Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors,
ML053060208
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 11/07/2005
From: Stang J
NRC/NRR/ADRO/DORL/LPLE
To: Gaffney M
Dominion Energy Kewaunee
stang J, NRR/DLPM, 415-1345
References
TAC MC3486
Download: ML053060208 (4)


Text

November 7, 2005 Mr. Michael G. Gaffney Site Vice President Kewaunee Power Station Dominion Energy Kewaunee, Inc.

N490 Highway 42 Kewaunee, WI 54216-9511

SUBJECT:

KEWAUNEE POWER STATION - RESPONSE FOR BULLETIN 2004-01, INSPECTION OF ALLOY 82/182/600 MATERIALS USED IN THE FABRICATION OF PRESSURIZER PENETRATIONS AND STEAM SPACE PIPING CONNECTIONS AT PRESSURIZED-WATER REACTORS, (TAC NO. MC3486)

Dear Mr. Gaffney:

On May 28, 2004, the U.S. Nuclear Regulatory Commission (NRC) issued Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors, to the industry. This Bulletin informed addressees that current methods of inspecting the pressurizer penetrations and steam space piping connections fabricated from Alloy 82/182/600 materials may need to be supplemented with additional measures (e.g., bare-metal visual inspections) to detect pressurizer penetration and steam space piping connection flaws or leakage. The Bulletin requested that these addressees provide the NRC with information related to the materials of construction, the inspections that have been performed, and the inspections which will be performed to verify the integrity of the pressurizer penetrations and steam space piping connections. By letter dated July 26, 2004, you provided your response to Bulletin 2004-01, for the Kewaunee Power Station (Kewaunee).

By this letter, you provided your responses to items 1a, 1b, 1c, and 1d of the Bulletin. These responses described the materials used in the fabrication of pressurizer penetrations and steam space piping connections at Kewaunee. When describing the materials used in the fabrication of the pressurizer penetrations and steam space piping connections, you reported that none of the materials used in the fabrication of the pressurizer penetrations and steam space piping were Alloy 82/182/600 materials. Therefore, there is no specific inspection program for Alloy 82/182/600 materials for the pressurizer other than meeting the requirements of Section XI of the American Society for Mechanical Engineers, Boiler and Pressure Vessel Code.

Given your response to items 1a, 1b, 1c, and 1d of the Bulletin, the NRC staff no longer requires a specific response for Kewaunee for item 2 of the Bulletin, which requested that licensees report the results of their next scheduled inspection of Alloy 82/182/600 pressurizer penetrations and steam space piping connections.

M. Gaffney The NRC staff has completed its activities associated with the review of your response to Bulletin 2004-01 and finds your response acceptable. Please contact me at (301) 415-1345 if you have any questions on this issue.

Sincerely,

/RA/

John F. Stang, Project Manager Plant Licensing Branch E Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-305 cc: See next page

M. Gaffney The NRC staff has completed its activities associated with the review of your response to Bulletin 2004-01 and finds your response acceptable. Please contact me at (301) 415-1345 if you have any questions on this issue.

Sincerely,

/RA/

John F. Stang, Project Manager Plant Licensing Branch E Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-305 cc: See next page DISTRIBUTION:

MMitchell JStang PUBLIC EAndruszkiewicz LPLE R/F ACRS OGC GGrant, RIII TColburn THarris ADAMS Accession Number: ML053060208 OFFICE NRR/LPLE/PM NRR/LPLE/LA NRR/LPLE/BC NAME JStang THarris LRaghavan DATE 11/4/05 11/4/05 11/7/05 OFFICIAL RECORD COPY

Kewaunee Power Station cc:

Resident Inspectors Office Ms. Lillian M. Cuoco, Esq.

U.S. Nuclear Regulatory Commission Senior Counsel N490 Hwy 42 Dominion Resources Services, Inc.

Kewaunee, WI 54216-9510 Millstone Power Station Building 475, 5th Floor Regional Administrator Rope Ferry Road Region III Waterford, CT 06385 U.S. Nuclear Regulatory Commission 801 Warrenville Road Plant Manager Lisle, IL 60532-4351 Kewaunee Power Station N490 Highway 42 David Zellner Kewaunee, WI 54216-9511 Chairman - Town of Carlton N2164 County B Kewaunee, WI 54216 Mr. Jeffery Kitsembel Electric Division Public Service Commission of Wisconsin PO Box 7854 Madison, WI 53707-7854 Mr. Michael G. Gaffney Dominion Energy Kewaunee, Inc.

Kewaunee Power Station N490 Hjghway 42 Kewaunee, WI 54216 Mr. Chris L. Funderburk Director, Nuclear Licensing and Operations Support Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Mr. Thomas L. Breene Dominon Energy Kewaunee, Inc.

Kewaunee Power Station N490 Hjghway 42 Kewaunee, WI 54216