Docket Number 50-346 License Number NPF-3 Serial Number 1-885 June 26, 1989 United States Nuclear Regulatory Commission Document Control Desk Washington, D. C.
20555 TOLEDO EDISON n-EnrgvComp.u DONALO C SHELTON V I -
l419) 249-2300
Subject:
Revised Response to Generic Letter 88-05, Boric Acid Corrosion o Carbon Steel Reactor Pressure Boundary Components in Pressurized Water Reactor (PWR) Plants (TAC Number 68915)
Gentlemen:
Pursuant to 10CFR50.54(f), Toledo Edison provided response to Generic Letter 88-05, Boric Acid Corrosion of Carbon Steel Reactor Pressure Boundary Components in PUR Plants on May 27, 1988, (Serial Number 1527). On page 2 of the attachment to the response, paragraph D stated the following:
D.
Control Rod Drive (0)
Flanges - The CRD flanges are currently inspected for leakage each refueling outage as a corrective maintenance.
indication of leakage.
Preventative Maintenance (PM) Program as a refueling outage PM.
Currently, gaskets are replaced on joints which have This work is incorporated into the Toledo Edison has identified that the last sentence should read as follows:
This work is "to be" incorporated into the Preventive Maintenance (PM)
Program as a refueling outage PM.
The work in paragraph D has not been incorporated into the PM Program at this time, however, the flanges have been inspected each refueling outage since April 1982. Toledo Edison is currently developing a PM Program that will be implemented by June 1989.
Subsequent to the Generic Letter response, Toledo Edison has determined that the process for identifying boric acid corrosion needs additional enhancements. This determination has been documented in Toledo Edison Potential Conditions Adverse to Quality Report (PCAQR) 89-0058, initiated on January 27, 1989.
chartered to improve the boric acid corrosion control process.
this task force is egpected to combine all applicable aspects of the various Toledo Edison has appointed a task force specifically The outcome of THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652
.j.,. h j < ; 4 p J ; ;
I' Docket Number 50-346 License Number NPP-3 Serial Number 1-885 Page 2 programs described in Toledo Edison's May 27, 1988, response into a specific Boric Acid Corrosion Program.
Boric Acid Corrosion Program has been developed. The overall program is planned to be implemented by September 1989. This program will satisfactorily implement the requirements of Generic Letter 88-05.
A draft procedure for implementation of the On June 1, 1989, Toledo Edison held a conference call with the Nuclear Regulatory Commission (NRC) to discuss the program enhancements described above. The Company identified that i t would support an audit as scheduled OR June 14 - 15, 1989, but felt that deferral of such an audit until completion of the programmatic enhancements was preferable.
NRC notified Toledo Edison that the June audit would be deferred to September 1989 but due to contract and budget restraints further deferral would not be possible. Toledo Edison will support the September audit.
Subsequent to that call, the If you have any questions concerning this matter, please contact Hr. R. W. Schrauder, Nuclear Licensing Manager, at (419) 249-2366.
Very truly yours, RTH/dlm cc:
P. M. Byron, DB-1 NRC Senior Resident Inspector A. B. Davis, Regional Administrator, NRC Region I11 T. V. Wambach, DB-1 NRC Senior Project Manager