ES-201-1, Examination Preparation Checklist, for the Prairie Island Initial Examination - August 2005
ML053010335
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 08/08/2005
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Nuclear Management Co
References
50-282/05-301, 50-306/05-301
Download: ML053010335 (1)


Text

ES-201, Rev. 9E Examination Preparation Checklist Form ES-201-1 Facility: PRAIRIE ISLAND Date of Examination: August 08, 2005 Examinations Developed by: Facility / NRC (circle one)

Target Chief Date* Task Description (Reference) Examiners Initials

-180 1. Examination administration date confirmed (C.1.a; C.2.a and b) hp

-120 2. NRC examiners and facility contact assigned (C.1.d; C.2.e) hp

-120 3. Facility contact briefed on security and other requirements (C.2.c) hp

-120 4. Corporate notification letter sent (C.2.d) hp

[-90] [5. Reference material due (C.1.e; C.3.c; Attachment 2)] n/a

{-75} 6. Integrated examination outline(s) due, including Forms ES-201-2, ES-201-3, ES-301-1, ES-301-2, ES-301-5, ES-D-1's, ES-401-1/2, ES-401-3, and drm ES-401-4, as applicable (C.1.e and f; C.3.d)

{-70} {7. Examination outline(s) reviewed by NRC and feedback provided to facility drm licensee (C.2.h; C.3.e)}

{-45} 8. Proposed examinations (including written, walk-through JPMs, and scenarios, as applicable), supporting documentation (including Forms drm ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6), and reference materials due (C.1.e, f, g and h; C.3.d)

-30 9. Preliminary license applications (NRC Form 398's) due (C.1.l; C.2.g; drm ES-202)

-14 10. Final license applications due and Form ES-201-4 prepared (C.1.l; C.2.i; drm ES-202)

-14 11. Examination approved by NRC supervisor for facility licensee review drm (C.2.h; C.3.f)

-14 12. Examinations reviewed with facility licensee (C.1.j; C.2.f and h; C.3.g) drm

-7 13. Written examinations and operating tests approved by NRC supervisor drm (C.2.i; C.3.h)

-7 14. Final applications reviewed; 1 or 2 (if >10) applications audited to confirm qualifications / eligibility; and examination approval and waiver letters sent drm (C.2.i; Attachment 4; ES-202, C.2.e; ES-204)

-7 15. Proctoring/written exam administration guidelines reviewed drm with facility licensee (C.3.k)

-7 16. Approved scenarios, job performance measures, and questions drm distributed to NRC examiners (C.3.i)

  • Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.

[Applies only] {Does not apply} to examinations prepared by the NRC.