environmental Quality -

Waste and Hazardous Materials Division

Emergency Management Division

MI Department of State Police

D. Lochbaum, Union of Concerned Scientists

M. Nazar

-2-

information necessary to aid the inspection team in tracking issues identified as a result of the

inspection. It is requested that this information be provided to the lead inspector as the

information is generated during the inspection. It is important that all of these documents are

up to date and complete in order to minimize the number of additional documents requested

during the preparation and/or the on-site portions of the inspection.

The lead inspector for this inspection is Mr. George M. Hausman. We understand that our

regulatory contact for this inspection is Mr. Rick Jervey of your organization. If there are any

questions about the inspection or the material requested, please contact the lead inspector at

(630) 829-9743 or via e-mail at gmh1@nrc.gov.

In accordance with 10 CFR Part 2.390 of the NRC's "Rules of Practice," a copy of this letter

and its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRC's

document system (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Julio F. Lara, Chief

Engineering Branch 3

Division of Reactor Safety

Docket Nos. 50-315; 50-316

License Nos. DPR-58; DPR-74

Enclosure:

Fire Protection Inspection Document Request

cc w/encl:

J. Jensen, Site Vice President

L. Weber, Plant Manager

G. White, Michigan Public Service Commission

L. Brandon, Michigan Department of Environmental Quality -

Waste and Hazardous Materials Division

Emergency Management Division

MI Department of State Police

D. Lochbaum, Union of Concerned Scientists

DOCUMENT NAME: E:\\Filenet\\ML053140325.wpd

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy

OFFICE

RIII

E RIII

RIII

RIII

NAME

GHausman:jb

CLipa

JLara

DATE

10/31/05

10/31/05

10/31/05

OFFICIAL RECORD COPY

M. Nazar

-3-

ADAMS Distribution:

HKN

DWS

RidsNrrDipmIipb

GEG

KGO

BJK1

CAA1

C. Pederson, DRS (hard copy - IRs only)

DRPIII

DRSIII

PLB1

JRK1

ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)

FIRE PROTECTION INSPECTION DOCUMENT REQUEST

INITIAL REQUEST

Enclosure

1

Inspection Report: 05000315/2006002(DRS); 05000316/2006002(DRS)

Inspection Dates:

January 11 - 13, 2006 (Information Gathering Visit)

January 23 - 27, 2006 (On-site Inspection Activity)

February 6 - 10, 2006

(On-site Inspection Activity)

Inspection Procedures:

IP 71111.05T, Fire Protection (Triennial)

IP 71152, "Identification and Resolution of Problems"

Inspectors:

Lead Inspector:

George M. Hausman

Team Members:

Audrey L. Klett

Mohammad Munir

I.

Information Requested Prior to the Information Gathering Visit

The following information is requested by December 16, 2005. If you have any questions

regarding this information, please call the lead inspector as soon as possible. All information

may be sent electronically (to Mr. George M. Hausman, e-mail address gmh1@nrc.gov) or

provided on compact disc (preferred method).

(1)

The reactor plant's Individual Plant Examination for External Events (IPEEE) for fire,

results of any post-IPEEE reviews for fire, and listings of actions taken and/or plant

modifications conducted in response to IPEEE information for fire. Alternatively,

probabilistic risk analyses for fire and associated information, if it exists and is more

recent than the IPEEE.

(2)

A list of fire areas requiring alternative shutdown capability, i.e., those areas for which

10 CFR Part 50, Appendix R, Section III.G requirements are satisfied under

Section III.G.3.

II.

Information Requested During the Information Gathering Visit

(January 11 - 13, 2006)

This information is requested to be available on-site during the information gathering visit.

(1)

The current version of the Fire Protection Program and Fire Hazards Analysis.

(2)

Listing of plant fire protection licensing basis documents.

FIRE PROTECTION INSPECTION DOCUMENT REQUEST

INITIAL REQUEST

Enclosure

2

(3)

Copies of the NRC Safety Evaluation Reports (SERs) and of the 50.59 reviews which

form the licensing basis for the reactor plant's post-fire safe shutdown configuration.

(4)

A list of Generic Letter 86-10 evaluations.

(5)

A list of applicable codes and standards related to the design of plant fire protection

features. The list should include National Fire Protection Association (NFPA) code

versions committed to (i.e., the NFPA codes of record).

(6)

A list of plant deviations from code commitments.

(7)

Post-fire safe shutdown analyses, including post-fire safe shutdown systems and

separation analysis.

(8)

Piping and instrumentation (flow) diagrams showing the components used to achieve

and maintain hot standby and cold shutdown for fires outside the control room and those

components used for those areas requiring alternative shutdown capability.

