Master Inspection Plan - FY2006
ML052780538
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/04/2005
From: Jamnes Cameron
NRC/RGN-III/DNMS/DB
To: O'Connor W
Detroit Edison
References
Download: ML052780538 (3)


Text

October 4, 2005 Mr. William OConnor, Jr.

Vice President Nuclear Generation The Detroit Edison Company 6400 North Dixie Highway Newport, MI 48166

SUBJECT:

FERMI UNIT 1 MASTER INSPECTION PLAN - FISCAL YEAR (FY) 2006

Dear Mr. OConnor:

In accordance with NRC Manual Chapter 2561, Decommissioning Power Reactor Inspection Program, the NRC Region III staff and management have developed a Master Inspection Plan (MIP) for Fermi Unit 1. The plan is based on your current performance and schedule of significant decommissioning activities planned for the site for October 2005 through September 2006 (FY2006). The plan outlines how we intend to focus our Regional inspection resources to address significant ongoing decommissioning activities.

Because the FY2006 MIP is based, in part, on your proposed schedule of significant decommissioning activities for FY2006, the plan and the focus of NRC inspection activities may change to reflect a change in your planned decommissioning activities or your performance. In order to ensure that the FY2006 MIP remains current, we request that you keep the Decommissioning Branch staff informed of any significant changes in your proposed schedule of decommissioning activities. You will be informed of any significant changes to the Fermi Unit 1 FY2006 MIP.

We currently project the Region will conduct two inspections at Fermi Unit 1 during FY2006.

The following is a list of the inspection procedures we expect to use during our inspections.

The specific procedures used during each inspection will depend on the specific decommissioning activities being conducted. Additional inspection procedures may be used or inspections conducted if decommissioning activities warrant.

Inspection Procedure Inspection Procedure Title IP 36801 Organization, Management and Cost Controls IP 37801 Safety Reviews, Design Changes, and Modifications IP 40801 Self-Assessment, Auditing, and Corrective Action IP 71801 Decommissioning Performance and Status Review IP 83750 Occupational Radiation Exposure IP 84750 Radioactive Waste Treatment, and Effluent and Environmental Monitoring IP 86750 Solid Radioactive Waste Management and Transportation of Radioactive Materials

W. OConnor In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). The NRCs document system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

We will gladly discuss any questions you may have regarding these inspection plans. If you have questions, please contact Dr. Peter Lee of my staff at (630) 829-9870.

Sincerely,

/RA/

Jamnes L. Cameron, Chief Decommissioning Branch Docket No. 05000016 License No. DPR-9 cc: N. Peterson, Director, Nuclear Licensing D. Pettinari, Legal Department Compliance Supervisor G. White, Michigan Public Service Commission L. Brandon, Michigan Department of Environmental Quality -

Waste and Hazardous Materials Division Monroe County, Emergency Management Division Planning Manager, Emergency Management Division MI Department of State Police Distribution:

Docket File C. M. Craig, NMSS T. Smith, NMSS G. E. Grant, RIII S. Reynolds, RIII RIII Enf. Coordinator SRI Fermi RIII PRR CAC (e-mail)

DOCUMENT NAME:E:\Filenet\ML052780538.wpd XPublicly Available G Non-Publicly Available G Sensitive X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME Lee:mb Cameron DATE 09/27/05 10/04/05 OFFICIAL RECORD COPY