ML052790128
ML052790128 | |
Person / Time | |
---|---|
Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
Issue date: | 08/31/2004 |
From: | Linda Larche Division Reactor Projects I |
To: | Anderson C, Blough A, Clifford J, Collins S, Conte R, Crlenjak R, Doerflein L, Richard Ennis, Florek D, Brian Holian, Lanning W, Ray Lorson, Matakas G, Chris Miller, David Pelton, Amanda Rancourt, Rogge J, Diane Screnci, Neil Sheehan, Travis Tate, Jason White, Wiggins J NRC Region 1 |
References | |
FOIA/PA-2004-0369 | |
Download: ML052790128 (9) | |
Text
[ILawrencbe Doerflein - 2004 Vermont Yankee Mid-Cycle Page 1 1 I Lawrence Doerflein 2004 Vermont Yankee Mid-Cycle
- Paae 1I From: Linda Larche I-To: A. Randolph Blough; Amanda Rancourt; Brian Holian; Chris Miller; Cliff Anderson; David Pelton; Diane Screnci; Donald Florek; Gina Matakas; James Clifford; James Wiggins; John Rogge; John White; Lawrence Doerflein; Neil Sheehan; Raymond Lorson; Richard Conte; Richard Crlenjak; Rick Ennis; RidsNrrDipmlipb; Samuel Collins; Travis Tate; Wayne Lanning Date: 8/31/04 5:44PM
Subject:
2004 Vermont Yankee Mid-Cycle Place: RidsNrrDipmlipb Attached is the 2004 Vermont Yankee Mid-Cycle Performance Review and Inspection Plan. You may also view the document in ADAMS under accession no. ML042440886.
Linda M. Larche, Branch Secretary, Region I Division of Reactor Projects (610) 337-5332 (610) 337-5349 (Fax) j\A
La[w~reneEDoerilein- 2004 Mid-Cycle Letter - VY.final.pdf Page 11 August 30 2004 Mr. Jay K. Thayer Site Vice President Entergy Nuclear Operations, Inc.
Vermont Yankee Nuclear Power Station P.O. Box 0500 185 Old Ferry Road Brattleboro, VT 05302-0500
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - VERMONT YANKEE NUCLEAR POWER STATION
Dear Mr. Thayer:
On August 4, 2004, the NRC staff completed Its mid-cycle plant performance assessment of the Vermont Yankee Nuclear Power Station. The mid-cycle review for Vermont Yankee Involved the participation of all technical divisions In evaluating performance for the first half of the calendar year 2004 assessment cycle. The process Included a review of performance Indicators (PIs) for the most recent quarter and Inspection results over the previous twelve months. The purpose of this letter Is to Inform you of our assessment of your safety performance during this period and our plans for future Inspections at your facility so that you will have an opportunity to prepare for these Inspections and to Inform us of any planned Inspections that may conflict with your plant activities.
This performance review and enclosed Inspection plan do not Include physical protection Information. A separate letter designated and marked as 'Proprietary Information In accordance with 10 CFR 2.390(d)(1) will Include the physical protection review and resultant Inspection plan.
Plant performance for the most recent quarter was within the Licensee Response Column of the NRC's Action Matrix, based on all Inspection findings being classified as having very low safety significance (Green) and all PIs Indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct only reactor oversight process (ROP) baseline Inspections at your facility through March 31, 2006.
The enclosed Inspection plan details the Inspection, less those related to physical protection, scheduled through March 31, 2006. Our Inspection plan Includes an Inspection during the week of November 29, 2004, using Inspection procedure IP 71004 'Power Uprate." This Inspection will review Vermont Yankee's erosion and flow assisted corrosion program. This Is one of several inspections using IP 71004 that will occur as a result of Entergy's power uprate request. We will develop the schedule for the subsequent Inspections using IP 71004 as they become finalized based on the progress of our review of Entergy's power uprate request. The Inspection plan is provided to minimize the resource Impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved In advance of Inspector arrival onsite. Routine resident Inspections are not listed due to their ongoing and continuous nature. The Inspections in the last
Lawrence Doerflein r2004 Mid-Cycle Letter - VY.final.pdf - Page 2 Mr. Jay K. Thayer 2 twelve months of the Inspection plan are tentative and may be revised at the end-of-cycle review meeting.
In accordance with 10 CFR 2.390 of the NRC's 'Rules of Practice.' a copy of this letter and its enclosure will be made available electronically for public inspection In the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS Is accessible from the NRC Web site at hltpJ/www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change the Inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (610) 337-5227 with any questions you may have regarding this letter or the Inspection plan.
