ML052860428
| ML052860428 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 10/13/2005 |
| From: | Conte R Division of Reactor Safety I |
| To: | St.Pierre G Florida Power & Light Energy Seabrook |
| Shared Package | |
| ML052200399 | List: |
| References | |
| Download: ML052860428 (3) | |
Text
October 13, 2005 Mr. Gene F. St. Pierre Site Vice President FPL Energy Seabrook, LLC Seabrook Station P.O. Box 300 Seabrook, NH 03874
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION - SEABROOK STATION
Dear Mr. St. Pierre:
In a telephone conversation on October 12, 2005, Mr. John G. Caruso, Senior Examiner/Inspector and Mr. Ed Spader, Supervisor LORT Training, made arrangements for the NRC to inspect the licensed operator requalification program at the Seabrook Station facility.
The inspection is planned for the weeks of December 5 and 12, 2005, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: 1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; 2) an index or summary of condition reports written in the past two years on simulator performance problems; 3) an index or summary of simulator performance test results in the past two years; and 4) the examination schedule, sample plan, written examinations and operating test scheduled for the first week of the inspection to the NRC by November 21, 2005.
Mr. Spader has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018, which expires on June 30, 2006.
The public reporting burden for this collection of information is estimated to average four hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail at SLF@NRC.GOV, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, D.C. 20503.
Mr. Gene F. St. Pierre 2
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. John Caruso at (610) 337-5389.
Sincerely,
/RA/
Richard J. Conte, Chief Operations Branch Division of Reactor Safety Docket No. 50-443 License No. NPF-86 cc w/encl:
J. A. Stall, FPL Senior Vice President, Nuclear & CNO J. M. Peschel, Manager - Regulatory Programs M. Kiley, Plant General Manager - Seabrook Station J. Dent, Assistant Plant Manager R. S. Kundalkar, FPL Vice President - Nuclear Engineering D. G. Roy, Nuclear Training Manager - Seabrook Station Office of the Attorney General, Commonwealth of Massachusetts P. McLaughlin, Attorney General, State of New Hampshire P. Brann, Assistant Attorney General, State of Maine M. S. Ross, Attorney, Florida Power & Light Company R. Walker, Director, Dept. of Public Health, Commonwealth of Massachusetts B. Cheney, Director, Bureau of Emergency Management C. McCombs, Acting Director, MEMA Health Physicist, Office of Community & Public Health, State of New Hampshire Administrator, Bureau of Radiological Health, State of New Hampshire J. Roy, Director of Operations, Massachusetts Municipal Wholesale Electric Company T. Crimmins, Polestar Applied Technology R. Backus, Esquire, Backus, Meyer and Solomon, New Hampshire Town of Exeter Board of Selectmen S. Comley, Executive Director, We the People of the United States R. Shadis, New England Coalition Staff M. Metcalf, Seacoast Anti-Pollution League
Mr. Gene F. St. Pierre 3
Distribution w/encl:
S. Collins, RA M. Dapas, DRA A. Blough, DRS M. Gamberoni, DRS R. Conte, DRS J. Caruso, DRS C. Bixler, DRS P. Krohn, DRP G. Barber, DRP G. Dentel, DRP - Senior Resident Inspector S. Nelson, DRP - Resident OA S. Lee, RI OEDO D. Roberts, NRR V. Nerses, NRR, PM G. Wunder, NRR Region I Docket Room (with concurrences)
E:\\Filenet\\ML052860428.wpd ADAMS PKG: ML052200399 SISP Review: RJC After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CJBixler/CJB JGCaruso/JGC RJConte/RJC DATE 10/12/05 10/12/05 10/12/05 OFFICIAL RECORD COPY