ML052920247

From kanterella
Jump to navigation Jump to search
Notice of Forthcoming Meeting with Entergy Operations Inc. and Westinghouse on Waterford Steam Electric Station, Unit 3 Steam Generator Batwing Issues
ML052920247
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/18/2005
From: Kalyanam N
NRC/NRR/DLPM/LPD4
To: Terao D
NRC/NRR/DLPM/LPD4
Kalynanam Nageswaram, NRR/DLPM,415-1480
References
Download: ML052920247 (4)


Text

October 18, 2005 MEMORANDUM TO: David Terao, Chief, Section 1 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM:

N. Kalyanam, Project Manager, Section 1/RA/

Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation

SUBJECT:

NOTICE OF MEETING WITH ENTERGY OPERATIONS INC. AND WESTINGHOUSE ON WATERFORD STEAM ELECTRIC STATION, UNIT 3 STEAM GENERATOR BATWING ISSUES DATE AND TIME:

November 3, 2005 8:00 a.m. - 12:00 p.m.

LOCATION:

NRC Headquarters One White Flint North 11555 Rockville Pike Rockville, MD 20852, Room OWFN-9B4 PURPOSE:

A presentation that starts at the discovery of the problem of the broken batwings, extent of condition, root cause, and repairs and corrective actions (both short term, during the outage, and long term), and discussion on why there is reasonable assurance that the weld holding the broken batwings to the wrapper bar will not fail.

CATEGORY 1:

The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion but before the meeting is adjourned. Certain portions of this meeting will be closed to the public because the staff has determined that the information is proprietary in nature.

PARTICIPANTS:

Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR)

NRC Entergy/Westinghouse Allen Hiser,NRR D. Bryan Miller (Entergy)

Ken Karwoski, NRR Robert O'Quinn (Entergy)

Emmett Murphy, NRR Don Siska (Westinghouse)

David Terao, NRR Robert Keating (Westinghouse)

Docket No. 50-382 CONTACT:

N. Kalyanam, NRR M. Fields, NRR 301-415-1480 301-415-3062 nxk@nrc.gov twa@nrc.gov

  • Commissions Policy Statement on "Enhancing Public Participation in NRC Meetings,"

67 Federal Register 36920, May 28, 2002

ML052920247 NRR-101 DISTRIBUTION: See attached page OFFICE PDIV-1/PM PDIV-1/LA PDIV-1/SC NAME NKalyanam DBaxley DTerao DATE 10/18/05 10/18/05 10/18/05

DISTRIBUTION FOR FORTHCOMING MEETING WITH ENTERGY ON NOVEMBER 3, 2005 Dated: October 18, 2005 Hardcopy:

PUBLIC PDIV-1 Reading Receptionist OWFN/TWFN E-Mail:

RidsNrrAdpt (BSheron)

RidsNrrDlpm (TMarsh/CHolden)

RidsOpaMail RidsNrrDlpmLpdiv (HBerkow)

RidsNrrDlpmLpdiv1 (DTerao)

RidsNrrLADBaxley AHiser KKarwoski EMurphy RidsOgcRp RidsRgn4MailCenter (DGraves)

PMNS RidsAcrsAcnwMailCenter RidsNrrPMNKalyanam JDixon-Herrity BHenderson

May 2005 Waterford Steam Electric Station, Unit 3 cc:

Mr. Michael E. Henry, State Liaison Officer Department of Environmental Quality Permits Division P.O. Box 4313 Baton Rouge, Louisiana 70821-4313 Vice President Operations Support Entergy Operations, Inc.

P. O. Box 31995 Jackson, MS 39286-1995 Director Nuclear Safety Assurance Entergy Operations, Inc.

17265 River Road Killona, LA 70066-0751 Wise, Carter, Child & Caraway P. O. Box 651 Jackson, MS 39205 General Manager Plant Operations Waterford 3 SES Entergy Operations, Inc.

17265 River Road Killona, LA 70066-0751 Licensing Manager Entergy Operations, Inc.

17265 River Road Killona, LA 70066-0751 Winston & Strawn 1700 K Street, N.W.

Washington, DC 20006-3817 Resident Inspector/Waterford NPS P. O. Box 822 Killona, LA 70066-0751 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 Parish President Council St. Charles Parish P. O. Box 302 Hahnville, LA 70057 Executive Vice President

& Chief Operating Officer Entergy Operations, Inc.

P. O. Box 31995 Jackson, MS 39286-1995 Chairman Louisiana Public Services Commission P. O. Box 91154 Baton Rouge, LA 70825-1697 Mr. Joseph E. Venable Vice President Operations Entergy Operations, Inc.

17265 River Road Killona, LA 70066-0751