ML052900228
| ML052900228 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 10/14/2005 |
| From: | Daflucas R Entergy Nuclear Operations |
| To: | Richard Ennis Office of Nuclear Reactor Regulation |
| References | |
| Download: ML052900228 (2) | |
Text
a I Rick Ennis - DRAFT for discussion. on1v Page I1 I Rick Ennis - DRAFT for discussion. only Paae II From:
"Daflucas, Ronda" <rdafluc@entergy.com>
To:
"Rick Ennis" <RXE~nrc.gov>
Date:
10/14/05 12:33PM
Subject:
DRAFT for discussion, only Rick -
Following is a DRAFT proposed rewrite of "L: Transient testing" for discussion purposes:
During the [EPU]...[ENO] shall: (1) confirm through performance of transient testing that the loss of one condensate pump will not result in a complete loss of reactor feedwater. (2) Within 30 days at nominal full-power operation following successful performance of the test in (1) above, through performance of additional transient testing, or analysis of the results of the testing conducted in (1) above, confirm that the loss of one reactor feedwater pump will not result in a reactor trip.
- Thanks, Ronda
I cAtemPIGWI00001.TMP Page I I L_
c:tmXG1O0.TM Pag 1 Mail Envelope Properties (434FDDC4.279: 24: 12921)
Subject:
Creation Date:
From:
Created By:
DRAFT for discussion, only 10/14/05 12:32PM "Daflucas, Ronda" <rdaflucgentergy.com>
rdafluc(entergy.com Recipients nrc.gov owf4po.OWFNDO RXE (Rick Ennis)
Post Office oiNf4_o.OWFNDO Route nrc.gov Files MESSAGE TEXT.htm Mime.822 Options Expiration Date:
Priority:
Reply Requested:
Return Notification:
Concealed
Subject:
Security:
Size 613 2134 4621 Date & Time 10/14/05 12:32PM None Standard No None No Standard