Sincerely, IRAI Clifford J. Anderson, Chief Projects Branch 5 Division of Reactor Projects Docket No. 50-271 License No. DPR-28
Enclosure:
Vermont Yankee InspectionlActivity Plan
Lawrene Doerflein-2004 Mid-Cycle Letter- VY.final.pdf Page 3 Mr. Jay K. Thayer 3 cc w/encl:
M. R. Kansler, President, Entergy Nuclear Operations, Inc.
G. J. Taylor, Chief Executive Officer, Entergy Operations J. T. Herron, Senior Vice President and Chief Operating Officer D. L. Pace, Vice President, Engineering B. O'Grady, Vice President, Operations Support J. M. DeVincentis, Manager, Licensing, Vermont Yankee Nuclear Power Station Operating Experience Coordinator - Vermont Yankee Nuclear Power Station J. F. McCann, Director, Nuclear Safety Assurance M. J. Colomb, Director of Oversight, Entergy Nuclear Operations, Inc.
J. M. Fulton, Assistant General Counsel, Entergy Nuclear Operations, Inc.
S. Lousteau, Treasury Department, Entergy Services, Inc.
Administrator, Bureau of Radiological Health, State of New Hampshire Chief, Safety Unit, Office of the Attorney General, Commonwealth of Mass.
D. R. Lewis, Esquire, Shaw, Pittman, Potts & Trowbridge G. D. Bisbee, Esquire, Deputy Attorney General, Environmental Protection Bureau J. Block, Esquire D. Katz, Citizens Awareness Network (CAN)
M. Daley, New England Coalition on Nuclear Pollution, Inc. (NECNP)
R. Shadis, New England Coalition Staff C. McCombs. Commonwealth of Massachusetts, SLO Designee G. Sachs, President/Staff Person, cdo Stopthesale J. Sniezek, PWR SRC Consultant R. Toole, PWR SRC Consultant J. P. Matteau, Executive Director, Windham Regional Commission State of New Hampshire, SLO Designee State of Vermont, SLO Designee Institute of Nuclear Power Operations (INPO)
I Lawrence Doerflein.- 2004 Mid-Cycle Letter - VY.final.Ddf Page 41 Paae 41 I Lawrence Doertlein.- 2004 Mid-Cycle Letter VY.tlnal.Ddf Mr. Jay K. Thayer 4 Distribution: (via E-mall)
S. Collins, RA J. Wiggins, DRA A. Blough, DRP B. Holian, DRP W. Lanning, DRS R. Crlenjak, DRS DRS Branch Chiefs (5)
D. Screncl, PAO N. Sheehan, PAO C. Anderson, DRP D. Florek, DRP D. Pelton, Senior Resident Inspector C. Miller, OEDO J. Clifford, NRR R. Ennis, PM, NRR T. Tate, Backup PM, NRR RidsNrrDipmlipb Region I Docket Room (with concurrences)
DOCUMENT NAME: G:\DRP\BRANCH5\Assessment Letters\VY\2004 Mid-Cycle Letter - VY.wpd After declaring this document 'An Official Agency Record' It will be released to the Public.
To recelve* eopy ot thl document, Indlcats In the box: 'C' - Copy without attachmenVenclosure E
- Copy with attachmenttenclosure IN'
- No copy OFFI CE RI / DRP R RID DRP I / L NAME DFI or ek/ CJA CAnder son/ CJA I DATE 08/ 27/ 04 08/ 27/ 04 08/ /04 08/ / 04 OFFI CI AL RECORD COPY
. - - . - - - - - - - - - - - - - - -- . -- 3 I Lawrence Doertlein. 2004 Mid-Cycle Letter - VY.final.pdf Paae 51 P.O. I.1 2 Vernont Yankee 04 14 0014 If2/2 Inspection I Activity Plan R.".1t a 071112004
- 03)3112000 uxmt .T P..u.
I pNumber p.p..Aetb.
. Iy II TWO I en an. Sult ""'End "' Type
! STI0
- SPECIAL INSPECTION ON VY FUEL SEGMENTS II"' "I 7
""" 11 , I 1 P 9s312 Spn.1hI .p.e0.. 04/22)004 00/103 004 Son.M R.%p... Nhp.
