ML052900410

From kanterella
Jump to navigation Jump to search
September 2005 Monthly Operating Report for Turkey Point Units 3 and 4
ML052900410
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/07/2005
From: Jones T
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2005-216
Download: ML052900410 (3)


Text

FPL OCT 0 7 2005 L-2005-216 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - September 2005 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the.September 2005, Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, Terry 0. Jones Vice President Turkey Point Plant RLE Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

\\,at-an FPL Group company

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-250 Turkey Point Unit 3 10/5/2005 Ronald Everett (305) 246-6190 Reporting Period September. 2005 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 1 693 Month 1--

No. of hours reactor was critical 720 No. of hours generator was on line (service hours) 720 6390.4 213466.2 Unit reserve shutdown hours 1

0 0

121.8 Net Electrical Energy (MWH)

J 506819 4481063 140019728 UNIT SHUTDOWNS No.

Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours)

(1)

Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A N/A (1) Reason A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/Ucense Examination F - Administrative G -Operational Error (Explain)

H -Other (2)

Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4-Continuation 5 - Other (Explain)

Summary Of Monthly Operatina Exnerience Unit 3 operated at essentially 100% power for the month of September.

4 m-DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-251 Turkey Point Unit 4 10/5/2005

. Ronald Everett (305) 246-6190 Reporting Period: September. 2005 Design Electrical Rating (MWe-Net)

Tl 720 Maximum Dependable Capacity (MWe-Net) l 693 Month No. of hours reactor was critical 720 4649.3 4509.22 212790.5 208150.52 No. of hours generator was on line (service hours) 720 Unit reserve shutdown hours 0

0 577.2 Net Electrical Energy (MWH) 507815 3024934 137625685 UNIT SHUTDOWNS No.

Date Type

.Duration Reason Method of Corrective Action! Comments F=Forced (hours)

(1)

Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other 1 - Manual 2-Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

Summarv Of Monthly Operating Experience Unit 4 operated at essentially 100% power for the month of September