E-mail from N. Sheehan of USNRC to Kcosa@Reformer.Com, Regarding Vermont Yankee Editorial
ML052790277
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 03/30/2004
From: Neil Sheehan
NRC Region 1
To: Cosa K
Brattleboro Reformer
References
FOIA/PA-2004-0369
Download: ML052790277 (2)


Text

iFh 1a

- reemn akeeioilPg From:

Neil Sheehan o

X To:

INTERNET: KCosa@TheReformer.Com Date:

3/30/04 2:54PM

Subject:

re: Vermont Yankee editorial

Kate, I read the editorial you wrote for today's paper headlined 'Why bother." I'd like to respond to at least a few of the points you raised:

1.) The response to the Senators explained why the Maine Yankee Independent Safety Assessment (ISA) experience is not applicable to Vermont Yankee's power uprate application. However, the letter DOES NOT represent the agency's position on the Vermont Public Service Board's conditional approval of the Vermont Yankee uprate.

2.) The NRC continues to examine the board's conditional approval of the uprate. Our reply to the board's March 15th letter will come after the public meeting scheduled for tomorrow.

3.) Although our reply to the PSB has not yet been issued, areas of the agency's normal oversight and uprate review processes appear to coincide with the PSB's concerns, including:

A.) The NRC and independent contractors have Inspected Vermont Yankee's design and licensing basis several times since the Maine Yankee ISA, and Vermont Yankee passed those inspections.

B.) Although the NRC does not issue decisions on a plant's reliability for generating electricity, portions of the agency's Reactor Oversight Process assess a plant's criteria for minimizing system unavailability, and therefore provide some insight into reliability going forward.

C.) In August of this year, the NRC will conduct a biannual safety system design inspection at Vermont Yankee, requiring several inspectors to perform about 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br />' worth of direct inspection on one or two systems, as well as cross-cutting issues related to plant safety.

D.) The power uprate review process examines equipment modifications and maintenance necessary for the plant to handle increased power output. This review covers both safety-related and other plant systems.

E.) If any portion of the NRC's inspections and reviews identifies additional areas for examination, the agency is fully prepared to escalate its inspection activity as needed.

4.) Your second-to-last paragraph states that a public hearing "will" be scheduled at a later date, according to me. Again, a hearing will be only be scheduled if an individual(s) or group(s) file a petition to intervene in the proceeding and win that right by demonstrating standing and raising concerns that are found to have merit.

Please call if you need any further clarification. Otherwise, I hope to see you at the meetings tomorrow.

Neil Sheehan NRC Public Affairs (610) 337-5331 CC:

INTERNET: CLorie@TheReformer.Com 3/9

S :TEMI..

IlOOl.M

  • 1 Mail Envelope Properties (4069D064.45D: 9: 35118)

Page 1

Subject:

Creation Date:

From:

Created By:

re: Vermont Yankee editorial 3/30/04 2:54PM Neil Sheehan NAS @nrc.gov Recipients Action TheReformer.Com Transferred CLorie CC (INTERNET: CLorie@TheReformer.Co KCosa (INTERNET: KCosa@TheReformer.Com)

Date & Time 03/30/04 02:54PM Post Office TheReformer.Com Delivered Route 1NTERNET Files MESSAGE Options Auto Delete:

Expiration Date:

Notify Recipients:

Priority:

Reply Requested:

Return Notification:

Concealed

Subject:

Security:

To Be Delivered:

Status Tracking:

Size 3743 Date & Time 03/30/04 02:54PM No None Yes Standard No None No Standard Immediate All Information