Connecticut, Inc. (DNC) Millstone Power Station Units 2 and 3, Revision to Response to NRC Regulatory Issue Summary 2005-19, Preparation and Scheduling of Operator Licensing Examinations
ML052860240
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 10/13/2005
From: Funderburk C
Dominion, Dominion Nuclear Connecticut, Dominion Resources Services, Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
05-578A, RIS-05-019
Download: ML052860240 (3)


Text

October 13, 2005 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555-0001 h

Dominion Serial No.

05-578A NL&OS:vI h Docket Nos. 50-336/423 License Nos. DPR-65 N P F-49 DOMINION NUCLEAR CONNECTICUT, INC. (DNC)

MILLSTONE POWER STATION UNITS 2 AND 3 REVISION TO RESPONSE TO NRC REGULATORY ISSUE

SUMMARY

2005-19 PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS Dominion Resources Services, Inc. responded to NRC Regulatory Issue Summary 2005-19, in a letter, Serial No.05-578, dated October 3, 2005. This letter included generic fundamentals examinations (GFEs) information for Surry, North Anna, and Millstone Power Stations.

However, the information for Millstone Power Station included an error. The information listed in Section A for 2007 and 2008 on NRC Form 536 should have been in the column for the estimated number of licensee-prepared examinations instead of the estimated number of NRC-prepared examinations. Please find a corrected page attached for your replacement.

No new commitments are intended by this letter. If you have any questions or require additional information, please contact Mr. John Hayden at (804) 273-2707.

Very truly yours, C. L. Funderburk, Director Nuclear Licensing and Operations Support Dominion Resources Services, Inc. for Dominion Nuclear Connecticut, Inc. and Virginia Electric and Power Company Attach ment cc:

U. S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1 41 5

SN 05-578A: Rev. to Response to NRC RIS 2005-19 Docket Nos. 50-336/423 Page 2 of 3 cc:

Mr. V. Nerses NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North 1 1555 Rockville Pike Rockville, MD 20852 Mr. G. F. Wunder NRC Project Manager U. S. Nuclear Regulatory Commission One White Flint North 1 1555 Rockville Pike Rockville, MD 20852 Mr. S. M. Schneider NRC Senior Resident Inspector Millstone Power Station

NRC FORM 536 US. NUCLEAR REGULATORY COMMISSION (8-2005)

OPERATOR LICENSING EXAMINATION DATA FACILITY MILLSTONE POUER STATION - Units 2 and 3 APPROVED BY OMB: NO. 3150-0131 WPIRES: 08/31/2008 Estimated burden per response to comply with this voluntary informatior collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budget!

and resources for operator examinations. Send comments re arding burder estimate to the Records and FOlNPrivacy Services Branch 9-5 F53). U S Nuclear Re ulatory Commission, Washington, DC 20555-0001, or b interne e-mail to in?ocollects@nrc. ov, and to the Desk Officer, Office of lnkrmatior and Regulatory Affairs, NE8B-10202, (3150-0131), office of Management an(

Budget, Washington, DC 20503.

If a means used to impose an informatior collection does not display a currently valid, OMB control number, the NRC ma' not conduct or sponsor, and a person IS not required to respond to, thc information collection.

NRC REGION r I

PROPOSED NUMBER ESTIMATED NUMBER OF EXAMINATIONS ESTIMATED NUMBER OF EXAMINATIONS LICENSEE-PREPARED NRC-PREPARED CY 09 CY08 CY07 CY 06 1

1 I PROPOSEDNUMBER I NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR CY 06 2

(Unit 3) 2 CY 07 PROPOSED NUMBER ESTIMATED NUMBER OF CANDIDATES NUMBER OF REACTOR OPERATORS I

cy 06 cy 07 MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBE 10 8

(Unit 3)

I I

OPERATORS - UPGRADE I

(Unit 3)

I NUMBER OF SENIOR REACTOR I

OPERATORS - LIMITED I

I PROPOSEDDATES 1

PRIMARY DATE I

03/12/07 (Unit 3) 02/ 12/07 (Unit 3)

ALTERNATE DATE CY09 -

CY 08 8

(Unit 2) 2 (Unit 2) 2 (Unit 2)

- I 02/11/08 (Unit 2) 03/10/08 (Unit 2)

C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE 8A NRC FORM 536 (8-2005)