Text
-
FENOC FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant 10 Center Road Perry, Ohio 44081 Richard Anderson Vice President-Nuclear October 14, 2005 PY-CEINRR-2914L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power -Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:
Attached is the September 2005 Monthly Operating Report for Perry Unit 1. Page I is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted per Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."
Operational data for the fourth quarter of 2005 and subsequent quarters will be provided via an industry database, in accordance with Operating License Amendment No.136.
If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.
Very truly yours, Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector 440-280-5579 Fax: 440-280-8029
~ ~~
7
,~9(5-0~4
0 OPERATING DATA REPORT UNIT:
Perry DATE:
10/10/05 1.
2.
3.
4.
5.
6.
7.
Docket: 50-440 Unit Name: Perry Nuclear Power Plant Reporting Period: September 2005 Utility
Contact:
T. Phelps Telephone: 440-280-7660 Design Electrical Rating (Net MWe):
Maximum Dependable Capacity (Net MWe):
1260 1235 8.
9.
10.
11.
Hours Reactor was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWeH)
This Month 720.0 720.0 0.0 890 8920 Yr-to-Date 4.259.9 4.154.5 0.0 4.91 3.R72.
Cumulative _
124.929.3 122.045.8 0.0 140.269.629.0
.v,
.v ev Page 1
i.4 UNIT SHUTDOWNS j REPORT MONTH - SEPTEMBER 2005 DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 10/10/05 CONTACT: T. Phelis TELEPHONE: (440) 280-7660 No.
Date Type Duration Reason Method Cause and Corrective Acion to Prevent Recurrence Hours 23
SUMMARY
- The Perry Nuclear Power Plant was on line the entire month of September, 2005.
- 1. TYPE:
F: Forced S: Scheduled
- 2. REASON:
f A - Equipment Failure (explain)
B - Maintenance or Testl C - Refueling D - Regulatory E - Operating Training &
License Examination F - Administrative G - Operational Error (explain)
H -Other (explain)
- 3. METHOD:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4-Continuation 5 - Other I
II i
I III Page 2