I Neil Sh~eehan - Additional information re: VY power uprate application review
_Page 1 1 I Neil St'.eehan - Additional information re: VY power uprate application review PaQe I I From:
Neil Sheehan To:
INTERNET: THenry@Reformer.Com Date:
2/19/04 4:39PM
Subject:
Additional information re: VY power uprate application review
- Toby, Here's some additional information on the NRC's review of the Vermont Yankee power uprate application:
- It's expected about 4,000 NRC staff-hours will be devoted to the review.
- The NRC will conduct hundreds of hours on on-site inspections as part of the review.
- There will be a thorough review of all systems important to safety that would be impacted by the power uprate.
- Review areas will include: steam dryer integrity; flow-accelerated corrosion; environmental considerations; human performance and training; maintenance and testing; radiological consequences; containment building performance; fire protection; erosion/corrosion; civil engineering; mechanical engineering; chemical engineering; piping integrity; vessel and internals integrity; spent fuel pool; and instrumentation and controls.
- The review will include lessons learned from previous power uprates.
- The Advisory Committee on Reactor Safety, an independent body of 11 individuals with a wide range of engineering experience, will make recommendations to the Commission regarding the proposed power uprate.
Neil Public Affairs (610) 337-5331 yyw
I C:\\TEMP\\GW}00001.TMP i
Mail Envelope Properties (40352DIF.C2A: 9: 351 18)
Page 1 1
Subject:
Creation Date:
From:
Created By:
Additional information re: VY power uprate application review 2/19/04 4:39PM Neil Sheehan NAS @nrc.gov Recipients Reformer.Com THenry (INTERNET: THenrv@Reformer.Com)
Action Transferred Date & Time 02/19/04 04:39PM Post Office Reformer.Com Delivered Route INTERNET Files MESSAGE Options Auto Delete:
Expiration Date:
Notify Recipients:
Priority:
Reply Requested:
Return Notification:
Concealed
Subject:
Security:
To Be Delivered:
Status Tracking:
Size 2173 Date & Time 02/19/04 04:39PM No None Yes Standard No None No Standard Immediate All Information