November 3, 2005 Mr. Paul A. Harden Site Vice President Nuclear Management Company, LLC Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530
SUBJECT:
INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM IDENTIFICATION AND RESOLUTION (PI&R) INSPECTION AT PALISADES
Dear Mr. Harden:
This letter is to request information to support our biennial PI&R inspection beginning January 23, 2006, at the Palisades Nuclear Power Station. This is the biennial inspection performed in accordance with the NRC baseline Inspection Procedure 71152.
Experience has shown that these inspections are extremely resource intensive both for the NRC inspectors and the utility staff. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents required for the inspection.
The documents requested are copies of performance reports and lists of information, necessary to ensure the inspection team is adequately prepared for the inspection. The information may be provided in either CD-ROM or hard copy format and should be ready for NRC review by January 10, 2006. Mr. Robert Lerch, the Lead Inspector, will contact you to determine the best method of providing the requested information.
If there are any questions about the material requested, or the inspection in general, please do not hesitate to call Mr. Lerch at 630-829-9759.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public
P. Harden Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Christine Lipa, Chief Branch 4 Division of Reactor Projects Docket No. 50-255 License Nos. DPR-20
Enclosure:
Requested Information to Support PI&R Inspection cc w/encl:
J. Cowan, Executive Vice President and Chief Nuclear Officer R. Fenech, Senior Vice President, Nuclear Fossil and Hydro Operations D. Cooper, Senior Vice President - Group Operations L. Lahti, Manager, Regulatory Affairs J. Rogoff, Vice President, Counsel and Secretary A. Udrys, Esquire, Consumers Energy Company S. Wawro, Director of Nuclear Assets, Consumers Energy Company Supervisor, Covert Township Office of the Governor L. Brandon, Michigan Department of Environmental Quality -
Waste and Hazardous Materials Division Michigan Department of Attorney General
DOCUMENT NAME: E:\\Filenet\\ML053080332.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII NAME RLerch:dtp CLipa DATE 11/03/05 11/03/05 OFFICIAL RECORD COPY
P. Harden ADAMS Distribution:
HKN LMP RidsNrrDipmIipb GEG KGO JAL3 JAE CAA1 C. Pederson, DRS (hard copy - IRs only)
DRPIII DRSIII PLB1 JRK1 ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)
Requested Information to Support Problem Identification and Resolution (PI&R)
Inspection 1.
A copy of administrative procedure(s) for the corrective action process, trending program, quality assurance audit program, self-assessment program, corrective action effectiveness review program, and industry experience review program.
2.
A copy of Quality Assurance (QA) audits and/or self-assessments of the corrective action program completed since January 2004.
3.
Have a copy of the QA manual available.
4.
A copy of the Employee Concerns Program/Ombudsman administrative procedure.
5.
A list of QA audits completed since January 2004 with brief description of areas where findings were identified.
6.
A list of self-assessments completed since January 2004.
7.
A list of root cause evaluations completed since January 2004.
8.
A list of test failures (In-service Test [IST] or Technical Specification surveillances) since January 2004, with a brief description of component/system which failed.
9.
A list of condition reports closed since January 2004 sorted by significance level.
Include a description, significance category, date initiated, date closed, and whether there is an associated operability evaluation.
10.
A list of all open condition reports sorted by significance level. Include a description of the issue and the significance category.
11.
A list of condition reports initiated since January 2004 that involve inadequate or ineffective corrective actions. Include a brief description, status, and significance category of the issue.
12.
A list of condition reports initiated since January 2004 that identify trends of conditions adverse to quality. Include a brief description, status, and significance category for each item.
13.
A copy of any performance indicator reports used to track the corrective action program effectiveness for the last two years.
14.
A list of condition reports issued during the past three refueling outages sorted by system and component, including a brief description, status, and significant category for each item.
15.
Copies of corrective actions taken for issues identified in NRC findings since January 2004.
16.
A list of corrective action program routine meeting times and places.
17.
A list of top 10 risk significant systems and top 10 risk significant components.
18.
Description of changes made to the corrective action program since the last PI & R inspection.
19.
Site organizational chart.