Response to Regulatory Issue Summary 2005-19, Preparation and Scheduling of Operator Licensing Examinations
ML052910369
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/14/2005
From: Bezilla M
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
3199, RIS-05-019
Download: ML052910369 (4)


Text

FENOC "5501 North State Route 2 FirstEnergy Nuclear Operating Company Oak Harbor, Ohio 43449 Mark B. Bezilla 419-321-7676 Vice President - Nuclear Fax: 419-321-7582 Docket Number 50-346 License Number NPF-3 Serial Number 3199 October 14, 2005 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001

Subject:

Response to Regulatory Issue Summary 2005-19, "Preparation and Scheduling of Operator Licensing Examinations" Ladies and Gentlemen:

The Davis-Besse Nuclear Power Station (DBNPS) is providing information in response to NRC Regulatory Issue Summary 2005-19, "Preparation and Scheduling of Operator Licensing Examinations," as requested. The attached NRC Form 536, Operator Licensing Examination Data, provides information through calendar year 2009 for Operator Licensing Examinations and through calendar year 2007 for the Generic Fundamentals Examination.

Should you have any questions or require additional information, please contact Mr. Mark A.

Trump, Site Training Manager, at (419) 321-8494.

Very truly yours, AWB Attachments cc:

Regional Administrator, NRC Region III DB-1 NRC/NRR Project Manager DB-I NRC Senior Resident Inspector Chief, Operations Branch, NRC Region III Utility Radiological Safety Board pCOc)3

Docket Number 50-346 License Number NPF-3 Serial Number 3199 Page I of I COMMITMENT LIST The following list identifies those actions committed to by the Davis-Besse Nuclear Power Station in this document. Any other actions discussed in the submittal represent intended or planned actions by Davis-Besse. They are described only as information and are not regulatory commitments. Please notify the Manager, Regulatory Compliance (419-321-8585), at Davis-Besse of any questions regarding this document or associated regulatory commitments.

COMMITMENTS DUE DATE None N/A

Docket Number 50-345 License Number NPF-3 Serial Number 3199 Form NRC - 536 Operator Licensing Examination Data (one form to follow)

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008

.8-2005)

Estimated burden per res onse to comply with this voluntary Information collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information collection Is used to plan budgets and resources for operator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S.

O L Nuclear Regulatory Commission, Washington, DC 20555-0001, or bntemet EXAMNATON ATAe-mail to Infocollects~nrc~gov. and to the Desk Officer. Office of Inlormation EXAMINATION DATA and Regulatory Affairs. NEOB-1 0202. (3150.0131). Office of Management and Budget, Washington. DC 20503.

If a means used to Impose an Information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the information collection.

FACILITY NRC REGION Davis-Besse Nuclear Power Station A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 06 CY 07 CY 08 CY 09 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 06 CY 07 CY 08 CY 09 NUMBER OF REACTOR 0

8 0

3 OPERATORS NUMBER OF SENIOR REACTOR 0

10 0

3 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR 0

3 0

3 OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0

0 0

0 OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 09/10/2007 07/1312009 ALTERNATE DATE 10/15/2007 08/17/2009 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 06 CY 07 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0

21 0

0 0

0 0

0 CANDIDATES NRC FORM 536 (8-2005)