i Lawronce Doerflein - re: VY engineering inspection Page 1 1 Lawronce Doerflein - re: VY enaineerina insDection Paae 1 I From:
To:
Date:
Subject:
Lawrence Doerflein Neil Sheehan 8/26/04 5:14PM re: VY engineering inspection
- Neil, The team manager says the list of components (therefore systems) is pre-decisional. He has a point since the team is actually still whittling down the initial population of risk significant components selected to a smaller list for the more detailed review. If we released components that don't make the final list, we'd have to explain that later.
The generic answer is that the team has selected risk significant components for review from the emergency core cooling systems, the containment system, power conversion systems, and auxiliary systems.
- Regards,
/
Larry
>>> Neil Sheehan 08/26/04 04:31 PM >>>
- Larry, A reporter for the Brattleboro (Vt.) Reformer asked if we can provide a list of systems being looked at in the engineering inspection. What say you?
Neil CC:
Fred Bower; Gregory Bowman; Jeffrey Jacobson; Michelle Snell; Wayne Lanning k 1.0410-V
I c:\\temD\\GWI00002.TMP Paae 1 i c:te GWQOO TP ae Mail Envelope Properties (412E529B.B59: 0: 35304)
Subject:
Creation Date:
From:
Created By:
re: VY engineering inspection 8126104 5:14PM Lawrence Doerflein LTD @nrc.gov Recipients kpl-po.KP._DO GTB 1 CC (Gregory Bowman)
MPS4 CC (Michelle Snell)
WDL CC (Wayne Lanning) nrc.gov kpl-po.KPLDO FLB CC (Fred Bower)
NAS (Neil Sheehan) nrc.gov owf4Cpo.OWFf JDO JBJ CC (Jeffrey Jacobson)
Action Date & Time Delivered 08/26/04 05:14PM Opened 08/30/04 12:50PM Deleted 08/30/04 12:50PM Emptied 09/07/04 01:04AM re: VY engineering inspection Opened 08/27/04 07:12AM Deleted 08/27/04 02:05PM Emptied 09/04/04 01:04AM re: VY engineering inspection Opened 08/27/04 07:48AM Deleted 10/01/04 09:05AM Delivered 08/26/04 05:14PM Opened 08/26/04 05:14PM Emptied 10/05/04 07:23AM re: VY engineering inspection Opened 08/26/04 05:25PM Delivered 08/26/04 05:14PM Opened 08/27/04 08:48AM Deleted 08/27/04 08:49AM Emptied 09/01/04 01:21AM re: VY engineering inspection Post Office kpl-po.KPl._DO kpl-po.KPDO owf4_po.OWFNDO Delivered 08/26/04 05:14PM 08/26/04 05:14PM 08/26/04 05:14PM Route nrc.gov nrc.gov Files MESSAGE Options Auto Delete:
Size 1781 Date & Time 08/26/04 05:14PM No
I c:\\temp\\GW}00002.TMP Page 21 Expiration Date:
Notify Recipients:
Priority:
Reply Requested:
Return Notification:
Concealed
Subject:
Security:
None Yes Standard No None No Standard To Be Delivered:
Status Tracking:
Immediate All Information