ML053010021
| ML053010021 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah (DPR-077, DPR-079) |
| Issue date: | 10/24/2005 |
| From: | Pace P Tennessee Valley Authority |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| TAC MC7164, TAC MC7165 | |
| Download: ML053010021 (2) | |
Text
SAFEGUARDS INFORMATION a
Tennessee Valley Authority, Post Office Box 2000, Soddy-Daisy, Tennessee 37384-2000 October 24, 2005 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, DC 20555 Gentlemen:
In the Matter of Tennessee Valley Authority
)
Docket Nos. 50-327 50-328 SEQUOYAH NUCLEAR PLANT (SQN)
RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION REGARDING THE FEBRUARY 2002, ORDER SECTION B.5.b., FOR SEQUOYAH NUCLEAR PLANT, 'UNITS 1 AND 2 (TAC NOS. MC7164 AND MC7165)
The purpose of this letter is to provide TVA's response to the NRC's Request for Additional Information (RAI) dated September 12, 2005, concerning Section B.5.b of the Order for Interim Compensatory Measures issued in February 2002.
The RAI questions were received by electronic mail (e-mail) and discussed with NRC in a teleconference call on September 7, 2005.
The enclosure provides TVA's responses to the RAI.
There are no regulatory commitments associated with this submittal.
If you have any questions about this response, please contact me at (423) 843-7170 or J. D. Smith at (423) 843-6672.
NOTE: WHEN SEPARATED FROM THE ATTACHED THIS PAGE IS "DECONTROLLED.
Toof SAFEGUARDS INFORMATION PrOted on recy ed paper
SAFEGUARDS INFORMATION U.S. Nuclear Regulatory Commission Page 2 October 24, 2005 I declare under penalty of perjury that the foregoing is true and correct.
Executed on this 24th day of October 2005.
Sincerely-C P. L. Pace Manager, Site Licensing and Industry Affairs Enclosure NOTE: WHEN SEPARATED FROM THE ATTACHED TIS PAGE IS "DECONTROLLED.
SAFEGUARDS INFORMATION