(9)

Plant layout and equipment drawings which identify the physical plant locations of hot

standby and cold shutdown equipment for selected fire zones/areas (to be determined

during information gathering visit).

(10)

Plant layout drawings which identify plant fire area delineation, areas protected by

automatic fire suppression and detection, and the locations of fire protection equipment

for selected fire zones/areas (to be determined during information gathering visit).

(11)

Listing of open and closed fire protection condition reports (i.e., problem identification

forms and their resolution reports) for the past three years.

(12)

Listing of fire impairments for the previous year.

(13)

Pre-fire plans for selected fire zones/areas (to be determined during information

gathering visit).

(14)

Plant operating procedures which would be used and describe shutdown for a

postulated fire in selected fire zones/areas (to be determined during information

gathering visit).

(15)

A listing of the protection methodologies identified under 10 CFR Part 50, Appendix R,

Section III.G used to achieve compliance for selected fire zones/areas (to be

determined during information gathering visit). That is, please specify whether 3-hour

rated fire barriers (Section III.G.2.a), 20-foot separation along with detection and

suppression (Section III.G.2.b), 1-hour rated fire barriers with detection and suppression

(Section III.G.2.c), or alternative shutdown capability (Section III.G.3) is used for each

selected fire zone/area.

FIRE PROTECTION INSPECTION DOCUMENT REQUEST

INITIAL REQUEST

Enclosure

3

(16)

One-line schematic drawings of the electrical distribution system for 4160 Volts -

alternating current (Vac) down to 480 Vac.

(17)

One-line schematic drawings of the electrical distribution system for 250 Volts - direct

current (Vdc) and 125 Vdc systems as applicable.

(18)

A listing of abbreviations and/or designators for plant systems.

(19)

Organization charts of site personnel down to the level of fire protection staff personnel.

(20)

A phone list for on-site licensee personnel.

In addition, during the information gathering visit, it is requested that licensee staff be available

for the following:

(21)

Informal discussion on plant procedures operators would use in the event of fire and

under what conditions would the plant be shutdown using alternative shutdown

methodology.

(22)

Informal discussion on the plants safe shutdown cable routing database and the

plant-wide cable routing database, as applicable.

(23)

A tour of alternative shutdown and risk significant fire areas.

III.

Information Requested to be Available on First Day of Inspection

(January 23, 2006)

(1)

List of the fire protection program implementing procedures (e.g., administrative

controls, surveillance testing, fire brigade).

(2)

List of maintenance and surveillance testing procedures for alternative shutdown

capability and fire barriers, detectors, pumps and suppression systems.

(3)

List of maintenance procedures which routinely verify fuse breaker coordination in

accordance with the post-fire safe shutdown coordination analysis.

(4)

List of procedures and/or instructions that control the configuration of the reactor plant's

fire protection program, features, and post-fire safe shutdown methodology and system

design.

(5)

List of procedures and/or instructions that govern the implementation of plant

modifications, maintenance, and special operations, and their impact on fire protection.

FIRE PROTECTION INSPECTION DOCUMENT REQUEST

INITIAL REQUEST

Enclosure

4

(6)

Coordination calculations and/or justifications that verify fuse/breaker coordination for

selected fire zones/areas (to be determined during information gathering visit) that are

fed off of the same electrical buses as components in the protected safe shutdown train.

(7)

Copies of significant fire protection and post-fire safe shutdown related design change

package descriptions (including their associated 10 CFR Part 50.59 evaluations) and

Generic Letter (GL) 86-10 evaluations.

(8)

Gaseous suppression system pre-operational testing, if applicable, for selected fire

zones/areas (to be determined during information gathering visit).

(9)

Hydraulic calculations and supporting test data which demonstrate operability for water

suppression systems, if applicable, for selected fire zones/areas (to be determined

during information gathering visit).

(10)

Alternating current (ac) coordination calculations for 4160 Vac down to 480 Vac

electrical systems.

(11)

The three most recent fire protection Quality Assurance (QA) audits and/or fire

protection self-assessments.

(12)

Corrective action documents (e.g., condition reports, including status of corrective

actions) generated as a result of the three most recent fire protection Quality

Assurance (QA) audits and/or fire protection self-assessments.

IV.

Information Requested to Be Provided Throughout the Inspection

(1)

Copies of any corrective action documents generated as a result of the teams questions

or queries during this inspection.

(2)

Copies of the list of questions submitted by the team members and the status/resolution

of the information requested (provide daily during the inspection to each team member).