Implementation of Improved Technical Specifications
ML052920465
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/07/2005
From: Fadel D
Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP:NRC:5901-07
Download: ML052920465 (2)


Text

Z i Indiana Michigan Power INDIANA i Cook Nuclear Plant MICHIGAt.i One Cook Place Bridgman,Ml 49106 POWERe AERcom

-- - unit oAmerican Electric Power October 7, 2005 AEP:NRC:5901-07 Docket Nos.: 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop O-PI-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant, Units 1 and 2 IMPLEMENTATION OF IMPROVED TECHNICAL SPECIFICATIONS

Reference:

Letter from J. Donolhew, Nuclear Regulatory Commission, to M. K. Nazar, Indiana Michigan Power Company, "D. C. Cook Nuclear Plant, Units 1 and 2 - Issuance of Amendments for the Conversion to the Improved Technical Specifications with Beyond Scope Issues (TAC Nos. MC2629, MC2630, MC2653 through MC2687, MC2690 through MC2695, MC3152 through MC3157, MC3432 through MC3453)," dated June 1, 2005 (Accession Number ML050620034).

Dear Sir or Madam:

By the referenced letter, the U. S. Nuclear Regulatory Commission (NRC) issued Amendment Nos. 287 and 269 to Donald C. Cook Nuclear Plant (CNP) Unit 1 and Unit 2 Facility Operating License Nos. DPR-58 and DPR-74, respectively. These amendments approved the CNP Unit 1 and Unit 2 improved Technical Specifications (ITS), and included an implementation date of no later than October 31, 2005. In the referenced letter, the NRC requested that Indiana Michigan Power Company submit a letter stating that the ITSs have been implemented within 14 days of the date of implementation. This letter is to inform the NRC Staff that the ITS were implemented on September 25, 2005 at CNP Unit 1 and Unit 2, including all amendments through CNP Unit 1 and Unit 2 Amendment Nos. 290 and 272, respectively.

This letter contains no commitments. If you have any questions or require additional information, please contact Mr. Michael K. Scarpello, Regulatory Affairs Supervisor, at (269) 466-2649.

Sincerely, Eaniel P. Pein ,\DD l Engineering Vice President GW/rdw

U. S. Nuclear Regulatory Commission AEP:NRC:5901-07 Page 2 C: T. H. Boyce, NRC Washington, DC J. L. Caldwell, NRC Region II]

K. D. Curry, Ft. Wayne AEP J. N. Donohew, NRC Washington, DC P. C. Heam, NRC Washington, DC J. T. King, MPSC MDEQ - WHMD/RPMWS NRC Resident Inspector D. W. Spaulding - NRC Washington, DC