October 19, 2005 10 CFR 50.55a U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop: OWFN P1-35 Washington, D.C. 20555-0001 Gentlemen:

In the Matter of )

Docket No. 50-296 Tennessee Valley Authority )

BROWNS FERRY NUCLEAR PLANT (BFN) - UNIT 3 - AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) SECTION XI, INSERVICE INSPECTION PROGRAM FOR THE THIRD TEN-YEAR INSPECTION INTERVAL This letter submits the Third Ten-Year Inservice Inspection (ISI) Program for Unit 3 of the Browns Ferry Nuclear Plant.

The Code of record for the Third Ten-Year Interval ISI Program is the 2001 Edition, 2003 Addenda of the ASME Boiler and Pressure Vessel Code,Section XI. The third Ten-Year Interval ISI commences on November 19, 2005.

The applicable regulation, 10 CFR 50.55a(g), requires that ISI examinations for ASME Code Class 1, 2, and 3 components of a water-cooled nuclear facility meet the ISI requirements of ASME Section XI. In addition, 10 CFR 50.55a(g)(4)(ii) requires that the ISI Program be updated every 120 months to the latest NRC approved Edition and Addenda of Section XI, which is in effect 12 months prior to the start of the next 120-month inspection interval. The enclosed program update satisfies that requirement.

The enclosure to this letter contains the updated BFN Unit 3 ASME Section XI ISI Program for the third Ten-Year inspection interval, which conforms to the 2001 Edition, 2003 Addenda of the ASME Section XI Code. In addition, TVA has incorporated Risk-Informed ISI into the program. TVA submitted its

U.S. Nuclear Regulatory Commission Page 2 October 19, 2005 Risk-Informed ISI program and methodology for the Second Ten-Year ISI Interval to NRC by letters dated April 23, October 25, November 10, 1999, and January 18, 2000. NRC approved the BFN Unit 3 RI-ISI program by letter dated February 11, 2000.

There are seven requests for relief submitted for staff review and approval with this program update. Six of the seven were reviewed and approved by NRC for use in the Unit 3 Second Ten-Year ASME Section XI inspection interval. The other request for relief, 3-ISI-21 is new and relates to the BFN Risk-Informed ISI program. One other request for relief, 3-ISI-1 (reactor pressure vessel circumferential weld examinations) which was approved by NRC for the remaining term of operation under the existing license (July 2, 2016), is being carried forward in the Third Ten-Year ISI inspection program and is included for completeness. TVA anticipates that other ISI requests for relief will be necessary during the BFN Unit 3 Third Ten-Year ISI interval. These relief requests would involve TVAs inability to obtain the specified examination coverage (greater than 90 percent) as a result of weld geometry or interferences.

These relief requests will be submitted following the performance of the examinations when the specific examination coverage percentage has been determined.

There are no new commitments contained in this letter. If you have any questions, please contact me at (256) 729-2636.

Sincerely, Original signed by:

William D. Crouch Manager of Licensing and Industry Affairs Enclosure cc: See Page 3

U.S. Nuclear Regulatory Commission Page 3 October 19, 2005 cc (Enclosure):

Mr. Stephen J. Cahill, Branch Chief U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 Ms. Eva A. Brown, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North (MS 08G9) 11555 Rockville Pike Rockville, Maryland 20852-2739 Ms. Margaret Chernoff, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North (MS 08G9) 11555 Rockville Pike Rockville, Maryland 20852-2739

U.S. Nuclear Regulatory Commission Page 4 October 19, 2005 DTL:JWD:BAB Enclosure cc (Enclosure): w/o enclosure B. M. Aukland, POB 2C-BFN A. S. Bhatnagar, LP 6A-C Samuel Flood, CMB 1B-BFN (w/enclosure)

J. C. Fornicola, LP 6A-C R. G. Jones, NAB 1A-BFN R. F. Marks, PAB 1A-BFN G. W. Morris, BR 4X-C N. M. Moon, LP 6A-C B. J. OGrady, PAB 1E-BFN J. R. Rupert, NAB 1A-BFN K. W. Singer, LP 6A-C E. J. Vigluicci, ET 11A-K NSRB Support, LP 5M-C (w/enclosure)

EDMS, WT 3B-K (w/enclosure) s:\\lic\\submit\\subs\\U3ASMEISI3rdInt.doc

ENCLOSURE TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

UNIT 3 AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)

SECTION XI, INSERVICE INSPECTION (ISI) PROGRAM SUBMITTAL OF THIRD TEN-YEAR INSPECTION INTERVAL PROGRAM (SEE ATTACHED)