Tl1,41
- FUNCT. REVIEW OF HIGH RISK
I r 251SM10 FP.II. R-l. .1 L. M .9W0/RkSg400l C .nl- *.d 14 - A.l. 04/20004 0/02004 5I.f 1 b..-.
71152 -Pa SAMPLE MSIV LLRT FAILURES IF 7112 bM n4_1...dR-oib-.lP..bh.. 07/o012004 o0 2N04 4.0-- I..peef 71121
- OCC MAD SAFETY IF **12101 A .-. C.t4dl 1. R.d0ogbll.4y 41SlON l AA- 07112/2004 nGlI20o4 R1-.- Ino.p..
F T112102 ALARAP%..V .nd Ce_ 47/12200 01n/102004 ... INP.n-7111111S -LO REOUALIFICATION PRORAIM r 11111110 L1...d o p.pe.. R 0 P..o . 0020/004 04 22004 0..-M. k p .4 1 7111111S U--..d Op... Req..-ll - Pg. m 00/122004 00 0/204 B-..k INV - ON1 71114 . EP PROM INSP A Pl VERIFICATION
- P 7111402 AlWI..d NoObeN.. S".b T..t0g 07/264/004 07/20/2004 tP 11140 Emnqnn uRp_...0W *00Agm m. ro..- n0g 07/2004 07/2004 le..k, Io-Peft..
- 7111404 Em-g-_y A~e L .1.n Em n P - Ch-l.. 07/2/2004 07/20/2004 O.. k.0. o p.
t *111400 C..... *I E..%.g.. P.p.,edn- Wnk-.-. nd 0.D0.1. 07/2/004 012004 S...k.. I..Peft.o t 111 P.4dnmmm Wb IW Vl.00 07//004 07122004 7111121 ENGINEERING PILOT r 7111121 0.f.0 Dye. 0-g .4 endP.lb- C.9p.buy 0000/2004 001537004 B...kh. Io"e IF 7111121 .1l.0/ Sy m. D..lgn *.dP.d...... C pbaky 00/102004 44/204 B.-b- Inepe4tne IF 7111121 1.1.%v vy.0. .. n4.4dP.O. -.... C.P.0 0y 00/20 004 04/02/2004 0.-b- I..p..eo 7112201 PUB RAD SAFETY .RETS
- 7112201 R .0. 0D.. end LJWWd rSmln T, *.M.dM-%.6r Sy.m-. 0WM1200 */12004 0.0.00 k0peo 7112103
- OCC RAG SAFETY - INSTRUMENTATION IP 7112103 R dlullon M...0.4.g h ondP.iwe...
eIrom EI.l0M 101/2004 OS/02004 D.-_ I-peftn Ms~OoV si>2004 ll ll.- -. IW4 N 71111t0
- TRIENNIAL FIRE PROTECTION INSPECTION a r 7111104T Fl.. P l, 4 11/25/004 12/03/2004 B.-.b- kek.n.
I P71111001 Fl".P.01.4- 12112/2004 127/24 ..- r- INp-n.
7111107B
- HEAT SINK V 71111078 M..[IS 0 P.dnm 11/102004 11/10/2004 I.. INP.0.
I 11WlOPOn 000 1104 1100 00U 0.0 LW IRON 0*
I T: h =1 p d0l 0. 0 / 0. . . 0 4 ,." p. . . . I
. oor. - -- - - - - - -- - - - -
g Lawrence Doertlein - 2004 Mid-Cycle Letter - vy.final.pdf Page 61 P.,.,.. a Vermont Yankee 50 02004 10:0514 Inspection I Activity Plan R.p-lI 22 07J0112004 - 03/311200s I
N Jn-polon A.tloky l I.bpt II TWlO -IIonat.
rW--7FM1 'tf I.-n Doi.
Eo I TV" I EPU
- EPU REVIEW . EROSIONJFAC PROORAM I P 71404 P".. Up..l. 11000o04 12022004 00h., A-*.o 1JS1 EXU . OPERATOR LICENSINO INITIAL EXAMS a I 01S40 VERMONTYANKEE INITIALEXAMnvo4=) IV120004 1217004 Nol A 20 10bl.
I 101o40 VERMONTYANKEE INITIALEXAMP0n40) 01o1M S e24200s N-o A9P1-0I.
