FPL OCT 0 7 2005 L-2005-216 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - September 2005 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the.September 2005, Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.
Very truly yours, Terry 0. Jones Vice President Turkey Point Plant RLE Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.
\\,at-an FPL Group company
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-250 Turkey Point Unit 3 10/5/2005 Ronald Everett (305) 246-6190 Reporting Period September. 2005 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 1 693 Month 1--
No. of hours reactor was critical 720 No. of hours generator was on line (service hours) 720 6390.4 213466.2 Unit reserve shutdown hours 1
0 0
121.8 Net Electrical Energy (MWH)
J 506819 4481063 140019728 UNIT SHUTDOWNS No.
Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours)
(1)
Shutting S=Scheduled Down (2)
N/A N/A N/A N/A N/A N/A (1) Reason A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/Ucense Examination F - Administrative G -Operational Error (Explain)
H -Other (2)
Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4-Continuation 5 - Other (Explain)
Summary Of Monthly Operatina Exnerience Unit 3 operated at essentially 100% power for the month of September.
4 m-DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-251 Turkey Point Unit 4 10/5/2005
. Ronald Everett (305) 246-6190 Reporting Period: September. 2005 Design Electrical Rating (MWe-Net)
Tl 720 Maximum Dependable Capacity (MWe-Net) l 693 Month No. of hours reactor was critical 720 4649.3 4509.22 212790.5 208150.52 No. of hours generator was on line (service hours) 720 Unit reserve shutdown hours 0
0 577.2 Net Electrical Energy (MWH) 507815 3024934 137625685 UNIT SHUTDOWNS No.
Date Type
.Duration Reason Method of Corrective Action! Comments F=Forced (hours)
(1)
Shutting S=Scheduled Down (2)
N/A N/A N/A N/A N/A N/A (1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other 1 - Manual 2-Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
Summarv Of Monthly Operating Experience Unit 4 operated at essentially 100% power for the month of September