Technical Specification Page Clarification of Inservice Test and Inservice Inspection TS Requirements
ML052780369
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 10/04/2005
From:
Office of Nuclear Reactor Regulation
To:
Jaffe D, NRR/DLPM, 415-1439
Shared Package
ML052980012 List:
References
TAC MC7515, TAC MC7516
Download: ML052780369 (1)


Text

APPLICABILITY SURVEILLANCE REQUIREMENTS 4.0.1 Surveillance Requirements shall be met during the OPERATIONAL MODES or other conditions specified for individual Limiting Conditions for Operation unless otherwise stated in an individual Surveillance Requirement.

Failure to meet a Surveillance Requirement, whether such a failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the Limiting Conditions for Operation. Failure to perform a Surveillance within the specified surveillance interval shall be failure to meet the Limiting Conditions for Operation except as provided in Specification 4.0.3. Surveillances do not have to be performed on inoperable equipment or variables outside specified limits.

4.0.2 Each Surveillance Requirement shall be performed within the specified surveillance interval with a maximum allowable extension not to exceed 25 percent of the specified surveillance interval.

4.0.3 If it is discovered that a Surveillance was not performed within its specified surveillance interval (including the allowed extension per Specification 4.0.2), then compliance with the requirement to declare the Limiting Condition for Operation not met may be delayed, from the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified surveillance interval, whichever is greater.

This delay period is permitted to allow performance of the surveillance. A risk evaluation shall be performed for any Surveillance delayed greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and the risk impact shall be managed.

If the Surveillance is not performed within the delay period, the Limiting Condition for Operation must immediately be declared not met, and the applicable Condition(s) must be entered. When the Surveillance is performed within the delay period and the Surveillance is not met, the Limiting Condition for Operation must immediately be declared not met and the applicable Condition(s) must be entered.

4.0.4 Entry into a MODE or other specified condition in the Applicability of an LCO shall only be made when the Surveillance Requirement(s) associated with the LCO have been met within their specified Frequency, except as provided by Specification 4.0.3. When an LCO is not met due to Surveillance Requirement(s) not having been met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with Specification 3.0.4. This provision shall not prevent entry into MODES or other specified conditions in the Applicability that are required to comply with ACTIONS or that are part of a shutdown of the unit.

4.0.5 Surveillance Requirements for inservice inspection and testing of ASME Code Class 1, 2, and 3 components shall be applicable as follows:

a. Inservice testing of ASME Code Class 1, 2, and 3 pumps and valves, and inservice inspection of ASME Code Class 1, 2, and 3 components shall be performed in accordance with Section Xl of the ASME Boiler and Pressure Vessel Code and applicable Addenda as required by 10 CFR Part 50, Section 50.55a(f) and Section 50.55a(g), except where specific written relief has been granted by the Commission pursuant to 10 CFR Part 50, Section 50.55a(f)(6)(i) or Section 50.55a(g)(6)(i), or where the component has been found to qualify for exemption from special treatment; SOUTH TEXAS - UNITS 1 & 2 3/4 0-3 Unit 1 - Amendment No. 24-0-95,41445, -7 73 Unit 2 - Amendment No. 11, 82, 129, 133, 158' 61