Response to NRC Request for Additional Information on Guidance Regarding Mitigation Strategies
ML052870277
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/03/2005
From: Jensen J
Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP:NRC:2073-30
Download: ML052870277 (2)


Text

-

9 INDIANA Indiana Michigan Power INDIANeAd Cook Nuclear Plant MICHIGAN One Cook Place POWE2R0 Bridgman, Ml 49106 SAFEGUARDS INFORMATION AEP4com A unit of American Electric Powter October 3,2005 AEP:NRC:2073-30 10 CFR 50.4 Docket Nos.

50-315 50-316 U. S. Nuclear Regulatory Commission AITN: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001

SUBJECT:

Response to Nuclear Regulatory Commnission (NRC) Request for Additional Information on Guidance Regarding Mitigation Strategies By letter dated May 27, 2005, Indiana Michigan Power Company (I&M), the licensee for Donald C. Cook Nuclear Plant (CNP) Units 1 and 2, Facility Operating Licenses DPR-58 and DPR-74, responded to an NRC letter dated February 25, 2005, NRC Staff Guidance for Use in Achieving Satisfactory Compliance with February 25, 2002, Order Section B.5.b.

By PGP encrypted file via e-mail dated August 10, 2005, the NRC made a request for additional information (RAI) on I&M's response dated May 27, 2005. In the e-mail communication, the NRC requested that I&M discuss responses to the RAIs in a teleconference with the NRC.

A teleconference was conducted on September 2, 2005, between NRC staff and I&M staff to discuss l&M's responses to the RAIs.

During this teleconference, the NRC requested that I&M submit written RAI responses in a follow-up correspondence to the NRC. Attachment 1 to this letter provides I&M's written responses to the RAIs.

The commitments resulting from the response documented in Attachment 1 are listed in. The due date for commitment 3.c is based on similar activities related to a previous commitment made by I&M to revise the CNP Emergency Plan to include provisions for drills and exercises using terrorist-based-events, in response to NRC Bulletin 05-02 (ref; AEP:NRC:5054-12, dated August 15, 2005).

NOTE: ATTACHMENT 1 TO MS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF ATTACHMENT 1, THIS LEITER AND AITACHMENT 2 ARE "DECONTROLLED".

SAFEGUARDS INFORMATION

~1

U. S. Nuclear Regulatory Commission Page 2 AEP:NRC:2073-30 Should you have any questions, please contact Mr. John A. Zwolinski, Director of Safety Assurance, at (269) 466-2428.

Sincerely, 4gph N. Jensen Site Vice President Attachments HLE/jen c w/o Attachment 1:

J. L. Caldwell - NRC Region III K D. Curry - AEP Ft. Wayne J. E. Dyer - Office of Nuclear Reactor Regulation J. T. King - MPSC MDEQ-WHMD/HWRPS NRC Resident Inspector Records Center - INPO D. W. Spaulding - NRC Washington DC