71111178 .MODS , S0J5 a P 7111102 Eo.5.0 0. Ch..Fo.. T.o.N.. E.rn.M 04011,005 04115.0s E 10ov-.ao
- o. o I P 7I111S7B P. PU1Mr M04r
-0..n.1 ) 0. . 04)1100S 04415)2004 E... 1o p..s--ra 7111401 EXERCISE EVALUATI0N A EP Pi VERIFICATION r 71 401 wP Ec...I00 E .0.00,.l 05)2)2005 no 0o)2700 .1r hr0p r0_
I P 71101 P.4on, .....010. l .......
a.l 05)212005 055 7 0000 E .. 0 10.9.050..
7112202 . PUB RAD SAFETY . RADWASTE r 7112202 R5r4 r M.61rI P-"r0rg rud Tr.sponorf. 0o07n000 070.12000 S-1h. hrs.
71121
- OCC RAD SAFETY P 7112101 A-. C-W nb Rodlologoy O)nillo- A..-. o05000005 08120005 s r 1 .1h rpn0.1-.
IP 7112102 ALARA PIln.lng 004C-nr4 050502005 05412a000s h- hPr.n I _
71152S - PROBLEU IDENTIFICATION AND RESOLUTION IP 71128 k4i.Ofon. rud Ro.o10No. of PrS.n o5W12000s 0901005I s-, .
r4--4-_
PP 711023 Fnrran rrnd R-..r .1Pof b. 000005 0o)2n00os B-54h. 1.Ps1-0r._
71121 - oCC RAD SAFETY P 7112101 A-. C... o1 PRod0bgur.y SVWl-I A... 11071270000 1/001 5 51.r0 1h-hr 1r P 7112102 ALARAPn1.4 rrnd C nrroD 10117n000 1001s 0000 5 .oos k p.10 .
P 71151 P.O . ... 1.0.61oV. 0v0 10 7 0 00 0 10 010 00 0 S .. 0 4,0 .r. a.
71111000 - INSERVICE INSPECTION r 71111050 1W-W.I05p01o, A.VW . ESWR no 1W2402005 102000005 1 .os 1 0.h ..
7112202 . PUS RAD SAFETY . REMP IP 7112203 RdkfoIg 0 E n .n I M.01010g P,. 0
... 12/0.,000 120.0005 S... . . 0lh9.0p.. .
7111112E
- MAltTENANCE RULE P 71111128 MI,, EV-- -- 121n2000s 1v2 noo5 SB..o .h.hr9.0.
71121
- OCC RADLATION SAFETY IP 7112102 ALARAPb.4.*V rnd C norn 010 0000 om 01)3200 B.-.h. 10.p0ra.
5 105 109000000 105 00.10400.VU 000 UUIAUO 000N0*
I 71 . 0 9 0 5=00 0 5.p00 0 0. . 0 0 6 0 9 0 d.00
- 0. . . I
__U
,AGW)00001.T.MP 11 Page 1 Paae I AGW 100001 .TMP Mail Envelope Properties (4134F123.378: 20: 9382)
Subject:
2004 Vermont Yankee Mid-Cycle Creation Date: 8/31/04 5:44PM From: Linda Larche Created By: LML2@nrc.gov Recipients kpl-po.KPDO ALR (Amanda Rancourt)
CJA (Cliff Anderson)
DJF1 (Donald Florek)
DLP1 (David Pelton) owf4_po.OWFN_DO JWC (James Clifford)
RXE (Rick Ennis)
TLT (Travis Tate) nrc.gov kpl_po.KP._DO ARB (A. Randolph Blough)
BEH (Brian Holian)
GRM (Gina Matakas)
JFR (John Rogge)
JRW1 (John White)
JTW1 (James Wiggins)
LTD (Lawrence Doerflein)
NAS (Neil Sheehan)
RJC (Richard Conte)
RKL (Raymond Lorson)
RVC (Richard Crienjak)
SJC1 (Samuel Collins)
WDL (Wayne Lanning) nrc.gov owf4_po.OWFN_DO RidsNrrDipmlipb (RidsNrrDipmlipb) nrc.gov owf5_po.OWFN_DO CGM (Chris Miller)
L ;,GW)00001.TMP Page 21
- \.
-Post Office Route kpl-po.KP.-DO owf4_po.0WFN_DO kp1_po.KPDO nrc.gov owf4_po.OWFN_DO nrc.gov owf5_po.OWFN_DO nrc.gov Files Size Date & Time MESSAGE 921 08/31/04 05:44PM 2004 Mid-Cycle Letter - VY.final.pdf 26230 08/31/04 05:32PM Options Expiration Date: None Priority: Standard Reply Requested: No Return Notification: None Concealed
Subject:
No Security: Standard